HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location A.M. Lot(U0 7/3 e Zone of Contribution: In Out Acreage
Street: `frl ► l 4,� Commercial: Residential ��-
Village: S yo,j- „e,,��,,. Floor Plan: 3-
J,� Bedrooms:
Owner: w. Q�(lG I A. Installer: Scoff w ti�
Address: ' k
/� Ai.. Mali. 5',
Phone: I Y Phone: - ?Sr- lush
SOS-x/v„ - 411c
Builder: Engineer: A 018 C �1
Address: Sum
Phone: Phone: Aj- ?67 - f60-
N/A YES NO
1. Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table - -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: \/ - -
5. Water 'ine 10 ft from septic components Var.: I -
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic ank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking wel1/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ` i
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements- ruin. 1/8", Y."preferred `�
18. System meets breakout requirements PVC liner: Wall: �'
19. Specified tee sizes are proper, gas baffle on outlet tee ✓
20. Sewage is under 10,000 gpd for parcel `/
21. No garbage disposalV
22. System Ldequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox
V
24. Manhole covers within 6"of grade, pump chamber cover to grade I 25. Inspection port on plastic chambers/leach field
26. Electrica permit for pump chamber/Separate meter for duplexes ✓
27. Pumpsystem-2"
line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under drivewayiparking uz
30. Buoyancy calculations for tank/pump chamber •
31. Engineer to inspect and certify soils: wall: commercial: I ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow:
37. Check area lots for groundwater/Label gpd
$r groundwater in Assessor's Map
Plan reviewed by: