HomeMy WebLinkAbout32 Woodbine Ave plan005A11C GUIDE TO WOOD CONSTRUCTION IN WIGH WIND AREAS 110 MPH WIND ZONE
MASSACI-IUSETTS CHECKLIST FOR COMPLIANCE (150 CMR 5301,11,1) COMPLIANCE
CHANCE
MPLIANGE
U SCOPE
WINDSPEED (3-SEC. GUST)----------------------------------------------------------------------------110 MPH
WINDEXPOSURE CATEGORY--------------------------------------------------------------------------------B
1.2 APPLICABILITY
NUMBER OF STORIES (A ROOF WHICH EXCEEDS 8 IN 12 SLOPE SHALL BE CONSIDERED A STORY)
2 STORIES < 2 STORIES _�Z
ROOFPITCH------------------------------------- -- (FIG 2)---------------------------------- < 12:12
MEAN ROOF HEIGHT---------------------------------- (FIG 2)------------------------------------4� FT < 33'
BUILDING WIDTH, W----------------------------------- (FIG 3)--------------------------------------2;� FT < 60'
BUILDING LENGTH, L--------------------------------- (FIG 3)------------------------------------- 9_FT < ad
BUILDING ASPECT RATIO (L/W)------------------------ (FIG 4)------------------------------------- 2-2S < 3:1
NOMINAL HEIGHT OF TALLEST OPENING2 ---------------- (FIG 4)-------------------------------------9� < 6' 8" �z_
1.3 FRAMING CONNECTIONS
GENERAL COMPLIANCE WITH FRAMING CONNECTIONS---_ (TABLE 2)--------------------------------------------- -��
2.1 FOUNDATION
FOUNDATION WALLS MEETING REQUIREMENTS OF 180 CMR 5404.1
CONCRETE-----------------------------------------------------
---------------------------------------
CONCRETEMASONRY------------------------------------------------------------------------------------
2,2 ANCHORAGE TO FOUNDATI0W
5/S" ANCHOR 5OLT5 [MBEDDED OR 5/8 PROPRIETARY MECHANICAL ANCHORS AS AN ALTERNATIVE IN CONCRETE ONLY
BOLT SPACING -GENERAL _ _ - - - - - - - -
"------------- (TABLE 4)-------------------------------------- 2_ IN. �-
SOLI SPACING FROM END/JOINT OF PLATE --------- (FIG 5)----------------------------------��� IN. < roll-12"
il
BOLT EMBEDMENT -CONCRETE _ _ _ _ _ _ _ _ _ _ _ _
--------- (FIG 5)------------------------------------ _ IN. > -1"
BOLT EMBEDMENT -MASONRY---------------------- (FIG 5)-------------------------------------�- IN. > 15" �-
PLATE WASHER ----------------------------------- (FIG 5)-------------------------------------- > 3"X3"XI/4" V
3,1 FLOORS
FLOOR FRAMING MEMBER SPANS CHECKED------------ (PER `(SO CMR 55.00) ----------------------------------
MAXIMUM FLOOR OPENING DIMENSION ----------------- (FIG ro)---------------------------------------5-- FT < 12' -\/-
FULL HEIGHT WALL STUDS AT FLOOR OPENINGS LESS 2' FROM EXTERIOR WALL (FIG ro)-----------------------------
MAXIMUM FLOOR JOIST SETBACKS
SUPPORTING LOADBEARING WALLS OR SHEARWALL . (FIG i)------------------------------------- 0 FT < d -NZ
MAXIMUM CANTILEVERED FLOOR JOIST
SUPPORTING LOADBEARING WALLS OR SHEARWALL . (FIG 8) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - �- Ft < d _��
FLOOR BRACING AT ENDWALLS----------------------- (FIG 9)------------------------------------------------ -��
FLOOR SHEATHING TYPE------------------------------ (PER -180 CMR 55,00)---------------------------------- -�-
FLOOR SHEATHING THICKNESS------------------------- (PER 180 CMR 55-00)-------------------------- 3/4 IN, V
