HomeMy WebLinkAboutCOC requestLe&Ue3�r L' OFC SC 65- 3 20
CONSERVATION
OFFICE
r
•.r_•�.�_� r..c�.rr.A...c_r
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzo(cDvarmouth.ma.us.
Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*.
Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel -related Conservation documents.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(a,yarmouth.ma.us
Rev 8/2022
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
August 30, 2023
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-320 (198A South Street, South Yarmouth)
Dear Commission Members:
tel. (508) 362-4541
fax(508)362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E.
Craig J. Ferrari, E.I.T., S.E.
On October 22, 1981, the Commission issued an Order of Conditions
for the above -referenced site, for the construction of a timber
pier addition.
A site visit/inspection/asbuilt were made for the purpose of
closing out the Order of Conditions. The 8' by 64' extension that
was approved under this Order was built in accordance with the
plan of record.
This is to certify, to the best of my knowledge and belief, that
the work was performed in substantial compliance with the approved
plan and Order of Conditions. We hereby request the issuance of a
Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information
DEP File Number:
SE83-320
Provided by DEP
Important:
When filling out 1. This request is being made by:
forms on the Charles White Management, Inc.
computer, use Name
only the tab 330 Commonwealth Avenue
key to move
your cursor - Mailing Address
do not use the Boston MA 02115-2117
return key. City/Town State Zip Code
fQ Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
' Robert White
Applicant
10/23/81 SE83-320
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Dated
3. The project site is located at:
198A South Street
Street Address
34
Assessors Map/Plat Number
DEP File Number
South Yarmouth
City/Town
301
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
124170 Doc.287912
Certificate (if registered land)
5. This request is for certification that (check one):
Book
Page
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. Project Information (cont.)
DEP File Number:
SE83-320
Provided by DEP
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-you r-city-o r-town. html).
wpaformSa.doc •• rev. 5/29/14 Page 2 of 2