Loading...
HomeMy WebLinkAbout213 Old Main St planFirst Floor New Construction Notes 1. General Note: All new exterior wall framing to be 2"x6" construction. 2. Furnish and install pair of new 2'-6" doors -- style by owner. 3. Furnish and install new barn door and track at 3'-0" opening - style by owner. I 4. Furnish and install new Pella exterior 3'-0" x 6'-8" door with 1'-0" side lights. l 5. Extend existingbulkhead from grade to new first floor height and install new doors. 6. Furnish and install new Pella French doors (double acting) - each door 2'-6" x 6"-8". 7. Furnish and install new fireplace - style and model by owner. 8. Construct new footing and foundation system under new addition. Footings shall be 20" wide x 10" thick at 4'-0" minimum below grade. Foundation wall shall be 8" wide with 5/8" anchor bolts at 36" on center. 9. Furnish and install new Pella French door and fixed panel - each panel 2'-6" x 6'-8". 10. Furnish and install new Pella double hung windows - Model 3741- align with windows above. 11. Furnish and instal new Pella awning windows - Model 2521- align with windows above. 12. New counter and sink by owner. 13. Furnish and install pair of 1'-3" closet doors on pantry - style by owner. 14. Furnish and install new 3'-0" x 6'-8" door. 15. Furnish and install pair of 3'-0" x 6'-8" doors. LL r EA •-� fJ 4 i SOOTH FA Q - �-J r � g. 10 t f , a i F s e � i t , \ i _. -T_ Xj T 40T FAC^IX Su11 1livan / Pedersen Addition J 11 Renovation 213 Old Main Street Bass River, Massachusetts 1 st Floor New Construction December 14, 2022 Scale: Y4" =1'-0" Second Floor Demolition / New Construction 1. Genera Note: All new exterior wall framing to be 2"x6" construction. 2. Center new window below the window in the attic — see south elevation. 3. Remove and dispose of window in existing facade — frame and close opening. 4. Remove and dispose of existing door and framing for new corridor. 5. Remove existing framing on the east wall of the bathroom and re -frame wall with 211x6" studs to a height of 8° 0" for new dormer. 6. Remove ceiling joists and rafters above bathroom and re -frame new dormer. 7. Furnish and install new pair of 2'-6" doors — style by owner. 8. Furnish and install new 3-0" door-- style by owner. 9. Furnish and install new 3-0" door and center in opening — style by owner. $ Sullivan i Pedersen Addition i Renovation 213 Old Main Street Bass River, Massachusetts 2nd Floor Demolition New Construction December 14, 2022 I Scale: 1/4" = V-0" k South Elevation New Construction Notes 1. Construct new footing and foundation system under new addition. Footings shall be 20" wide x 10" thick at 4'-0" minimum below grade. Foundation wall shall be 8" wide with 5/8" anchor bolts at 36" on center. 2. Furnish and install new Pella double hung windows — Model 3759. 3, Furnish and install new Pella double hung windows — Model 3741. 4. Furnish and install new Pella French doors (double acting) — each door 2'-6, x 6'-8 5. Furnish and install new Pella exterior 3'-0" x 6'-8" door with V-O" side lights. 6. Furnish and install new siding to match existing. 7. Furnish and install new architectural grade asphalt roof shingles — color by owner. 8. Center this window below the existing window in the attic. 9. Extend exterior wall in the existing bathroom to 8'-0" to create new dormer roof line. J— T Sullivan / Pedersen Addition I Renovation; 213 Old Main Street Bass River, Massachusetts 'South Elevation December 14, 2022 Scale: '/4" = V-0" East Elevation New Construction Notes 1. Construct new footing and foundation system under new addition. Footings shall be 20" wide x 10" thick at 4'-0" minimum below grade. Foundation wail shall be 8" wide with 50 anchor bolts at 36" on center. 2. Furnish and install new Pella awning windows — Model 2521. 3. Furnish and install new siding to match existing. 