Loading...
HomeMy WebLinkAbout31 Grist Mill Ln plan007FRAMING REQUIREMENTS STRUCTURAL: • LALLY COLUMNS INSTALLED TIGHT TO BEAMS & PLATES CONNECTED • POINT LOAD BEARING- SOLID BLOCKED AND CONTINUOUS • BASEMENT BEAM HAS SOLID BEARING AT POCKETS, NO WOOD SHIMS • ALL HURRICANE CLIPS, TIE DOWNS, HANGERS ETC. INSTALLED & NAILED OFF COMPLETELY • ALL JACKS SHALL BE TIGHT TO STRUCTURAL HEADERS, ANY FURRING DOWN OF OPENING SHALL BE BETWEEN JACKS. • JACKS SHALL NOT BEAR ON SILL COMPONENTS, THEY ARE TO RUN CONTINUOUS FROM HEADER TO BOTTOM PLATE CRACKED OR SPLIT STRUCTURAL MEMBERS SHOULD NOT BE USED • LVLS & PSLS IN PLACE PER STRUCTURAL PLANS, TIMBERLOCKED TOGETHER • COLLAR TIES WHERE REQUIRED CONNECTIONS IN GENERAL ARE TIGHT & SECURE • ` JOIST SPACED PER PLAN, BEARING AT ENDS • ROOF SHEATHING BROKEN BACK FROM ROOF RIDGE VENT CLEARANCE SHEATHING TO MEET OVER RIDGE I FOOT FROM GABLE ENDS AND 1 FOOT BACK FROM INTERSECTION OF RIDGE AT CHECK WALLS/OTHER ROOFS. SHEATHING SHOULD MEET IF NO VENT. GENERAL: • BLOCKING - FIRE AS REQUIRED BY CODE - MID SPAN, ALL WALLS OVER 8 FT. - SHOWERS - 2X10 AROUND PERIMETER OF BASE • ROUGH OPENINGS - CHECK FOR CORRECT SIZE, PLUMB AND WIND • MEDICINE CABINETS - IF RECESSED ARE THEY FRAMED? • PLYWOOD BREAKS ON JOIST, STUD, OR RAFTERS (NO BLOCKING) • FLOOR PLYWOOD GLUED AND NAILED & CHECKED FOR SOFT SPOTS & SQUEAKS • ALL WALLS - PLUMB, SQUARE, STRAIGHT AND DIMENSIONALLY CORRECT • CABINET AND VANITY WALLS DOUBLE CHECKED FOR STRAIGHTNESS • STRAPPING NAILED OFF AND STRAIGHT • NAILERS - ALL MISCELLANEOUS NAILERS FOR .SHEET ROCK ARE IN PLACE • PLATFORM TUB DIMENSIONS ARE VERIFIED. CORRECT IF APPLICABLE • STAIRS - FINISH TREAD THICKNESS/ RISE / RUN / WIDTH / HEADROOM / SPECIAL DETAILS VERIFIED • CONFIRM 1/2 WALL STABILITY PROVIDE 2X WIND BLOCKING IN RAFTER BAYS; TYPICAL • SKY LIGHTS PADDED FOR SHEET ROCK IF APPLICABLE • STUDS -TWISTED OR LOOSE (TOE NAILED) REPLACE AS NEEDED • BOTH TOP AND BOTTOM WALL PLATES TO BREAK ON STUD • DUCT CHASES HEADED OFF • JOISTS SPACED FOR PLUMBING - TOILET WASTE NEEDS 3" CLEAR • BATH VALVE WALLS HAVE 16" CLEAR BAY CENTERED FOR VALVE SCUTTLES IN PROPER PLACE • HEADER HEIGHTS AND DROPPED CEILING HEIGHTS ARE VERIFIED CORRECT • INTERIOR PARTITIONS TIGHT TO STRAPPING • INTERIOR BEARING PARTITIONS TOP PLATE TIGHT TO JOISTS • ALL HEADERS, JACK / STUD COMBOS & CORNERS SHALL BE NAILED THROUGH BOTH SIDES • ALL HEADERS TO BE NAILED THROUGH KING STUDS • SILLS TO BE TOE NAILED TO JACKS AS WELL AS NAILED TO CRIPPLES • ALL WALL PLATES SHALL BREAK ON STUD LAYOUT • EXTERIOR WALL BOTTOM PLATES TO BE SEALED TO DECK WITH CONSTRUCTION ADHESIVE • RIGID INSULATION TO BE INSTALLED IN EXTERIOR WALL PARTITION BACKERS & IN HEADERS (2X6 WALL) IN LIEU OF PLYWOOD • FRAME IN VESTIBULE AT BULKHEAD AND INSTALL PLYWOOD ON BULKHEAD SIDE • FRAME IN