Loading...
HomeMy WebLinkAboutCOC request%l 9&)Ue3r rM. COP 51✓Sc?5' � / 3 19 CONSERVATION OFFICE All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. Contact the Conservation Office if you need assistance. 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. V 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzo(cDvarmouth.ma.us. V Statement from Engineer and/or stamped As -Built plan if required under the Order of Conditions to be included with both original and pdf application. Refer to 310 CMR 10.05(9)(d). Refer to issued Order of Conditions*. V Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth" and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel -related Conservation documents. Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno(warmouth.ma.us Rev 8/2022 939 main street rt 6a yarmouth port mass 02675 land court surveys August 30, 2023 structural design down cape engineering, inc civil engineers & land surveyors Yarmouth Conservation Commission 1146 Route 28 site planning South Yarmouth, MA 02664 sewage system designs inspections permits Re: Request for Certificate of Compliance SE 83-1319 (15 Highland Street, West Yarmouth) Dear Commission Members: tel. (508) 362-4541 fax (508) 362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala P.E., P.L.S. Daniel E. Gonsalves, P.E., S.E. Craig J. Ferrari, E.I.T., S.E. On 3/23/95, the Commission issued an Order of Conditions for the above -referenced site, for the addition of fill on a Coastal Bank, within Land Subject to Coastal Storm Flowage. A site visit/inspection/asbuilt were made for the purpose of closing out the Order of Conditions. Approximately 50 to 55 yds of fill had been added to the rear of the dwelling, providing a more level back yard. The grass (not sod or irrigated) was extended. The area is completely stable, with a thick buffer of vegetation between the lawn and wetland. During the inspection an old concrete wall was discovered near the wetland, completely covered in vegetation. This was not seen during the original survey and so was not shown on the record plan. Sometime between 1995 and recent times, a paver driveway (open joints) was installed in place of the gravel driveway. This is to certify, to the best of my knowledge and belief, that the work performed under this Order was completed in substantial compliance with the approved plan and Order of Conditions, with small deviations in the final grading. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. T.' Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information 1. This request is being made by: VIRGIL INDRESANO Name 13 AQUEDUCT ROAD Mailing Address NATICK City/Town 508-400-0067 Phone Number MA State req 2. This uest is in reference to work regulated by a final Order of Conditions issued to: JOEINDRESANO Applicant 3-23-1995 Dated 3. The project site is located at: 15 HIGHLAND STREET Street Address 20 Assessors Map/Plat Number SE83-1319 DEP File Number WEST YARMOUTH Cityfrown 47.1 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: JOEINDRESANO Property Owner (if different) BARNSTABLE County Certificate (if registered land) 5. This request is for certification that (check one): FV 9625 Book DEP File Number: SE83-1319 Provided by DEP 01760 Zip Code 320 Page of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the work regulated by the above -referenced Order ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. Page 1 of 2 wpaform8a.doc •• rev. 5/29/14 Massachusetts Department of Envi Mronmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information (cont.) DEP He Number: Provided by DEP 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? t;2r�Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http //www, mass goy/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town. html). Page 2 of 2 wpaform8a.doc •• rev. 5129/14 