4. Furnish and install new architectural grade asphalt roof shingles — color by owner. T Sullivan / Pedersen Addition / Renovation 213 old Main Street Bass River, Massachusetts East Elevation December 14, 2022 Scale: Ala" =1'-0" ---- � I - it 4/10/23, 7:22 PM SECOND FLOOR R► NOVATION AND ADDITION I . r Al a 3Y s EXISTING BATHROOM IL t at r. n x M 0 BEDROOM V NEW BEDROOM 0 0 https://mail.google.com/mail/u/0/#inbox/WhctKKXwsnBgZphngJrKdffbvfGwgmpBMSmpLfRthJgklWMGKmtZVQwbrSVkFghJhhxxwNB?projector=1 &messagePartld=0.1 ■ � ' | (�� ��` ° |�^. �� \�y Sullivan / Pedersen Addition Renovation 213 Old Main Street Bass River, Massachusetts 1 st Floor New Construction REVIEWED FbR FUIi DING � ANCE. ERRORS OR OMMISSIQ�!S DO,iVOT RELIEVE THE APPLICANT FROM THE RESrOtINS! . � Nj COMPLIAN,� a TY OF'AS BUILT' rJ s 2 ,i W LE ' 'L. 3 Sullivan l Pedersen Addition 1 Renovation 213 old Main Street Bass River, Massachusetts North Elevation December 14, 2022 Scale. 'i4" =1'-0" East Elevation New Construction 'Notes 1. Construct new footing and foundation system under new addition per Structural drawings. 2. Furnish and install new Pella awning windows — Model 3026. 3. Furnish and install new Pella awning window -- Model 3020. 4. Furnish and install new siding to match existing. 5. Furnish and install new architectural grade asphalt roof shingles — color by owner. Sullivan f Pedersen Addition I Renovation 213 old Main Street Bass River, Massachusetts East Elevation December 14, 2022 Scale; '/4" = V-0" South Elevation New Construction Notes , 1. Construct new footing and foundation system under new addition per structural 1 drawings. 2. Furnish and install new Pella double hung windows — Model 3050 3. Verify dormer pitch in field. 4. Furnish and install new Pella French doors (double acting) — each door 2'-6" x 6'-8" 5. Furnish and install new Pella exterior 3'-0'° x 6'-8" door with 1'-0fl side lights. 6. Furnish and install new siding to match existing. 7. Furnish and install new architectural grade asphalt roof shingles = color by owner. 8. Demo existing window in the attic frame opening. 9. Extend exterior wail in the existing bathroom to 8'-0" to create new dormer roof line. i V P s 7 t k ij € 11 y Ok r t � Sullivan ! Pedersen Additioi 213 Old Main Street Bass F - South Elevation December 14, 2022 Scale: '14" =1'-0" :V t-t1 _. �. -jp'w® ap•.s w i+*- $� L t �'b"T Maas m eLP bf'd i P `°^`. "^' Sullivan 1 Pedersen Addition i Renovation 213 Old Main Street Bass River, Massachusetts I West Elevation December 14, 2022 Scale: %" = V-0" Floor Demolition Notes Make safe electrical prior to demolition. !. Demolish and dispose of door and frame. i. Remove and dispose of sheetrock on entry side of the garage wall. Remove and dispose of window. i. Remove and dispose of wall for new T-0" door from existing bathroom to new addition. i. Remove and dispose of wall for access to pantry in new apartment. P. Demolish anddispose of all dotted wall sections. Repair ceilings as required in fc re -use. 1. Remove and dispose of existing roof section over entry and a portion of the livinc room. Brace remaining walls as required until new framing and roof are installed. Sullivan / Pedersen A 213 old Main street First Floor Demolitior December 14, 2022 Scale, Y4" _ V ' 0" First Floor New Construction Notes 1. General Note: All new exterior wall framing to be 2"x6" construction. 2. Furnish and install pair of new 2'-0" x 6'-8" doors -- style by owner. 3. Furnish and install new barn door and track at 3'-0" opening - style by owner. 4. Furnish and install new Pella exterior 3'-0" x 6'-8" door with 1'-0" side lights. 5. Extend existing bulkhead from grade to new deck height / install trap door in deck. 6. Furnish and install new Pella French doors (double acting) - each door 2'-6" x 6-8". 7. Furnish and install new fireplace - style and model by owner. 