Loading...
HomeMy WebLinkAboutCOC request�Zea1/0 I G'vFG ��83- Z7'f CONSERVATION OFFICE All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. Contact the Conservation Office if you need assistance. 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzo(cDvarmouth.ma.us. Statement from Engineer and/or stamped As -Built plan if required under the Order of Conditions to be included with both original and pdf application. Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*. V Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Fil inq-Forms. *Click Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(a,yarmouth.ma.us Rev 8/2022 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors August 30, 2023 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE 83-274 (198 South Street, South Yarmouth) Dear Commission Members: On September 4, 1981, the for the above -referenced at 198 South Street. E Commission issued an Order of site, for the construction of tel. (508) 362-4541 fax(508)362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari, E.I.T., S.E. Conditions n addition A site visit/inspection was made for the purpose of closing out the long -expired Order of Conditions. The certified plot plan is enclosed, dated 10/6/81. The following was noted: • No drywells were observed (roof run-off is dissipated via moss "channels" and sandy soils - no erosion is occurring) • The driveway is paved. As part of a septic upgrade design, it is shown existing as paved in 1995. No run-off occurs off the property or onto the street; a catch basin is within the lawn. • It appears the old dwelling was raised up and placed on a new foundation to meet the new addition foundation elevation. We noted that since this permit issued, other additions/decks were constructed but were not a part of this permitting process. This is to certify, to the best of my knowledge and belief and with the minor exceptions listed above, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: SE83-274 Provided by DEP A. Project Information 1. This request is being made by: Charles White Management, Inc. Name 330 Commonwealth Avenue Mailing Address Boston MA 02115-2117 City/Town State Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Robert White Applicant 9/4/81 SE83-274 Dated DEP File Number 3. The project site is located at: 198 South Street South Yarmouth Street Address City/Town 34 302 Assessors Map/Plat Number Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Property Owner (if different) Barnstable County 124170 Doc.272913 Certificate (if registered land) 5. This request is for certification that (check one): Page ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance SE83-274 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (com.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass,gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-you r-city-or-town. html). wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 to ry K r v�j t Is r� a aL.t v �z e:7r'j ', w DISTANCE AS CERTIFIED I HEREBY CERTIFY THAT THE BUILDING OF l>9gis SITE PLAN IN ON THIS PLAN IS LOCATED ON THE IND AS SHOWN HEREON & THAT iT� ` `" Lc� l� �� G LOCUS: t � �' #,RRlE � � ORM TO THE ZONING BY LAWS OF THE CONSTRUCTED. DATE i�? 1 " .12634.8 REF:iown cape engineering its 0 0 � PREPARED FOR: P CIVIL ENGINEERS 4LAND SURVEYORS � ' REG. LAND SURV YOR Yarmouth & Orleans, MA SCALE DATE 0