Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ‘ I Lot /77 Zone of Contribution: lf{ Out_ Acreage r. CV Commercial: Residential: Street: c Lf )5 t/LC %XI Village: Lssl6ri- Floor Plan: (/ #Bedrooms: Owner: ffflvl ,/aa -C. Installer: g E_ 46i--iAZ-4571C Address: Phone: .2. - 6.�S Phone: Builder: Engineer: /Q'' ct % (a./ Address: Phone: -� �() `-.-1 Phone: N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years f./- 3. 4-5 ft of naturally occurring pervious material, above water table t/� 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: c.,/ 5. Water line 10 ft from septic components Var.: L` 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: _ t. 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: t/r 12. System meets all other setback requirements Var.: t..-------- 13. Uses adjustment for maximum high groundwater Var.: i/ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,...---' 15. System not in top or subsoil(A,B horizons)or 5' removal l.--' 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred ( / 18. System meets breakout requirements PVC liner: Wall: iJ 19. Specified tee sizes are proper, gas baffle on outlet tee t// 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal (--/ 22. System adequately sized for its intended use L/ 23. Minimum 6"stone or compacted below tank and dbox _ ✓� 24. Manhole covers within 6"of grade,pump chamber cover to grade ,../ 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes ....--' 27. Pump system-2" line,weep hole,check valve,tee in dbox, pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ _ 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature `/ 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: -finax. flow: �; Ti-' gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map V CPlan reviewed by: 6/03/03