8. Construct new footing and foundation system under new addition. Footings shall be 20" wide x 10" thick at 4'-0" minimum below grade. Foundation wall shall be 8" wide with 5/8" anchor bolts at 36" on center, 9. Furnish and install new Pella French door and fixed panel - each panel 3'-0" x 6-8". 10. Furnish and install new Pella double hung windows - Model 3040 - align with windows above. 11. Furnish and install new Pella awning windows - Model 3020 - align with windows I above. 12. New counter and sink by owner. 13. Furnish and install pair of 1'-T closet doors on pantry - style by owner. 14. Furnish and install new 3'-0" x 6'-8" door. 15. Furnish and install pair of 3'-0" x 6'-8" doors. Sullivan / Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts 1 st Floor New Construction December 14, 2022 Scale, W -1'-0" ,ond Floor Demolition / New Construction 1. Genera Note: All new exterior wall framing to be 2"x6" construction. 2. Center new window below the window in the attic - see south elevation. 3. Remove and dispose of window in existing fagade - frame and close opening. 4. Remove and dispose of existing door and framing for new corridor. 5. Remove existing framing on the east wail of the bathroom and re -frame wall with 2"x6" studs to a height of 3'-0" for new dormer. 6. Remove ceiling joists and rafters above bathroom and re -frame new dormer. T Furnish and install new pair of 2'-6" doors - style by owner. 8. Furnish and install new 3'4' door — style by owner. 9. Furnish and install new 3'-0" door and center in opening — style by owner. RE l Sullivan / Pedersen Addition 1 Renovation 213 Old Main Street Bass River, Massachusetts E 2nd Floor Demolition I New Construction December 14, 2022 Scale: Y4" = V-0" fi h-'rc-h I Sullivan l Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts Building Sections December 14, 2022 Scale: Y4" = V-0" INSTALL RISERS * COVERS TO PIPES TO BE LAID LEVEL FOR V§ ,� r LAYER. OF DOUBLE WASHED PEA5TONE VARIANCE REQUESTED. 310 CMR 15.221(7) TO ALLOW I WITHIN � Of FINISH GRADE 2 OUT C3l� DISTRIBUTION BOX ,� (SEE PLAN VIEW FOR LOCATIONS) OVER 3/4" - I V2" DOUBLE WASHED STONE 5A5 TO BE 42 BELOW GRADE W'HER>= 3G 15 THE MAXIMUM ALL AROUND ALLOWED ui ku nz � k" EL. 100.7* b David EL. 100.7 »a a c _ T.0.1~ . @'p LOCUS EL. 101 .4 A A SCH �T 4" 5CH 40 PVC p �+ �^ + {{� p� TOP @ EL. 97.2 m `,/�J In, 1R(3) 500 GAL. PRECAST DRYWELL5 (H-�20) 98.4 97.597.00 130TTOM @ EL. 94.70 � IN OUTLET TEE � 97.25 9G.70 � {� .i is�<. INSTALL GA5 BAFFLE 7.17 tf� e, l Kil t „z, . r: 1KtKY i i;Y?. �.] ... ., ii. i ] ,S ✓,=i. ] ! i ,.i]i.•:Y DB--G (H-20) ZONING DISTRICT: R5-40 IN5TALLTANK * D-BOX 5' MINIMUM FRONT SETBACK. 30' ON 6" LAYER Of CR15HED MINIMUM SIDE SETBACK: 20' 1 500 GALLON PUCA5T 5TONE MINIMUM REAR SETBACK: 20' TANK MAXIMUM LOT COVERAGE: 25% BOTTOM TH @ EL. 89.7 PROPOSED LOT COVERAGE: TOTAL AREA: 3824 S.F. 5 PTI`C 5 '5TEM PROMLE 3524 5.F.1323€5.7 S.F. = 1 1 .8%Q '- A� r' .' TBM = EL. 101 ,0 CORNER Of STOOP r � r EXISTING I OOA (" I DWELLING EX15TING T.O.F. @ EL.101.4 CLEANOUT ��s q ICO.7 i 100 ILE r 00,7 100 99 DE51GN DATA DAILY FLOW. (4) BDR..M5 x 110 GPD/BDRM = 440 GPD SEPTIC TANK: 440 GPD x 200% = 880 GPD USE: 1500 GALLON PRECAST SEPTIC TANK DISTRIBUTION BOX: DB-G - (6) OUTLET FIST. BOX (H-20) 501L A55ORPTION SYSTEM: USE: (3) 500 GALLON PRECAST DRYWELL5 LINED w14' Of DOUBLE WASHED STONE ALL. AROUND CAPACITY: BOTTOM 13' x 33.5' x 0.74 = 3223 GF1 51DEW'ALL: 93' x 2' x 0.74 = 137.E GPD TOTAL: 459.9 GPD 0Tj, STEVEN W, RUMBA W "35791 CHEEP 0[35ERVATION HOLE LOG5 DATE: 05-20-2003 TEST BY: D. MASON, RS * C5E WITNE55: A, VON HONE, HEALTH AGENT PERC RATE: c 2 IN. / INCH DEEP OBSERVATION HOLE # I EL, 101 2 DEPTH 5C'rlt. 501E 501E COLOR 501E FROM HORIZON TEXTURE (MUN5ELL) MOTTLING OTHER 010 -• 9'i A 5ANDY LOAM I OYR5%2 9" - 350 Bw LOAMY SAND I OYRGIG 351- 138, C FINE -MEDIUM SAND I OYRG14 NO GROUNDWATER ENCOUNTERED GENERAL NOTE5 I , SEPTIC SYSTEM 15 TO BE INSTALLED IN ACCORDANCE WITH 310 CMR 15,00: TITLE V 2. THIS SEPTIC 5Y5TEM 15 NOT DESIGNED FOR THE USE OF A GARBAGE D15PO5AL. 3. TH15 PLAN 15 NOT TO 13F USED FOR PROPERTY LINE DETERMINATION 4. CONTRACTOR SHALL PROVIDE 46 HOUR NOTICE TO DE51GN ENGINEER FOR ANY REQUIRED INSPECTIONS 5. