HomeMy WebLinkAboutPictures of 6 Wellfleet Ave
Roten floor sills and joists
Floor
Floor
Floor
Floor
Bolted collar �es and strapping the walls to the few ra�ers
Bracing the end by the structure to be demolished
The sub floor is 3/4 “ tongue and groove plywood glued and nailed with galvanized ring shank 8d. This
part of the structure that we’re saving will withstand the 2 moves needed to put it in place on the new
founda�on