HomeMy WebLinkAboutCOC request�Zea1/0 I G'vFG ��83- Z7'f
CONSERVATION
OFFICE
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzo(cDvarmouth.ma.us.
Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*.
V Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Fil inq-Forms.
*Click Yarmouth Street Index for parcel -related Conservation documents.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(a,yarmouth.ma.us
Rev 8/2022
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
August 30, 2023
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate of Compliance
SE 83-274 (198 South Street, South Yarmouth)
Dear Commission Members:
On September 4, 1981, the
for the above -referenced
at 198 South Street.
E
Commission issued an Order of
site, for the construction of
tel. (508) 362-4541
fax(508)362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E.
Craig J. Ferrari, E.I.T., S.E.
Conditions
n addition
A site visit/inspection was made for the purpose of closing out
the long -expired Order of Conditions. The certified plot plan is
enclosed, dated 10/6/81.
The following was noted:
• No drywells were observed (roof run-off is dissipated via
moss "channels" and sandy soils - no erosion is occurring)
• The driveway is paved. As part of a septic upgrade design,
it is shown existing as paved in 1995. No run-off occurs off
the property or onto the street; a catch basin is within the
lawn.
• It appears the old dwelling was raised up and placed on a new
foundation to meet the new addition foundation elevation.
We noted that since this permit issued, other additions/decks were
constructed but were not a part of this permitting process.
This is to certify, to the best of my knowledge and belief and
with the minor exceptions listed above, that the work was
performed in substantial compliance with the approved plan and
Order of Conditions. We hereby request the issuance of a
Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
DEP File Number:
SE83-274
Provided by DEP
A. Project Information
1. This request is being made by:
Charles White Management, Inc.
Name
330 Commonwealth Avenue
Mailing Address
Boston MA 02115-2117
City/Town State Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Robert White
Applicant
9/4/81 SE83-274
Dated DEP File Number
3. The project site is located at:
198 South Street South Yarmouth
Street Address City/Town
34 302
Assessors Map/Plat Number
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Property Owner (if different)
Barnstable
County
124170 Doc.272913
Certificate (if registered land)
5. This request is for certification that (check one):
Page
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance SE83-274
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information (com.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass,gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-you r-city-or-town. html).
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
to
ry
K
r
v�j
t Is
r� a
aL.t v �z e:7r'j ', w
DISTANCE AS CERTIFIED
I HEREBY CERTIFY THAT THE BUILDING OF l>9gis SITE PLAN
IN ON THIS PLAN IS LOCATED ON THE
IND AS SHOWN HEREON & THAT iT� ` `" Lc� l�
�� G LOCUS: t
� �' #,RRlE � �
ORM TO THE ZONING BY LAWS OF THE
CONSTRUCTED. DATE i�? 1 " .12634.8
REF:iown cape engineering its
0 0 �
PREPARED FOR:
P CIVIL ENGINEERS
4LAND SURVEYORS �
' REG. LAND SURV YOR
Yarmouth & Orleans, MA SCALE DATE 0