TILED SHOWER HEADERS WHERE APPLICABLE • INSTALL VERTICAL 1x5 KOMA ON EITHER SIDE OF OVERHEAD GARAGE DOORS AS WELL AS ABOVE TO RECEIVE TRACKS AND OPENER SPRINGS. INCLUDE ALL RELATED BLOCKING EXTERIOR TRIM & MILLWORK: • PAINTED TRIM (IF APPLICABLE) IS BACK PRIMED INCLUDING ALL FRESH CUT EDGES • PVC TRIM JOINTS TO BE GLUED WITH BOND N FILL OR EQUAL • PVC TRIM TO BE FASTENED W/SCREWS OR HEADED NAILS, NO FINISH NAILS OR BRADS • NAILS ARE SET FOR PAINT, FLUSH FOR NATURAL TRIM; NAILS SHALL NOT STAND PROUD OF TRIM • TRIM IS STRAIGHT AND TRUE, JOINTS ARE FLUSH, TRIM IS DAMAGE FREE • SOFFIT VENT NEAT AND CONTINUOUS • HOLD TRIM'/41NCH AWAY FROM ROOF SHINGLES 1 INCH BELOW THE DROP OF FOUNDATION • TOE KICKS AT DOORS ARE SUPPORTING SILLS • FRIEZE BOARDS, BOTTOM OF WINDOW CASINGS AND WINDOW APRONS ARE RABBETED 1/4" DEEP X 1" HIGH FOR SIDEWALL SHINGLES, 2ND TO LAST COURSE TO GO UNDER, LAST COURSE TO BUTT TRIM • FABRICATE RABBETED LIGHT & VENT BLOCKS & TACK IN PLACE FOR FINAL INSTALL BY OTHERS • DOOR LEAD TO HAVE FOLDED - NOT CUT - CORNERS, FOLD LEAD UP, INSTALL TEMPORARY % (STRAPPING) BOARD & TRIM LEAD ALONG TOP OF STRAPPINU'' • INSTALL WINDOWS WITH FLEX WRAP PANS TO BE FOLDED UP AND STAPLED TO INSIDE WINDOW SILL, UNLESS OTHERWISE NOTED • INSTALL WINDOWS AND DOORS PLUMB, LEVEL & SHIMMED TO MANUFACTURER'S SPECS PRIOR TO INSTALLATION OF EXTERIOR TRIM. + CHECK THAT ALL WINDOWS & DOORS OPERATE SMOOTHLY CONFIRM ALL TEMPERED UNITS ARE IN CORRECT LOCATION • ENTRY DOORS OTHER THAN SLIDERS/PATIO, ARE SHIMMED UP'h" FROM SUB, FLOOR • BUILDING PAPER - ALL EXTERIOR TRIM SHALL HAVE TARPAPER BENEATH IT AT ALL SEAMS WHERE IT MEETS SIDING. ALL ICE & WATER, VYCOR, ETC. SHALL BE INSTALLED SO THAT BUILDING PAPER CAN BE SLIPPED UNDER IT SO OVERLAP IS CONTINUOUS FROM THE TOP DOWN. DO NOT LEAVE I&W OR VYCOR STUCK TO THE SHEATHING. •' RETURN AFTER SIDING TO CUT DOWN CORNER BOARDS SITE CONDITIONS: • REMOVE ALL STAGING, TEMPORARY BRACING, CLEATS ETC. • ALL LOW SILL HEIGHT SECOND FLOOR WINDOW OPENINGS SHALL HAVE A 2X4 SAFETY RAIL NAILED OVER THE OPENING UNTIL WINDOW IS SET. • ALL HOLES IN I ST AND 2ND FLOORS SHALL BE COVERED OVER FOR SAFETY; BALCONIES AND STAIRWELLS SHALL HAVE TEMPORARY RAILS. • ALL MATERIAL SHALL BE KEPT IN NEAT PILES AND JOB SITE SHALL BE CLEANED EACH DAY. • ALL LUMBER PILES TO BE COVERED FOR PROTECTION • - IF PROJECT IS A RENOVATION, EXISTING STRUCTURE TO BE WEATHER TIGHT NIGHTLY • ALL TRASH TO BE PUT IN DUMPSTER OR ON -SITE BARRELS. MCPHEE LABOR IS PROVIDED TO EMPTY BARRELS AS NEEDED NOT TO CLEAN UP SITE BEHIND SUBCONTRACTORS. rVIMAZY PATH III PPIAAAPV III II II II'� rj-�_SECOND FLOOR FRAMING PLAN Q ti o= DOMENIC W a DeANGuo STRUCTURAf_ n v No.35D62 rn N �U �a o 6 Q U ¢ z S� O fl C) O � o O� < � p � v x � Q s)- vl- 0 � MMN `C) X V1 u Nk- O p � o S o CV PAt , 2022-07-26