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ANY UTILITY, ABOVE OR UNDERGROUND, PRIOR. TO ANY EXCAVATION CAR CONSTRUCTION SEPTIC DE51GN BY: MEYER #- 5ON5, INC. Trav�r3e PC '� � '^' ��''za�-. F�.i� _s,..... _`.� -. � �' .�.��s,',"r�ti��'titia..:v,. �" . - � S.tl .:.: ,.. A``k a+_.-:m �F��.,,"�,Aa.ntaEes„_v�L.��s,...�..!vL:.�'�a�'�.i��._ 4!e._._`t.av"'k�" �va3..... - 5+�.,�t, ... _. ". .�.>�a.4',..'.,>1� •ase::. ssr.�e. *r. �'£5 "Y�?....,�,"_�M"e SUMMARY OF CONSTRUCTION REQUIREMENTS 5TANi?APf? EPAMING CONNECION PEQUIPEMFNT5 FOLLOW PEQUIIEMENf5 OF fA�IE 2 EPOM WECM MANUAL, SLOOP CON5T1IUCTION PEQUIPEMENT5 EIP5T fW0 J015T [3AY5 OF THE SLOOP EP,AMING EPOM EACH GAMS ENP f0 PE 131,OCKFP WITH TJI 13I00KI1\16 OF 2x LUMf3Er, 4-ft ON CEN1�P FOP THE LENGTN OF THE J0I5f, 5HEATHIN6 TO PF NAILEb IN ACCOPI?ANCE WITH fA13LF 2 (8J NAII5, 6" 5PACIN6 Af THE FP6E5 ANn 12" 5PACIN6 IN fNE EIEI19) , EXTEPIOP WALL PEQUIPEMENf5 ALL EXTEPIOP WALL 5TUP5 fO 13E 2x6 Af 16" ON CENTEP, fHE 1900ILF fOP PIATE5 ON THE EXTEPIOP WALL5 fO HAVE A MAXIMUM 5PLICE LENGTH DK 4 EEEf ANT? 5PLICE5 TO r3E NAILEI? WITH 10-16J NAI1,5 IN ACCOPI?ANCE WITH TAPLE 6 IN THE WPCM 110/ � �OOKLEf, POOF EPAMING pEQUIPEMENfS PAETEP CONNECfiON fO THE TOP PLATE PEQUIPE5 51MP50N 1­12,5A HUPPICANE CLIP5 WITH 2X C3LOCKIN6 �ETWEEN J015f 13AY5 f0E NALI 19 fO THE PWTEP ANP fOP PLATE WITH I-IOJ NAIL5 PEP 13AY, IF PIL09IN615 NOT PE51PEb, 51MP50N H-IOA OP H-14A HUWICANE CLIP5 CAN 13E 505TITUTW ANT? I1\15TALLEP ON EVEPY PAETEP WITHOUT 13LOCKIN6, AIL CLIP5 fO PE IN5TALL IN ACCOPbANCE WITH 51MP50H PEQUIPEMENf5, COLLAP TIE5 APE PEQUIMP IN THE UPPED THIFP OF fNE POOP PAETEP5 AW APE fO PF NAILEb WITH (5) IOJ NAIL5 PEP 51PP OF U5E 51MP50N L5fA 18 5TPAP5 EPOM PAETEP fO PMFTEP OVEP THE 0126E C3OMV POOF 5HEATHIN6 fO M NAILEI? U511\16 8J OP WUIVALENf NAII5 6" ON CENTEP Af THE Eb6E5, 6" ON CENTER IN THE EIELP. THE FIP5T TWO �AY5 i3 TWEEN PAETEP5 APE PEQUIPEI? fO PF 13LOCKEI? 4 FEET ON CENTER Af ALI 6AI3IE EN1?5 PEP THE WFCM, LIMIfAfION5 AN? CONTFACfOP PE51`01\1501IIfIE5 THE CONTPACfOP MU5f PEEEP fO THE fAr31LE5 ANP 1`16WF5 WITHIN THE WFCM 110 MPH EXP05UPE I3 �OOKIEf POP ILLU5TPAfION5 ANb PEQUIPEMENf5 P15CU55FP WITHIN 1-115 5UMMAPY, ALL COHNECTION5 ANP NAILING MU5f MEET THE PWUIPEWNT5 HEREIN ANP A5 LLU57,AfE19 IN THE 1300KIET IN OP1?EP fO �E IN COMPLIANE WITH THE PUILPING COPF. fNE CONVACfOP 15 PE5PON516LE fO ENSURE ALL CONNECTION5, NAILING, ANP ANCHOP 130If5 APE V151PLP TO THE IN5PECfOP Af fHE TIME OF THE EPAMING IN5PPCfION/ POUN19ATION I1\15PECTION, fNE CONTP.ACfOP MU5f PEEEPENCE THE 51MP50N 5TPON6 fIE C-2014 CATALOG FOP, ALL 5TPAP, HANGAR, ANP flE IN5TALLATION PEQUIPEWNTS ANP LIMITAfION5, TH15 POCUMENf AN[? THE AffACHMENf5 A5 WELL A5 A COPY OF THE WECM POOKLPf MU5f ACCOMPANY ALL 5ET5 OF PLAN5 50MifTEP TO THE C UILPING bEPAPfWNf ANT? 155UEt? TO THE CONTPACfOP/ 5UC3CONTPACfOP5 UNE55 THE PLAN5 APE UPI?ATEP WITH NOTE5 ANT? 12Ef&5 THAT PEELECf fNE PEQUIITMENf5 5TATE1? IN THIS I2OCUWNf ANI2 AffACHWNT5, SUllo, 001�IVAN APP 1000-00 0N 213 ore MAIN sr. 13A55 F,,,IV�P,,,j MA AWC Guide to Wood Construction in High Wind Areas: 110 mph Wind Massachusetts Checklist for Compliance (780 CMR 5301.2.1.1) Zone I,I SCOPE LOAI PB VING WAIL COftCTION5 WIMP 5ftp (3-5EE 6U5T) I10 MPH X LATNPAL ( # 16d COMMON NAIL5) 2 X WINI? EXP05UPF CAI�GOPY B X NON-ILOAPPB AP.I% WAIL CONNECTIONS LATEPAL ( # 16J COMMON NAII5) 2 X 1,2 APPILICAPILITY LOAD REAPING WALL OPENIN65 NUMP3 P OF 5TOPIE5 2 5TOPE5 <_ 2 5TOPIE5 X HEAV7 P SPANS 14 ft 0 in, <_ II-f X POOP PITCH Od2 512:12 X 5111 