HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. ‘ I Lot /77 Zone of Contribution: lf{ Out_ Acreage r. CV
Commercial: Residential:
Street: c Lf )5 t/LC %XI
Village: Lssl6ri- Floor Plan: (/ #Bedrooms:
Owner: ffflvl ,/aa -C. Installer: g E_ 46i--iAZ-4571C
Address: Phone: .2. - 6.�S
Phone:
Builder: Engineer: /Q'' ct % (a./
Address: Phone: -� �() `-.-1
Phone:
N/A YES NO
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years f./-
3. 4-5 ft of naturally occurring pervious material, above water table t/�
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: c.,/
5. Water line 10 ft from septic components Var.: L`
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: _ t.
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: t/r
12. System meets all other setback requirements Var.: t..--------
13. Uses adjustment for maximum high groundwater Var.: i/
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,...---'
15. System not in top or subsoil(A,B horizons)or 5' removal l.--'
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 'A"preferred ( /
18. System meets breakout requirements PVC liner: Wall: iJ
19. Specified tee sizes are proper, gas baffle on outlet tee t//
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal (--/
22. System adequately sized for its intended use L/
23. Minimum 6"stone or compacted below tank and dbox _ ✓�
24. Manhole covers within 6"of grade,pump chamber cover to grade ,../
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes ....--'
27. Pump system-2" line,weep hole,check valve,tee in dbox, pump size ✓
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ _
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature `/
35.Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: -finax. flow: �; Ti-' gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map V
CPlan reviewed by: 6/03/03