Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH EWAGE PLAN REVIEW CHECKLIST /2_ i- -/ Location: AM 2 Z LOT 21.3 ,c . Date of Subdivision Approval Street // GUi:e /-- i/ Zone of Contribution: In Out Village ! W / �Gc. Commercial Residential Owner: /`t-L7kZ, Installer 771, Builder: Engineer �k- N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. N - 3. 4 feet of naturally occurring pervious material, above water table(new construction) %.,- 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown - NGVD if near wetlands. 7. Building_sewer does not exit center of house. / 8. Septic tank a minimum of 10 feet from house and deck. ,✓ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. ✓. 10. Leaching a minimum of 100 feet from wetlands. • 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. ! 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. �' 16. Proposed contours are suitable. ;/ 17. System meets slope requirements - min. 1/8". 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper, as baffle on outlet tee. u---' 20. Sewage Clow under 10.000 apd for parcel. 21. No garbage disposal. 22. System adequately sized for its intended use. ,/r 23. Minimum 6" stone or mechanically compacted below the tank and d-box. f 24. Manhole covers within 6" of grade - septic tank and pump chamber. ,/ 25. Electrical permit for pump chamber. ,' 26. Pump system - 2" line, weep hole, check valve. sanitary in d-box. alarm on separate circuit. .,------- 27. Septic tank and pump chamber to be Factory waterproofed. ✓' _ 28. Vent provided it leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31 . H2O loading when system subject to vehicular traffic. / 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior io April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: ' /`