Loading...
HomeMy WebLinkAbout162 Springer Ln plan003DEMOLITION NOTES: 1. CONTRACTOR SHALL VISIT THE SITE TO VERIFY AND BE FULLY AWARE OF EXISTING CONDITIONS PRIOR TO START OF WORK. CONTRACTOR SHALL IDENTIFY ALL EXISTING ITEMS OF WORK SCHEDULED TO REMAIN OR SALVAGED FOR REUSES. 2. ALL DEMOLITION WORK SHALL BE PERFORMED IN ACCORDANCE W/ STATE & LOCAL REGULATIONS.. CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED DEMOLITION PERMITS. 3.. COORDINATE ALL DEMOLITION OPERATIONS W/ OWNER FOR SHUTDOWN PERIODS & SEQUENCES OF WORK. ARRANGE W/ OWNER &/OR APPROPRIATE UTILITIES FOR SERVICE SHUTOFFS BEFORE BEGINNING DEMOLITION OPERATIONS. PROVIDE TEMPORARY DUST PARTITIONS, BARRICADES, AND PROTECTIVE ENCLOSURES TO PROPERLY SECURE, ISOLATE, AND WATERPROOF AREAS OF WORK AND EXISTING AREAS AND ELEMENTS TO REMAIN. THE CONTRACTOR SHALL PERFORM THE WORK OF THIS CONTRACT IN A MANNER THAT CAUSES NO DISRUPTION TO THE CONTINUOUS OCCUPATION, WHEN AND WHERE APPLICABLE, OF THE BUILDING & SITE FOR THEIR INTENDED PURPOSE. 4. REMOVE ALL DEMOLISHED MATERIALS IN ACCORDANCE WITH LOCAL REGULATIONS. 5. IT IS NOT THE INTENT TO SHOW EVERY PIECE OR ITEM TO BE REMOVED IN THE DEMOLITION WORK. PLUMBING, ELECTRICAL, AND OTHER WORK RELATED TO A WALL, OR OTHER AREA SCHEDULED FOR DEMOLITION AND REMOVAL, SHALL BE PERFORMED WHETHER NOTED OR NOT. 6. THE EXTENT OF ALL SPECIFIC DEMOLITION WORK SHALL BE COORDINATED W/ THE CONTRACT DOCUMENTS. 7. CONTRACTOR SHALL PATCH/REPAIR/REFINISH, AS REQUIRED, ALL SURFACES EXPOSED BY DEMOLITION WORK WITH MATERIALS & METHODS TO MATCH FINISH AND MAKE FLUSH W/ EXISTING ADJACENT SURFACES. WORK SHALL INCLUDE ALL LABOR & MATERIALS ON ALL SURFACES REQUIRED TO RENDER SUBSTRATES ACCEPTABLE TO RECEIVE NEW FINISHES SPECIFIED IN ACCORDANCE W/ MANUFACTURER'S SPECIFICATIONS. 8. CAP & REMOVE ALL ABANDONED ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE PROTECTION ITEMS BACK TO SOURCE. 9. WHERE EXISTING FINISHES ARE INDICATED TO REMAIN AS BASE MATERIAL SURFACES FOR INSTALLATION OF NEW FINISH, REMOVE ALL PROJECTIONS AND VOIDS AND SECURE OR REMOVE AND REPLACE ANY EXISTING LOOSE OR OTHERWISE UNSUITABLE SUBSTRATE MATERIAL. PROPOSED FIRST REPLACE U g EXISTING BEDROOM EXISTING w BEDROOM BOX NEW WINDOWS OUT W/ 2X10 WALL. HOLD INSIDES FLUSH. ALIGN W/ WINDOWS BELOW. '-€ VI F REPLACE , REPLACE -7" EXIST TO REMAIN EX. BATH SECOND FLOOR PLAN EXIST ' TG REMAIN EX. BATH EX. CLOSET EXISTING BEDROOM BOX NEW WINDOWS OUT W1 2X11C, WALL. HOLD INSIDES FLUSH. ALIGN W/� WINDOWS BELOW. REPLACE J, REPLACE 2'-8" AF TYPICAL NOTES: 1. THE ARCHITECT SHALL NOT BE RESPONSIBLE FOR THE VERIFICATION OF THE CONDITION OF ANY EXISTING STRUCTURE, EQUIPMENT OR APPLIANCE AS PART OF BASIC SERVICES UNLESS IT IS PART OF ARCHITECT'S SCOPE STATED IN THE AGREEMENT AND VERIFICATION IS MADE ONLY BY VISUAL OBSERVATION. IF THE ARCHITECT'S DOCUMENTS REQUIRE CHANGES DUE TO CONDITIONS NOT VISUALLY OBSERVABLE AT THE TIME OF PREPARATION OF THESE DOCUMENTS, THE SERVICES WILL BE ADDITIONAL SERVICES. 