Loading...
HomeMy WebLinkAbout327 Whites Path plan009NOTES 1. PANEL SCHEDULE PENDING FIELD VERIFICATION. FINAL PANEL SCHEDULE LOAD POLES AMPSL7 BUS AMPS POLES LOAD L2 BTS 2 50A 3 2 30A 2 SURGE 6131 2 80A 5 7 6 8 150A 2 6160 GFCI i 20A 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 REPLACL EXISTING BREAKERS IN POSITIONS 6 AND 8 WITH A NEW 2P 150A BREAKER INSTALL NEW 1P 20A BREAKER IN POSITION 9 IF 125A BREAKER WILL NOT PROPERLY FIT IN EXISTING PANEL, REPLACE (E) PANEL WITH SQUARE D PANEL 001204OM20ORB (OR APPRCVED EQUAL). UPGRADE FEEDER WIRES TO MEET AMPACITY IF NEW PANEL IS REQUIRED. FINAL PANEL DESIGN AND CALCULATIONS FOR WIRE SIZE WERE BASED OFF OF EXISTING DOCUMENTS AND PHOTOS I FINAL T—MOBILE PANEL DETAIL %SCALE: NOT TO SCALE 1. ALL NEW CONDUCTORS TO BE INSTALLED SHALL BE COPPER. ALL CONDUCTORS SHALL BE THHW, THWN, THWN-2, XHHW, OR XHHW- 2 UNLESS NOTED OTHERWISE. 2. CONTRACTOR IS TO FIELD VERIFY ALL. EXISTING ITEMS SHOWN ON THE ELECTRICAL ONE -LINE DIAGRAM AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES. 3- ALL GROUNDING AND BONDING PER THE NEC. r � UTILITY COMPANY TRANSFORMER II TRANSFORMER L�� (E) WIRE AND CONDUIT r (E) METER ENCLOSURE L__ (E) WIRE AND CONDUIT r 200 If— (E) 240V, 2-POLE, NEMA 3R DISCONNECT. LOCATION OF MAIN BONDING JUMPER. L (E) WIRE AND CONDUIT 1¢3W N MA23R2PPC •� o INSTALL NEW 20A, 1-POLE BREAKER IN F PPC OR GFCI INSTALL NEW 150A, 2-POLE BREAKER IN PPC 20/1 (3) #1/0 WITH #6 GROUND 150/2 I �IN 1-1/2" CONDUIT NEW 6160 CABINET ,_ ONE LINE DIAGRAM L SCALE: NOT TO SCALE (2) 2- RGS FOR DC CABLES NEW B160 CABINET T••Mobile••• 4 SYLVAN WAY PARSIPPANY, NJ 07054 ' vCROWN CASTLE 12 GHJ. S'1REET, SUM, 5800 WOBURN, MA 01801 B+T GRP 1717 S. BOULDER SUITE 300 TULSA, OK 74119 PH: (916)587- 63D www.blprp.com T-MOBILE SITE NUMBER 4DR1040A BU #: 881451 WHITE'S PATH 327 WHITE'S PATH SOUTH YARMOUTH, MA 02664 EXISTING 295.3' SELF-SUPPORT TOWER ISSUED FOR REV DATE. DRWN DFSGRIPnON UES./2 A 7/1/22 MEH PRELIMINARYRF.VIEW; NM B 7AI/22 MFH PRF miN1ARYREVIFWI MTJ 0 7125/22 IWJ1 CONSTRULTION - ISM I .AAA ji OF boy' PETER c SNIT ► ♦ e♦ AiEYF°.4♦ ►�/ s/22 B&T ENGINEERING, INC. IT SO IS A VIOLATION OF LAW FOR ANY PFBN, LINI-FSS THEY ARE, ACTING UNDER THE DIRRCTION OF A LICENSED PROFESSIONAL ENGINEER, TO ALTER T141S DOCUMENT. SHEET NUMBER: REVISION: E-1 0