FLOOR SHEATHING FASTENING _ - - - - - - - - - - - - - - - - - - - - - - (TABLE 2)-d NAILS AT ®(o N EDGE/ 12 IN FIELD _V
4,1 WALLS
WALL HEIGHT
LOADBEARING WALLS----------------------------- (FIGs 10 AND CABLE 5) ________------------__-�- Ft < 10' �-
NON-LOADBEARING WALLS------------------------ (FIG 10 AND TABLE 5)-----------------------$=AFT < 20.1
WALL STUD SPACING --------------------------------- (FIG 10 AND TABLE 5)------------------- 16" IN < 24" O.C. - V
WALL STORY Or ----------------------------- CFIG # 8)----------------------------------- 0 FT < d V
4.2 EXTERIOR WALLS'
WALL STUDS
LOADBEARING WALLS ----------------------------. (TABLE 5)----------------------------
2X_.g? AFT_A_ IN
NON-LOADBEARING WALLS------------------------- (TABLE 5)----------------------------
2Xro --5--FT__4_ IN V
GABLE END WALL BRACINGt
FULL HEIGHT ENDWALL STUDS---------------------- (FIG 10)----------------------------------------------
�-
FT > W/3 V
WSP ATTIC FLOOR LENGTH------------------------- (FIG 11)------------------------------------
_�
�- FT > 0.3W
GYPSUM CEILING LENGTH (IF WSP NOT USED)-------- (FIG 11)-----------------------------------
V
AND 2X4 CONTINUOUS LATERAL BRACE 0 ro FT, O.G. (FIG 11)---------------------------------------------
OR 1X3 CEILING FURRING STRIPS 0 16" SPACING MIN. WITH 2X4 BLOCKING 6 4 FT, SPACING IN END - - - - - - - - - - - V
JOISTOR TRUSS BAYS ----------------------------------------------------------------------------------
DOUBLE TOP PLATE
SPLICE LENGTH --------------------------------- (FIG 13 AND TABLE ro)---------------------------
FT V
SPLICE CONNECTION (NO. OF trod COMMON NAILS) (TABLE ro) - - - - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - a-
LOADBEARING WALL CONNECTIONS
2
LATERAL (NO. OF 16D COMMON NAILS)------------ (TABLE 1)---------------------------------------
NON-LOADBEARING WALL CONNECTIONS
LATERAL (NO, OF 1(od COMMON NAILS)------------ (TABLE 8)---------------------------------------
2 -�-
LOAD BEARING WALL OPENINGS (RECORD LARGEST OPENING BUT CHECK ALL OPENINGS FOR COMPLIANCE TO TABLE S)
HEADER SPANS--------------------------------- (TABLE 3)-----------------------------_°AFT
0 IN. < IV V
SILL PLATE SPANS------------------------------- (TABLE 9)-----------------------------
3 FT 0 IN. < 11' - V
FULL HEIGHT STUDS (NO. OF STUDS)--------------- (TABLE 9)---------------------------------------
-2- - z
NON -LOAD BEARING WALL OPENINGS (RECORD LARGEST OPENING BUT CHECK ALL OPENINGS FOR COMPLIANCE TO TABLE
3,
HEADER SPANS --------------------------------- (TABLE 3)-----------------------------
4 FT _c-IN. < 12'- V
4 FT 0 < 12'--
SILL PLATE SPANS ------------------------------ (TABLE 3)-----------------------------
-IN.
FULL HEIGHT STUDS (NO. OF STUDS)--------------- (TABLE 9)-----------------------------------------
2- �-
EXTERIOR WALL SHEATHING TO RESIST UPLIFT AND SHEAR SIMULTANEOUSLl4
MINIMUM BUILDING DIMENSION, ( W )
NOMINAL HEIGHT OF TALLEST OPENING2_--------------------------------------------------------
< ro 18"
SHEATHING TYPE-------------------------------- (NOTE 4)---------------------------------------
1/2 IN. -�-
IN.
EDGE NAIL SPACING----------------------------- (TABLE 10 OR NOTE 4 IF LESS) -------------------
--
FIELD NAIL SPACING----------------------------- (TABLE 10)-------------------------------------
IN.