PILATE 5PAN5 14 ft 0 in, :511-f X MEAN POOF HNIGNT 22 ft <_ 33' X PULL HEIGHT 5TUP5 5 OK BUILPING WIDTH, W 115 R 5 80' X NON-ILOV REAPING WALL OPENINGS PULPING LENGTH, IL 26 ft <_ 80' X HEAPFP 5PAN5 6 R 0 in, :512-ft X PULPING ASPFCf RATIO (IL/ W) I.5 <_ 5:1 X 51LL PILATF 5PAN5 6 ft 0 in 512-ft X NOMINAL HEIGHT OF TALILE5T OPENING 6' 8" <_ 6'8" X PULL HEIGHT" 5TUP5 (NO, OF 5TUP5) X EXT�PIOP WALL 5HNATHIN6 TO PE515T UPLIFT ANP 5HEAP 51MUILTANNOU51LY 13 FPAMING CONNECTIONS MINIMUM PULPING PIMEN51ON (W) GNMEPAL COMPLIANCE WITH FPAMING CONNECTION5 X HEIGHT" OF TALLEST OPENING 6'8" <- 6'8" X 5HEATHIN6 TYPE W5P X 2.1 FOUNI?ATION EZAF NAIL 5PACIN6 X FOUNPA11ON WL5 MEET PW, OF 980 CMF 540� J - CONCPNTN X FIEILC MAII SPACING 12 in, X 5HEAP CONNECTION C # 16d/ R) Ih X 22 ANCHOPAGN TO FOUNPATIONI,3 PEPCNNT FULL -HEIGHT 5EATHIN6 42 7 OK 5/ 8" ANCHOP BOLT5 IMltPP? P OP 5/ 8" PPOPPIETAPY -57 FOP OPENIN65 > 68" X MECHANICAL ANCHOPS A5 AN ALTEPNATIVE IN CONCPETE ONLY MAXIMUM PULPING PIMEN51ON (L) HN16K OF TALLN5f OPENING 608" < 6'8" X BOILT 5PACIN6 - GFNEPAL 38 in, o,c X SHEATHING TYPE W510 X BOLT 5PACING FPOM SNP/ JOINT OF PLATE 9 in, 5 6" - 12" X E126E NAIL 5PACIN6 6 in X BOILT EMBNIMENf - CONCPNTN 7 n, >- T" X FELL? NAIL 5PACIN6 12 in, X PLATE WA5HEP C FIG 5) > �" X 3" X %" X 5HFAP CONNECTION C # 16V ft) X PEPC%TFUILL-HFIGNT5HEATHING 52 X 5,1 FLOOP5 -5% FOP OPENINGS > 08" X FLOOP FPAMING NtMBEP 5PAN5 CHEGTP X WALL CIA PING MAXIMUM FLOOP OPENING PftN510N 0 R <_ 12-ft X PATEN FOP WIND 5PFNP? X FULL HEIGHT WALL 5TUP5 AT FLOOD OPENINGS A APA POPTAL WA115 ANP/ OP WIND PF516N 51­IEAPWAL1_5 U51�t7 NO LE55 THAN 2' FPOM EXTEPIOP WALL X MAX FLOOD JO15T 5FTBACK5 5UPPOPYIN6 5 J POOF5 LOAF BNAPING OF, 5HEAP WALL5 N/ A ft 5 d N/A POOF FPAMING WM6EP 5PAN5 CHECKFP? X MAX. CANI1LEVMP J015T5 5UPPOPI1N6 POOF OVEPHANG I ft 5 5MALLEP OF 2-R OP L/ 3 X LOAD BFAJNG OF, 5HNA' WA15 N/ A ft <_ d N/A VU55 OF STEP CONNECTIONS AT LOAF BEARING WALL5 FLOOP BRACING AT NNPWALL5 X PPOPIETAPY CONNNCTOP5 FLOOP SHEATHING TYPE X UPLIFT U- 286 plf X FILOOP SHEATHING THICKNESS 3/ 4 in, X LAtP\AL L- 176 plf X FLOOP 5HEATHIN6 FASTENING SNEAP 5- 71 plf X 8 d NAIL5 AT 6 in, FbGE / 12 in, FIEILP X PV6E 5TpW5 CIF COLLAF TT5 NOT 1_I5FP) f- 211 plf X GABILE PAKN OUTLOOKEP I R S 5MALLEP OF 2-R OP L/ Z X 4,1 WALL5 TP155 OP PAMI? CONNNC110N5 AT NON-LOAPP1 Akl% WA15 WALL HEIGHT PPOPPINTAJ?Y CONN1___CTOP5 LOAr73NAP1N6 WALL5 8 R 510' X UPLIFT N/A NON-ILOAPPFAPING WALIL5 8 ft <_ 20" X LATNPAL( # 16J COMMON NAIL5) N/A WALL 5TUP 5PACIN6 16 in, <_ 24" o,c X ROOF 5HEAITNIN6 TYPN W5P X WALL 5f0PY OFF5Nf5 N/ A R <_ d _N/A POOF 5NNATHIN6 THICKNESS 7116 in, >_ 1/ 16" W5P X ROOF 5HFATHIN6 FA5TENIN6 8d 616 X 41 EXTEPIOP WALL5� NOTN5; WOOF 5TUb5 1, THIS CHECKL15f SHALL BE MNf IN If5 ENTIRETY TO COMPLY WITH THE PFOUIPEMENf5 OF LOAPItAPING WALL5 2 x 6 - 7 ft 9 in, -7-R X 780 CMP 5301,2JJ ITEM 1, IF THE CNECKILI5T 15 MET IN If5 FMT1PFT Y THEN THE FOLLOWING NON-BEAPING WALL5 2, T - 9 m, X META. 5T IPA'5 ANP HOILP POWN5 APf_ NOT FWUIFFP PEP THE WFCM I10 MPH 6UIP7 : GABILE NN17 WALL BPACING a. STEEL STRAPS PNP FIGUPN 5 FULL HEIGHT NNPWALIL 5TUI25 X b, 20 GAGE 5TP.AT5 PEP FIGUPN I I 6YP5UM CNILING LNNGfN 100 % >_ 0,9W X C. UPUFf 5TP.AP5 PNP FIGUPE 14 l X 3 CEILING FUPPING STRIPS @ 16" 5PACIN6 WITH 2 X 4 d, ALL 51W5 PEP FUUP� IV BLOCKING @ 4 ft; 5PACING IN NNP J015T/ TPU55 PAYS X e, COPNEP 5TUP HOLD POWN5 PEP FIGUIT 18A ANP FIGUP� 18113 POUBLN TOP PLATE 2, fHE BOTTOM 51LL PLAIN IN EXSFIOP WALL5 5HALI BE A MINIMUM 2 IN, NOMINAL SPLICE LENGTH -4 ft X THICKNESS PIT55UQ5 TPNATEP #2-6PA?E, 5PILICE CONNECTION (# 16P COMMON NAIL5) 10 X 3, SEE CHECKL15f 5HEAPWALL CON5TPUCTION PNTAL FOP 5HFAPWA1 CON5T1PUCTION THIS REVIEW WAS COMPLETED ON PLANS SUBMITTED BY JOtIN OAPP AND WAS BASED ON THE FLOOR PLANS AND ELEVATIONS PROVIDED. ANY CHANGES TO THESE PLANS OR FIELD CHANGES MADE MAY RENDER THE