Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH q, 6YO SEWAGE PLAN REVIEW CHECKLIST Location: AM WC, LOT (k Date of Subdivision Approval Street CO 7 /. _ins 4 Zone of Contribution: In Out Village /r t t Commercial Residential , t Owner: tce �� Installer piCii� <Vs- S-' Builder: Engineer /'h.) 0 N/A YES NO 1. Required number of copies received. �/ 2. Date of soils exam and percolation test not older than 2 years. t/ 3. 4 feet of naturally occurring pervious material, above water table(new constructions L...--- 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. i/ 6. Benchmark indicated and shown - NGVD if near wetlands. L.---4-- 7. BuiIding sewer does not exit center of house. ,- - 8. Septic tank a minimum of 10 feet from house and deck. L 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. �� 11. Leaching a minimum of 150 feet from drinking wellsi25 feet from irrigation wells. �------ 12. System meets all other setback requirements. �✓ 13. Uses adjustment for maximum high groundwater. ✓ 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. L. 15. System not in top or subsoil or 5 fooj removes- �� 16. Proposed contours are suitable. l/ 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. L/ 19. Specified tee sizes are proper, gas baffle on outlet tee. r 20. Sewage flow under 10,000 gpd for parcel. 21. No garbage disposal. 22. System adequately sized for its intended use. -f 23. Minimum 6" stone or mechanically compacted below the tank and d-box. f 24, Manhole covers within 6" of grade - septic tank and pump chamber. �---- 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed, 28. Vent provided if leaching below 3 feet or under driveway marking, 29. Engineer to inspect and certify : a. clay removal `� b, wall construction schedule --� c. commercial system 30. Engineer and Land Surveyor stamp and signature, 31. H2O loading when system subject to vehicular traffic. 32 Title V application and fee signed by a licensed installer 33. Foundation footing 2 feet above adjusted water table, 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading, j 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: