HomeMy WebLinkAbout327 Whites Path plan009NOTES
1. PANEL SCHEDULE PENDING FIELD VERIFICATION.
FINAL PANEL SCHEDULE
LOAD
POLES
AMPSL7
BUS
AMPS
POLES
LOAD
L2
BTS
2
50A
3
2
30A
2
SURGE
6131
2
80A
5
7
6
8
150A
2
6160
GFCI
i
20A
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
REPLACL EXISTING BREAKERS IN POSITIONS 6 AND 8 WITH A NEW 2P 150A BREAKER
INSTALL NEW 1P 20A BREAKER IN POSITION 9
IF 125A BREAKER WILL NOT PROPERLY FIT IN EXISTING PANEL, REPLACE (E) PANEL WITH SQUARE D PANEL 001204OM20ORB (OR APPRCVED EQUAL).
UPGRADE FEEDER WIRES TO MEET AMPACITY IF NEW PANEL IS REQUIRED.
FINAL PANEL DESIGN AND CALCULATIONS FOR WIRE SIZE WERE BASED OFF OF EXISTING DOCUMENTS AND PHOTOS
I FINAL T—MOBILE PANEL DETAIL
%SCALE: NOT TO SCALE
1. ALL NEW CONDUCTORS TO BE INSTALLED SHALL BE COPPER.
ALL CONDUCTORS SHALL BE THHW, THWN, THWN-2, XHHW,
OR XHHW- 2 UNLESS NOTED OTHERWISE.
2. CONTRACTOR IS TO FIELD VERIFY ALL. EXISTING ITEMS SHOWN
ON THE ELECTRICAL ONE -LINE DIAGRAM AND NOTIFY THE
ENGINEER OF ANY DISCREPANCIES.
3- ALL GROUNDING AND BONDING PER THE NEC.
r � UTILITY COMPANY TRANSFORMER
II TRANSFORMER
L��
(E) WIRE AND CONDUIT
r (E) METER ENCLOSURE
L__
(E) WIRE AND CONDUIT
r
200 If— (E) 240V, 2-POLE, NEMA 3R
DISCONNECT. LOCATION OF MAIN
BONDING JUMPER.
L
(E) WIRE AND CONDUIT
1¢3W N MA23R2PPC
•� o INSTALL NEW 20A, 1-POLE
BREAKER IN F PPC OR GFCI
INSTALL NEW 150A, 2-POLE
BREAKER IN PPC
20/1
(3) #1/0 WITH #6 GROUND
150/2 I �IN 1-1/2" CONDUIT
NEW 6160
CABINET
,_ ONE LINE DIAGRAM
L SCALE: NOT TO SCALE
(2) 2- RGS FOR DC CABLES
NEW B160
CABINET
T••Mobile•••
4 SYLVAN WAY
PARSIPPANY, NJ 07054
' vCROWN
CASTLE
12 GHJ. S'1REET, SUM, 5800
WOBURN, MA 01801
B+T GRP
1717 S. BOULDER
SUITE 300
TULSA, OK 74119
PH: (916)587- 63D
www.blprp.com
T-MOBILE SITE NUMBER 4DR1040A
BU #: 881451
WHITE'S PATH
327 WHITE'S PATH
SOUTH YARMOUTH, MA 02664
EXISTING
295.3' SELF-SUPPORT TOWER
ISSUED FOR
REV DATE.
DRWN DFSGRIPnON UES./2
A 7/1/22
MEH PRELIMINARYRF.VIEW; NM
B 7AI/22
MFH PRF miN1ARYREVIFWI MTJ
0
7125/22
IWJ1
CONSTRULTION - ISM
I
.AAA
ji OF
boy' PETER c
SNIT ►
♦ e♦
AiEYF°.4♦
►�/ s/22
B&T ENGINEERING, INC.
IT SO IS A VIOLATION OF LAW FOR ANY PFBN,
LINI-FSS THEY ARE, ACTING UNDER THE DIRRCTION
OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTER T141S DOCUMENT.
SHEET NUMBER:
REVISION:
E-1
0