Loading...
HomeMy WebLinkAbout5031 212 Mid Tech Dr Grading Drainage Erosion Control Plan Revised 08.17.23MID-TECH DRIVEBAXTER NYEENGINEERING &SURVEYINGJDB 212 Mid-Tech Drive, LLCc/o Turtle Rock, LLC231 Willow StreetYarmouthport, MA 02675Site Redevelopment186 & 212 Mid-Tech DriveWest Yarmouth, MA 02673FOR PERMIT ONLY - NOT FOR CONSTRUCTIONSHEET TITLEDATE:CHECKED BY:JOB NO:DRAWN BY:DESCRIPTIONDATEPREPARED FOR:PROJECT TITLESHEET NOSCALE:STAMPCONSULTANTFILE:CONSULTANTSTAMPCOPYRIGHT c 2021, BY SMART ENGINEERING LLC, dba BAXTER NYE ENGINEERING & SURVEYING, ALL RIGHTS RESERVED. REPRODUCTION IN ANY FORM WITHOUT THE EXPRESS WRITTEN CONSENT OF THE COPYRIGHT HOLDER IS PROHIBITEDC4.0Grading, Drainage, andErosion Control Plan O:\2021\2021-036\CIVIL\PLOT\2021-036 GD.dwg, 8/29/2023 8:50:30 AM, jlavelle, DWG To PDF.pc3, ARCH full bleed D (24.00 x 36.00 Inches), 1:1