SHEAR CONNECTION (NO. OF 16d COMMON NAILS) (TABLE 10)-------------------------------------
V-
PERCENT FULL -HEIGHT SHEATHING.---------------- (TABLE 10)--------------------------------------
�z
5✓o ADDITIONAL SHEATHING FOR WALL WITH OPENING > ro'S" ( DESIGN CONCEPTS) - - -
- - - - - - - - - - - - - - - .- - - - - - - V
MAXIMUM BUILDING DIMENSION, ( L )
o „
NOMINAL HEIGHT OF TALLEST OPENING2_----------------------------------
SHEATHING TYPE=------------------------------- (NOTE 4)----------------------------------------112-
IN, �_
EDGE NAIL SPACING----------------------------- (TABLE 11 OR NOTE 4 IF LESS)--------------------
IN. �-
FIELD NAIL SPACING---------------------------- (TABLE 11)---------------------------------------
IN. �-
SHEAR CONNECTION (NO. OF trod COMMON NAILS) (TABLE 11)---------------------------------------
PERCENT FULL -HEIGHT SHEATHING (TABLE 11)---------------------------------------
% NZ
5% ADDITIONAL SHEATHING FOR WALL WITH OPENING > 6'8" (DESIGN CONCEPTS)_ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ V
WALL CLADDING
RATED FOR WIND SPEED?-------------------------------------------------------------------------------
-�-
5,1 ROOFS
ROOF FRAMING MEMBER SPANS CHECKED? (FOR RAFTERS USE AWC SPAN TOOL, SEE BBRS WEBSITE)
ROOF OVERHANG ----------------------------------- (FIGURE Is) --------------
1.5" FT < SMALLER OF 2' OR L/3 V-
TRUSS OR RAFTER CONNECTIONS AT LOADBEARINGs WALLS
PROPRIETARY CONNECTORS
UPLIFT--------------------------------------- (TABLE 12)-------------------------------------U=303PLF
V
L=1-fro PLF V
LATERAL--------------------------------------------------------------------------
SHEAR--------------------------------------- (TABLE 12)-------------------------------------S=_j]-PLF
V
RIDGE STRAP CONNECTIONS, IF COLLAR TIES NOT USED PER (TABLE 13)--------------------------------
T= 2Z PLF
5" FT < SMALLER OF 2' OR L/2 �-
GABLE RAKE OUTLOOKER - - - - - - - - -------------------- (FIGURE 20)--------------
TRUSS OR RAFTER CONNECTIONS AT NON-LOADBEARING WALLS
PROPRIETARY CONNECTORS
UPLIFT---------------------------------------- (TABLE 14)-------------------------------------
U=41-f LB. Z
LATERAL (NO, OF trod COMMON NAILS)--------- (TABLE 14)-------------------------------------
L=j2k_-B. -�-
ROOF SHEATHING TYPE ------------------------------ (PER -f80 CMR 58.00 AND 53.00)----------------------
ROOF SHEATHING THICKNESS ----------------------------------------------------------------
1/2- IN. > -illro" WSP
ROOF SHEATHING FASTENING-------------------------- (TABLE 2)---------------------------------------------
V
5UI� JOB ADDRESS
NUNES RESIDENCE
32 WOODBINE AVE.
''E''ARMOUTH, MA,
11(o MPH UfRE 2=0" 911f4co
r
SEE PAGE 4 OF 5
SEE PAGE 4 OF 5
MAXIMUM WALL STUD HEIGHT , STUD SPACING ,
RAFTER CONNECTION AND WALL SHEATHING
DESIGN
CUSTOM THREE 5EDROOM
RANCH STYLE HOME.
STUD HEIGHT
NUMBER OF
JOINT DESCRIPTION
COMMON
NUMBER OF
NAIL SPACING
NAILS
BOX NAILS
ROOF FRAMING
BLOCKING TO RAFTERS (TOE -NAILED)
2-Sd
2-lod
EACH END
RIM BOARD TO RAFTER (END -NAILED)
2-16d
3-16d
EACH END
WALL FRAMING
TOP PLATE AT INTERSECTIONS (FACE -NAILED)
4-16d
5-16d
AT JOINTS
STUD TO STUD (FACE -NAILED)
2-lrod
2-16d
24" O.G.