REQUIREMENTS OUTLINED IN THIS DOCUMENT NULL AND VOID AND COULD RESULT IN NON-COMPLIANCE WITH THE REQUIREMENTS OF THE WIND DESIGN. SHEARWALL PANEL NAILING SCHEDULE 6 %2" PLYWOOD NAIILEP WITH 8d COMMON OF, GALVANIZE) 60X NAIL5 Af 2 6"O C AT THN E196E5 ANP 12'' O,C, IN THE FIELP. F12 %32 PILYWOOP NALFP WITH 8d COMMON OF, GALVANIZEP BOX NAII5 Af q'O C, Af THE R26F5 ANP 12'' O,C, IN THE FINLI2, [7i%32" PLYWOOP MAILFP WITH 8d COMMON OF, GALVANIZEP BOX NAIL5 AT 12 3`O,C, AT THE EP6E5 ANP 12': O,C, IN THE FIFLP, NOTE : FOP PILYWOOP 5HFAP WALL5 L151tP ABOVE, 8d COMMON OF 6ALVANIZE19 BOX NAIL5 - C 0,131 x 2/2") , GUN NAIL5 MATCHING THE NAIL PIAWTEP ANP LENGTH MAY BE U5FI) A5 A 5UB5TI1UTF NOTE : ALL PILYWOOP TO BE PUN VEPT1CAL FPOM SILL PLATE TO AT LFA5T 2" INTO fNN 5ECONP FLOOD BOX ON TWO 5fOPY BULPIN65 OP TO THN 19OUBILF TOP PLATE IN SINGLE 5fOPY BU1LPIN65, USE 2 POW5 OF NAIL5 5PACEP >" ON C%TFP 5TA66EPE12 AT THE TOP ANP BOTTOM OF EACH PILYWOOP 51-IEEf PEP FIGUPE � IN THE CNECKU5f, SOLE PLATE CONNECTION SCHEDULE CONNECTION TO FLOOR RIM BOARD WALL TYPE SOLE PLATE CONNECTION TO RIM BOARD PI (3) - 16d COMMON NAILS PER 16" 2 17,21 (3) - 16d COMMON NAILS PER 16" 3 (4) - 16d COMMON NAILS PER 16" 12 CONNECTION TO CONCRETE FOUNDATION FOUNDATION SILL PLATE CONNECTION TO CONCRETE J" 1D)IA, ANctioR DOLTS AT 38" O,C. . NOTE: hNGYiOK DOLTS �,n n fNctfo 1tDOVf TO DE ' owif7-,ffP A301 ST fL f NG FOR DOLT WITYt 3" x 3" x' PLfTf Wf 5 -IffS WCih -7" IIINIMUM f17D0ANT INTO CONCPf-rf, SHEARWALL CONSTRUCTION I - ALL 5HEAPWALIL5 TO HAVE POUBILE TOP PILAT F5 AMP POUBLF 2X 5TUP5 AT EACH FNI9 OF THN WALL, 2 - FACE NAIL POU132 TOP PLATES W/ 16d NAI1L5 AT 16'' O,C, 3 - NAILING OF SHEATHING TO BE CONTINUFP ABOVE ANP BEILOW ALL OPENIN65 IN SHEARWALL, 4 - ATTACH POUBILE 2X %P5 ANP BUILT-UP CORNED 5TUP5 AT 5HEAPWAL1L ENP5 WITH (2) 161 NAIL5 AT 6" O,C. FOP Af11C/ 5ECONP FILOOP 5HNA:W&IL5 ANP (2) 16d NAII5 AT � O,C, 5TAG6FFTP FOP FIP5T FILOOP 5HFAFWAL1_5, KING AND JACK STUD REQUIREMENTS X K , X J # OF KING ANP JACK 5TUP5 AT OPENIN65, U5E 2K, IJ IF NOT NOf P OTHERWISE W W r� W � 0 v1 H � U W 0 NO. REVISION/ISSUE DATE PROJECT ADDRESS: 215 01-P MAIN 5T" I C3A55 P\IV�P\, MA McKENZIE ENGINEERING CONSULTANTS structural •civil - environmental P.O. BOX 1879 4 UNDERPASS RD UNIT BREWSTER, MA 02631 (774) 353-2144 JOB#: 23-033 SHEET DATE:03-24-2023 C S 1 .O SCALE: NONE CHECKLIST SHEARWALL CONSTRUCTION 1 FROM TABLE510 ANn 11 WKCM MANUAL 110 MPH EXP B ANP LOCATION OF WA,L 5HSA'MIN6 AN? BUILPIN6 A5PSCT PATIO,1?STEPMINE PSPCENT PULL -HEIGHT 5HSATHI% ANP NAZI, SPACING PSQUIPEMENT5 2, WOOP 5TI UCTUPAL PANSL5 SHALL BE MINIMUM T&I NS55 OF V/ 16" ANII2 IS IN5TALL51? A5 FOLLOWS. a PANELS SHALL IS IN5TAl.LEa WITH 5TP%61'H AXI5 PAP.ALLSL TO 5TUC5, b, ALL HOPIZONTAL JOINT5 SHALL OCCUR OVEP ANP IS NAILEb TO PPAMING, �, ON SINGLE 5TOPY CON5TPUCTON, PANELS SHALL BE ATTACHEP TO BOTTOM PLATES ANn TOP MEMBEP OF VH POUI1,5 TOP PLATS, d, ON -PNO 5TOPY CON5VUCTION, UPPED PANELS 51-1ALL BE ATTACHS19 TO THS TOP MSMI35P OF THS UPPED 200LE TOP PLA1 E ANP TO IANP J015T AT BOTTOM OF PANSI UPPED ATTACHMENT Of LOWW PANEL SHALL BS MAbE TO BANP J015T ANP LOWW ATTACHMENT MAPF TO LOWMT PLATE AT SIP5T SLOOP PPAMING, e HOPIZONTAL NAIL SPACING AT POUILE TOP PLATES, BANP J015T5, ANP QPnSP5 SHALL BS A P00L5 POW OF 5I 5TA666FEb AT 5 INCHES ON CENTSP PSP SI6UPS5 BELOW VEPTICAL ANP HOPIZONTAL NAILING SOP PANEL ATTACHMENT VfPTICAL ANO tlOPIZONT/L NM-ING POP PANEL ATTACNlIENT WtIfN TtllS EDGE Pf57-5 ON 1' : AITNG USE 6d NAILS AT 6"o,c, Q I,I � z VQ -a u z DOUPL-f fD6E PfN�L NAIL SPAGING I z ° O 10 L 0 I I"PAM1NG MfMPfP5 0 EDGE /N7-fPMfD/A7-E ° 3/8" N N ` --- ° o — —° PANEL PANEL DOUOL-f NA11- f06f 5PACIN6 DETAIL STRUCTURAL RIDGE BEAM L5TA 5TPAP @ (PER GSN) FOOK SHEATHING i� I y� PII?GE 30PF\n/ ISAM l0J NAI,5 @ PACH ENP ;I III AILTEPNATE ZZ5 POOE PAPTEP PSP PLAN / ALTERNATE: ATTACH OPP051N6 PAHTEP5 