Loading...
HomeMy WebLinkAboutReview Checklist S,,4/ 7z3. ,,, , ,. 7 '/L-- TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST , ,.___;.) e. . Location: ___ W /A-eA 9. Date of Subdivision Approval Street /C 1 (%Prz- 57 Zone of Contribution: In Out Village // 4 Commercial Residential Owner: %�%l 4��-Ol/7 Installer 22 Builder: Engineer t - N/A YES NO 1. Required number of copies received. ✓ 2. Date of soils exam and percolation test not older than 2 years. ✓ 3. 4 feet of naturally occurring pervious material, above water table(new construction) / I 4. Foundation 2 feet above high point of fronting road for new construction. / 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown - NGVD if near wetlands. / 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. `/ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. . _ 10. Leaching a minimum of 100 feet from wetlands. / 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. ,.% j 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. `/ 15. System not in top or subsoil or 5 foot removal. , 16._Proposed contours are suitable. 17. .Svstem meets slope requirements - min. 1/8", 1/4" preferred. ✓ 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper, gas baffle on outlet tee. ✓/ 20. Sewage flow under 10,000 u,pd for parcel. 21. No garbage disposal. ✓/ 22. System adequately sized for its intended use. J 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. / 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. 1// 27. Septic tank and pump chamber to be Factory waterproofed. �/ 28. Vent provided if leaching below 3 feet or under driveway or parking. y \/ 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 1- 34. Engineer and Land Surveyor stamp and signature. \/ 31 . H2O loading when system subject to vehicular traffic. `/ 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. ✓ 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. C✓ 35. Subdivided prior co April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: it • • 41