Loading...
HomeMy WebLinkAboutEngineer Plan - 200920 FT. MINIMUM FROM CELLAR OR CRAWL SPACE TOP OF FOUNDATION 10' MINIMUM FROM SLAB ELEV. 3a•0 _ 10 FT. MINIMUM 24" MANHOLE 24" MANHOLE COVER COVER 11 BLOWER OF.A.S.T. ® 4" SCHEDULE 40 PVC PIPE TREATMENT PLANT MIN. PITCH 1/8" PER FT. 3.00 4" CAST IRON PIPE -_ (OR EQUAL) MINIMUM PITCH 1/4" PER FT. FLOW ELEV. R 35_00_ LINE 2 SLAB ELEV. _ _�Q.�Q_ 110" LEVEL 011 MIN. ELEV. = 6" SUMP ELEV. _ _ 34.50 ELEV. - 34_00 ELEV. - 34_35 _mdzDISTRIBUTION ELEV. BOX -_ / (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 1500 GALLON IF MORE THAN ONE OUTLET SEPTIC TANK (TO BE PLACED ON FIRM BASE) 3/4" TO 1 1 /2" CLEAN -� DOUBLE WASHED STONE FREE OF FINES & SILT SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE • 37.2 CLEAN SAND INSPECTION PORT LOAM AND SEED 2" LAYER OF 1/8" TO 1/2" WASHED STONE 37.05 IAA OR FILTER FADRIC VENT 34.80 MIN NOT REQUIRED .34.05 a, 00000000000 ° 0 0 ❑D❑DD❑D❑❑❑D 0 0 0 0 0 ❑DD❑❑D❑❑❑D❑ 0 2'o0 00 O °o°° ❑❑❑D❑❑❑❑❑❑D ° o 31.30 00 o ELEV. 2 500 GALLON GALLEYS WITH STONE IN AN 13' X 25' X 2' TRENCH FORMATION z 19.00 WELL A1W 230 ZONE SOIL ABSORPTION INDEX23.3 ADJUST2-.8 SYSTEM (SAS) USGS PROBABLE WATER TABLE ELEV. _ _1234_ OBSERVED WATER TABLE (9/13/05) ELEV. = - 2.50 _ TEST HOLE 2, LOT 9 BOTTOM OF TEST HOLE ELEV. _ _24 5-- / o 39. ` � 1' 1.7 SAMPLE 4�i. 0 CATCH , `` •\ Q 3 8 SINGULAIR 960DN SAL TREATMENT PLANT 0.4 S) 1 ®4 \ 13.p0 D • / 0 • 39 3 /�J ¢' 00, 38.5 39.8 BOX 39.3 q vrn ' o I •/ / I 0 VENT 0 MANHOLE' SOIL +a TEST --- l 4 6eY 40.7 VAflAW JA68 (NCbJ LEGEND: EXISTING SPOT ELEVATION 00.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 0 .0 FINAL CONTOUR - SOIL TEST LOCATION UTILITY POLE -C>- TOWN WATER - W W- CATCH BASIN®� GAS LINE CLEAN OUT C. CESSPOOL C.P. / 41 0 / LOT 2 17, 030 .t S. F. ' • 40.2 ■ 41.9 PROPOSED D rl i BEDRQO LZ/NG � � SUNK l4 OOM O O SOIL TEST 3 O �" �� ry -J F. A. S. T. 41.1 SOIL_ TREATMENT PLANS p TEST 2 -p -\ RESER VE h BOX L G S � LIMIT OF 5' OVERDIG IL j TES 41.2 l60. 46' • OREAT SRN R�AI> • 42.9 99 Nc ROAD 7 7 ---- (3e)- - (40)T LOT 1 7 7, 041 t S. (44) , --�, 44.7 Ea VWmouth Meats Department APPROVED ate SOIL TEST DATE OF SOIL TEST Jt1NE_3_2009 &_SEPT 17, 2009 SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY A. VON HONE-_____ OBSERVA11014 HOLE 1 ELEV.-_ 41.-0- PERCOLATION RATE __<__g-__ MIN./INCH AT _ 66_- INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-5" 5-9" 0 E ORGANIC MEDIUM SAND NO 10YR7/1 9-40` 8 LO_AMY_'_SAND 10YR6/4 _ ROOTS 40-132" C LOAMY SAND 2.5Y8/4 5X C08BLES NO WATER ENCOUNTERED AT _ 1327 ELEV. = _ 30_0 _ OBSERVATION HOLE 2 ELEV.=_ 41.2 - DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-5" ' 0 ORGANIC NO - - 5-9" E MEDIUM SAND 10YR7/1 9-40" 40-120" 8 C LOAMY SAND LOAMY SAND 10YR6/4 ROOTS 15% COBBLES 2.5Y8/4 1 NO WATER ENCOUNTERED AT _ 120 _ ELEV. = _ 31 2 _ OBSERVATION HOLE 3 ELEV.=__35.0_ DEPTH I HORIZ I TEXTURE COLOR I MOTT. OTHER 0-126" IC LOAMY SAND I INO OF U4 T A. DUMAS y No. 619 FG 7 S S'�NI N NO WATER ENCOUNTERED AT _ 126"_ ELEV. = _ 24.5 DESIGN CALCULATIONS NUMBER OF BEDROOMS 3 GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW - ( 110 GAL./13R./DAY X iBR.) _ _ GAL./DAY REQUIRED SEPTIC TANK CAPACITY _1-465- GAL. ACTUAL SIZE OF SEPTIC TANK 15W GAL. SOIL CLASSIFICATION DES+GN PERCOLATION RATE S_'�F__ MIN./IN. EFFLUENT LOADING RATE 0.1.4_ GAL./DAY/S.F. LEACHING AREA 4_77__00 SQ. FT. (13X25)+(38X2X2) LEACHING CAPACITY (AREA X RATE) U2., 0 GAL./DAY 477.00 X 0.74 RESERVE LEACHING CAPACITY ,' .Ja GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, 2. ALL COVERS TO SANITARY UNITS SHALL BE BRUUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO ` OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TC BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE c___ 9. LOT IS SHOWN ON ASSESSORS MAP __1109 _ AS PARCEL __5.2__. 10. THE INSTALLER IS TO GIVE THE ENGINEER A MINIMUM OF 48 HOURS (2 WORKING DAYS) NOTICE FOR THE FINAL INSPECTION (NUMBER BELOW). APPROVED: BOARD OF HEALTH 11. A VARIANCE OF 6.3' IS REQUIRED FOR THE TOP OF FOUNDATION TO BE LESS THAN 2' ABOVE THE HIGH POINT IN ROAD (NON -ACCESS WEST GREAT WESTERN ROAD). DATE s SEP 18 2009 HEALTH DEPT. AGENT LOCUS ? �' z c�F�r p ® Sl 6 PROPOSED SEPTIC DESIGN FOR DUBUN CONSTRUCTION, INC. LOC.LOT 2 - # 17 HAWS WING ROAD, YARMOUTH Sl/EE73AR SANG ROAD G 508- P. 0. BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 ['ATE JU N E 3, 2009 SCALE 1 " = 20' REV. SEPT. 17, 200 J08 N0. 6250-02 LOCATION MAP �REV. LSHEET 1 OF 1 C. S8PROl�6250-00�dwg�6250-OOSAS.DWG 02009 SWEETSER ENGINEERING'