2. STRUCTURAL ENGINEER OR ARCHITECT SHALL PERFORM FRAMING INSPECTION WHEN FRAMING IS COMPLETE AND PRIOR TO ENCLOSURE BY INTERIOR WALL PLASTER BOARD/FINISH, 3. CONTRACTOR SHALL SCHEDULE AND PROTECT FROM WEATHER ALL EXISTING HOUSE COMPONENTS AND INTERIORS DURING CONSTRUCTION AND CONSTRUCT TEMPORARY STRUCTURES/ENCLOSURES AS MAY BE NECESSARY TO INSURE SUCH PROTECTION. 4. CONTRACTOR SHALL SITE INSPECT ALL EXISTING VS. PROPOSED CONDITIONS PRIOR TO AND DURING CONSTRUCTION AND NOTIFY ARCHITECT OF ANY DESCREPANCIES AND/OR CHANGES THAT MAY BE ENCOUNTERED. 5. CONTRACTOR SHALL CONSTRUCT AND MAINTAIN TEMPORARY WALLS/ SHORING ETC. TO MAINTAIN/PROTECT EXISTING HOUSE AND STRUCTURAL INTEGRITY OF EXISTING HOUSE. 6. CONTRACTOR SHALL SITE INSPECT/VERIFY ALL EXISTING VS. PROPOSED CONDITIONS PRIOR TO AND DURING CONSTRUCTION AND MAKE ADJUSTMENTS AS NECESSARY, W/ ARCHITECT'S APPROVAL, TO ENSURE COMPLIANCE WITH DESIGN INTENT. 7. DASHED LINES INDICATED EXISTING CONDITIONS TO BE REMOVED/ALTERED. 8. WHERE AN ITEM IS REFERRED TO IN SINGULAR NUMBER IN THE CONTRACT DOCUMENTS, PROVIDE AS MANY SUCH ITEMS AS ARE NECESSARY TO COMPLETE THE WORK. 9. ARCHITECT'S DRAWINGS DEMONSTRATE DESIGN INTENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COMPLETE THE WORK IN A MANNER THAT ACHIEVES DESIGN INTENT. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE PERFORMANCE OF THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SHALL BE EXCLUSIVELY RESPONSIBLE FOR ITS CONSTRUCTION MEANS, METHODS, SEQUENCES, WARRANTIES, AND PROCEDURES, AND FOR CONSTRUCTION SAFETY. achL t 5 architects interior designers builders 299 WHITE'S PATH SOUTH YARMOUTH, MASSACHUSETTS, 02664 tel (508) 362 - 8883 (508) 760 - 2800 tax (508) 760 - 5800 WWW.ERTARCHITECTSCOM RENOVATIONS FOR: LYLE ADREA 162 SPRINGER LANE WET YAR M OSU TH , MA PROJECT # 120222 2022 ERT ARCHITECTS, INC. THE DRAWINGS AND ALL OF THE IDEAS, ARRANGEMENTS, DESIGNS, AND PLANS INDICATED THEREON OR REPRESENTED THEREBY, ARE OWNED BY AND REMAIN THE PROPERTY OF ERT ARCHITECTS, INC. NO PART THEREOF SHALL BE UTILIZED BY ANY PERSON, FIRM, OR CORPORATION FOR ANY PURPOSE, EXCEPT WITH SPECIFIC WRITTEN PERMISSION OF THE FIRM ERT ARCHITECTS, INC. THESE PLANS ARE NOT TO BE USED FOR PERMITTING OR CONSTRUCTION PURPOSES UNLESS STAMPED & SIGNED WITH AN ORIGINAL ARCHITECT'S STAMP AND SIGNATURE & MARKED AS "PERMIT SET' OR "CONSTRUCTION SET'. REGISTRATION Nr_VISIONS DATE: REVISIONS; ISSUED FOR: DATE: D, 9 PROJECT TRUE SCALE: 1 /4'=1''-Q" 0 1 2 4 8 UNLESS OTHERWISE NOTED. SHEET NO. A*1 TOTAL NUMBER OF SHEETS IN SET: 9 THIS SHEET INVALID UNLESS ACCOMPANIED BY A COMPLETE SET OF WORKING DRAWINGS