HEADER TO HEADER (FACE -NAILED)
trod
Irod
fro" O.C. ALONG EDGES
FLOOR FRAMING
JOIST TO SILL, TOP PLATE OR GIRDER (TOE -NAILED)
4-8d
4-10d
PER JOIST
BLOCKING TO JOIST (TOE -NAILED)
2-Sd
2-10d
EACH END
BLOCKING TO SILL OR TOP PLATE (TOE -NAILED)
3-irod
4-16d
EACH BLOCK
LEDGER STRIP TO BEAM OR GIRDER (FACE -NAILED)
3-lrod
4-16d
EACH JOIST
JOIST ON LEDGER TO BEAM (TOE -NAILED)
3-Sd
3-lod
PER JOIST
SAND JOIST TO JOIST (END -NAILED)
3-16d
4-lrod
PER JOIST
SAND JOIST TO SILL OR TOP PLATE (TOE -NAILED)
2-lrod
3-Irod
PER JOIST
ROOF SHEATHING
WOOD STRUCTURAL PANELS
RAFTERS OR TRUSSES SPACED UP TO troll O_G_
ad
lad
ro" EDGE / roll FIELD
RAFTERS OR TRUSSES SPACED OVER 16" O,C.
ad
loci
4" EDGE / 4" FIELD
GABLE ENDWALL RAKE OR RAKE TRUSS
ad
lad
roll EDGE / ro" FIELD
WITH NO GABLE OVERHANG
GABLE ENDWALL RAKE OR RAKE TRUSS
8d
lad
ro" EDGE / ro" FIELD
W/STRUCTURAL OUTLOOKERS
GABLE ENDWALL RAKE OR RAKE TRUSS
8d
]ad
4" EDGE / 4" FIELD
W/LOOKOUT BLOCKS
CEILING SHEATHING
GYPSUM WALLBOARD
5d COOLERS
-
-1" EDGE / I& FIELD
WALL SHEATHING
WOOD STRUCTURAL PANELS
STUDS SPACED UP TO 24" O.C,
8d
lad
roll EDGE / 1211 FIELD
1/2" AND 25/32" FIBERBOARD PANELS
ad
-
3" EDGE / ro" FIELD
1/2" GYPSUM WALLBOARD
5d COOLERS
-
-I" EDGE / 10" FIELD
FLOOR SHEATHING
WOOD STRUCTURAL PANELS
1" OR LESS
ad
lad
6" EDGE / 12" FIELD
GREATER THAN 1"
tad
lad
ro" EDGE / 6" FIELD
GENERAL NAILING SCHEDULE
REQUIREMENTS AT EACH END OF HEADER
MINIMUM
NUMBER OF
UPLIFT
LATERAL
HEADER SPAN
HEADER
(FT,)
SIZE
FULL -HEIGHT
(LB.)
(LB.)
STUDS
21
2-2X4
1
211
132
3'
2-2X4
2
41 ro
195
4'
2-2X4
2
554
264
51
2-2X4
3
693
330
ro
2-2X6
3
531
396
11
2-2X&
3
C310
462
a
2-2X12
3
1,100
520
9'
3-2XIO
3
1,241
594
10,
3-2X12
4
1,365
660
1V
4-2X10
4
1,524
126
WALL OPENINGS - HEADERS
IN LOAD5EARING WALLS
----
- _-- -- _ -�-- ...- --
Pi
DOUBLE HEADER -
FULL
II� HEIGHT
III
jh STUD
Ml
#� DOUBLE JACK STUD
II
' WINDOW SILL PLATE`
................. .............
:I
iv
STUDS AND HEADERS
AROUND WALL OPENINGS
DATE REVISION DRAWN 5Y PAGE SCALE
—
w':�;I wwJBNOMEDEslaivae�'c(om14-28-23 # lie1*OF511/4'_-1-0qne
1 2 3 4 5 6 -1 5 5 10 11 12 13 14 15 I6
LU 1 (1) PURCHASE OF DRAWINGS LEAVES PURCHASER RESPONSIBLE FOR COMPLIANCE WITH ALL (2) EXACT SIZE AND REINFORCEMENT OF ALL CONCRETE FOOTINGS (3) ALL FOOTINGS SHALL EXTEND BELOW FROSTLINE VERIFY DEPTH,
LOCAL BUILDING CODES AND ORDINANCES, JB DESIGNS MAY NOT BE HELD RESPONSIBLE MUST BE DETERMINED BY LOCAL SOIL CONDITIONS AND ACCEPTABLE (4) VERIFY STRUCTURAL ELEMENTS FOR DESIGN s SIZE P.O. BOX 285 rW$,J 494-9534
® FOR SITE CONDITIONS OR FOR THE USE OF THESE DRAWINGS DURING: CONSTRUCTION. PRACTICES OF CONSTRUCTION. VERIFY DESIGN WITH LOCAL ENGINEER. WITH LOCAL ENGINEER AND BUILDING OFFICIALS. U/EST BAR?NST.ABLB MA. 02668