BELOW PIZ7 ISAM OP PIb65 BOAPt7 WITH 2 x 4 COLLAP IF A5 5HOWN, PIPC4S 5iF/V5 NOT PEQUIPSb WHEN U51N6 A COLLAP TIE RAFTER TO TOP PLATE PROFILE VIEW POOS SHEATHING SbGS NAILING \ 2X BLOCKING ISTWS% \ PAF SP5 (NOTCH SOP VENTILATION IS PEQUIP. P ESP To APCHnCTUP. PLANS SOP MOPS INFO,) ' I HZ, A ( INSTALL PPIOP TO BLOCKING ANP PLYWOOb POUBL� 2X TOP PLATE SHEATHING) ALTWNATE H2A BEAM IS 5HOWN ON PLAN) ELEVATION VIEW 4 POOE PAPTEP 2X BLOCKING BETWEEN PEP PLAN PTSP5 ( NOTCH FOP V%IlATION IS ITQUIPSn, E7GE NAILING PEEEP TO APCHISCTUPAS PLAN5 SOP MOLT INFO,) I �I 170UBL5 2X TOP PLATE � 1 HZA (INSTALL PPIOP TO BLOCKING ANP PLYWOOP 5HSATHIN6) ALTSPNATS; H2A 2x STUD SHEARWALL HOLDDOWN SCHEDULE SECOND FL R AND INTERIOR HOLDDOWNS FOUNDATION HOLDDO (1) - C516 COIL 5TP�AP W/ ( 26) 8 151 x 212'' LONG) NAIL5 WITH 5TP. F APPLtP HPU+5I?52 5 W/ 55TB20 ANCHOP BOLT PL IEEOPE POUP ATTACH TO SOUNPATION 171PSCTLY SPAWNG ��� TO 2X MS0W5, PPOVIP P 0E TNS NUMBER OF NAIL5 5PSCISISf? fin// APPLICABLE ANCHOPMATE, U5E e COUPLED NUT PVMW N ANCHOP BOLT ANP 8" AT EACH ENP OF 5TP.AP, CUT SMALL SLOT IN E00\ THING ANP ATTACH 5TP.AP TO LVL THPEAP? P POP INTO HOLPO PC AM OF, LVL 130CKIN6 IN BETWEEN TJI SLOOP J015T5 IN I? SPAMING BELOW CONNECT BLOCKING TO TJI J015T WEI5 WITH HU5 412 SACS MOU NGSP, PPOVII?E 5THP14 EOUNPATI OLPOWN 5TII SOP APA FOF? AI, WALL5, 5SE TT-IOOP SOP BACKED BLOCKING IN TJI J015T WEB PSP MANUSACTUPEP' 5 5PSCISICATIO [4) ApnITION N5TPUCTQN 9STAIL5; ATTACH HOLPOWN5 TO KOUNPA11ON POPMWOPK WI POPPIATE ANCHOPMA1'S5 PPIOP TO HOUR, (2) - C516 COIL 5VAP W/ (26) 8J (OJ3l x 2/2" LONG) NAIL5 WITH 5TW APPL f71PSCTLY TO 2X EFAMl% MSMBSP5, PPOVII?S HALF OF THE NUMBSP OF NAIL5 5PSCIPISb HPUA-5n52,5 ATTACHEP fO 6x6 POUGLA5-SIP P05T W/ 5BiOO ANCHOP BOLT PLACSf7 AT EACH SNP Of 5TPAP, CU1" SMALL SLOT IN SLOOP SHEATHING ANP ATTACH 5TPAP TO L �� BSSOPS POUF, ATTACH TO EOPM WOPK WITH APPLICABLE ANCHOII U51� CNW I" ISAM Op LVL BLOCKING IN IETWSEN TJI SLOOP JOISTS IN SLOOP PPAMING BELO C SP NUT IETWSEN ANCHOP BOLT AN? I" THPSAP7 P P019 INTO HOLPOWN CONNECT BLOCKING TO TJI J015T WSI5 WITH HU5 412 FACE MOUNT HANGS , POVIPF BACKED BLOCKING IN TJI J015T WEB PSP MANUEACTUPEP' 5 5PSCI51 N5, LEGEND p pFpFOt?A SHFApWAKL, CON1INU� t'KYWO � OVE ANP 13FLOW SNMWALL • O SN�AI?WWAKL HOKbbOWN TYPE 1 OpFNING WITH NAILING ACCOr?bING r0 5F CIFI�p .WALK 1�(P�' 1 AIP GFIPLIN� - -E} - 5NPApWALK X K , X J # OF KING ANP JACK 5TU125 AT OPPNIN65 ��A APA PORTAL WALL DETAIL (NOT TO SCALE) (SUBSERVIENT TO APA TT-10OF BY THE ENGINEERED WOOD ASSOCIATION) � PlM1�Of�P DOUII%LE TOP PLftT� PlI 11�OfIPD 5flEA7 KING I=ILLEP PfOUIPED) lTly' 3" X 11-1141, t lfAp]fP OP GIs SPffCIPI ' L5T/IL45�PlIP IJYPIGAL,KF_FFF70 FLANFOR SFEGFG IFADER RFOUIkTMENT�) l / 4, H L 24 5TP 1P (lNSID �/tGE OP (IN-' P/tCE OP W/tLL) PA5TEN TOP PLftTf 7-O f-IfADEP WALL) fP 7 C -- Zx6 C2>-Zx6 rt�flDfP 7-0 C2)-Zx6 W1Tt7 (Z) POWS O� 16d SINKEP N %L5 AT- 3" O,G, P�15T N S,� f7 O 11EADEP W11 h 8d GOMMON OP 0 hN D 4; POP /t PftNL SPUGf r, Nf1/L51N 3" CPID P S Cl- N ED 1», P/tN L 5/ iOWN AND 3" 0, , /ILL PP/IMl E00f5 5h/tLL tl�� Zx6 > P/MlNC� CSTUDS, l�L ING ANO 5/LL5> 1�LOCK,fo, ANo OCCUP I�/iz ' STPUGTUPAL- N TYP, wrnlly ` 24" OP PfN L St1�fTrti,NC� -h516t7T OP WftLL, 171N, Z"x2"x'/6-" PLAT-f W/5hfP BLOC 5!lAL-L Of N/IL D WlT I6d 5770/4 t>OLDOWN 51NKfP5 14 5TrID14 h0LDO' a o 0 0 n o 0 DIA /WG/10P 1�OLT 9 C7" M1N, fllr�ED17ENT> %�� ELEVA7 � MO NT FRAME CONSTRUCTION DETAIL (EXAMPLE ONLY, NOT TO 5SAL-E--') �-/TCtl Pl-AT5 (1) S7-,M- It" W1 CZ) LVL /a"x nj° CONSTPUG N NOTES; i KNIff GUT tl55 AND Wn-D PL-Arf DOT l KNIPf GUT t l'55 AND 1 LD l�tl5� PLftT�S TO V�PTIG/IL 5lD 5, PfDPIG�tTOP TO WELD PL-A7 I OTI t TUi� ST �L P05T5, l'05T5 TO tC� ATTACt ifO TO CONCPfFf PPOV10f ofrfi-1 P/tl�PlGA O POUNOATION W1Ttl (4) --��" Tt�IPEADED PPOV DETAIL POD W!T>V 51MP50N SfT EPDXY WITYt 15" MIN, EMOfDMEN7 . �urcn PLATE u) 5r � "x 