HomeMy WebLinkAboutCorrespondence / Abutting Septic System Aurphy, Bruce
From: Daniel A. Ojala, PE PLS <downcape@downcape.com>
Sent: Tuesday, February 14, 2023 8:23 PM
To: Murphy, Bruce
Cc: Heatherlee Vermette
Subject: Jumper Pool Plan
Attachments: 20-260 JUMPER POOL PLAN REV 2-14-23.pdf
Attention!:This email originates outside of the organization. Do not open attachments or click links unless you are
sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure.
Otherwise delete this email.
Plan showing abutting septic systems per your request. No conflicts.
Daniel A. Ojala PE, PLS
down cape engineering, inc.
939 Main St. Yarmouthport, MA
1-508-362-4541 x106
1-508-362-9880 fax
downcape@downcape.com
This Electronic Message contains information
from the engineering firm of down cape engineering, inc.,
which may be privileged. The information is intended
to be for the use of the addressee only. If you are not
the addressee, note that any disclosure, copy, distribution
or use of the contents of this message is prohibited.
1
SELF —LATCHING GATES, SIZE AND MATERIALS TO MEET
LOCAL AND STATE BUILDING CODE, ALL DWELLING
DOORS OPENING TO POOL SHALL BE ALARMED TO
CODE.
n
LOCUS MAP
SCALE 1"=2000'f
ASSESSORS MAP 101 PARCEL
ZONING SUMMAR`
ZONING DISTRICT: R-40 DISTRI
MIN.
LOT SIZE
40,C
MIN.
LOT FRONTAGE
150'
MIN.
FRONT SETBACK
30'
MIN.
SIDE SETBACK
20'
MIN.
REAR SETBACK
20'
MAX.
BUILDING HEIGHT
35'
MAX.
BUILDING COVERAGE
25%
SITE IS LOCATED PARTIALLY WI
AQUIFER PROTECTION OVERLAY
SITE
#7 PAII
SOUTH YA
PREP