11° W1(z) w 3„ /Ig„ Z) COLUMNS TD Pf SPLIT A7- tt)E/M n55 POST ft5 h55 P05T A5 5PEC/r/ED LOCA7-10NS AND 3/4" P[-A7-E5 TO 13E SPDGI> IUD USED TO CONNECT COLUMNS TO E PL-A7 f ft5 SPECIFIED OfAl-1 TO PPOVIof MOMENT CONNECTION, PA-,5E Pt-ATf /15 3> CONTP/tCTOP TD VEPIPY AQ- SP�GlP1�D O/MEN5/OTJ51�PlOP TO CON5TPUCTION, d - - n 4 n ad a .. d a a4 W N 0 F� u 0 E-+ ~ U H W Q � 0 Q Ill CL NO. REVISION/ISSUE DATE PROJECT ADDRESS: Z1 OLn MAIN 5f , �A55 P.IM, MA ENGINEERING CONSULTANTS structural • civil • environmental P.O. BOX 1879 44 UNDERPASS RD UNIT 2 BREWSTER, MA 02631 (774) 3 53 -2 144 JOB#: 23-033 bmtt I DATE:03-24-2023 S1.1 SCALE: NONE First Floor New Construction Notes 1, General Note: All new exterior wail framing to be 2"x6" construction. 2. Furnish and install pair of new 2'-6n doors style by owner. 3. Fumish and install new barn door and track at T-0" opening — style by owner. . Fumish and install new Pella exterior 3'-4" x 6'-8" door with V-0" side lights. 5. Extend existing bulkhead from grade to new tint floor height and install new doors, 6. Furnish and install new Pella French doom (double acting) — each door 2'-6" x V-8 7. Furnish and install new ftreplace -- stye and model by owner. 8. Construct new footing and foundation system under new addition. Footings shall b 20" wide x 10" thick at 4'-C" minimum below grade. Foundation wall shall be 8" wid, with 5/8" anchor bolts at 36" on center. 8. Fumish and install new Pella French door and fixed panel each panel 2'-6" x 6'-c 10. Furnish and install now Pella double hung windows r Model 3741- align with windows above. 11. Furnish and install new Pella awning windows — Model 2521-- align with windows above. 12. New counter and sink by awner. 13. Fumish and instal pair of I' 3$ closet doors on pantry — style by owner. 14. Fumish and instal new X-0" x 6-8" door. 16. Fumish and install pair of T-O" x 6'-8" doors. 6� R� HEADER = (3) 1 3/4" X 7 1/4" LVI-s i HEADERS = (3) 2X8 UNLESS OTHERWISE NOTED i ` 1 POSTS = 4X6 PSL UNLESS OTHERWISE NOTED I CHECKLIST REQUIREMEN YJ Sullivan l Pedersen Addition / Renovation. 213 Old Main Street Bass River, Massachusetts 1 st door New Construction December 14, 2022 Scale '/4 w Second Floor Demolition / New Construction 1. Genera Note: All new exterior wall framing to be 274" construction. 2. Center new window below the window in the attic -- see south elevation, 3. Remove and dispose of window in existing fagade — frame and close opening. 4. Remove and disclose of existing door and framing for new corridor. 5. Remove existing framing on the east wall of the bathroom and re -frame wall with 74" studs to a height of 8'-0" for new dormer. 6. Remove ceiling joists and rafters above bathroom and re -frame new dormer. 7. Furnish and install new pair of 2'-8" doors — style by owner. 8. Fumish and install new T-0" door — style by owner. 9. Fumish and install new T-0" door and center in opening — style by owner. .. i 4 tt ryry ROOF/ATTIC FRAMINING IN BLUE :ADERS = (3) 2X8 UNLESS OTHERWISE NOTED >STS = 4X6 PSL UNLESS OTHERWISE NOTED CHECKLIST REQUIREMENTS IN RED Sullivan / Pedersen Addition / Renovation 213 Old Main Street Bass River, Massachusetts 2nd Floor Demolition / New Construction December 14, 2022 Scale: ' 4" V-0" Sullivan 1 Pedersen Addition l Renovation 213 old Main Street Bass River, Massachusetts; Building Sections December 14, 2022 Scale.'/4 = V-Ofl v _. First Floor Demolition Notes 1. Make safe electrical prior to demolition. 2. Demolish and dispose of door and frame. 3. Remove and dispose of sheetrock on entry side of the garage wall 4. Remove and dispose of window. 5. Remove and dispose of wall for new T-0" door from existing bathroom to new addition. 6. Remove and dispose of wall for access to pantry in new apartment. 7. Demolish and dispose of all dotted wall sections. Repair ceilings as required in for re -use. 8. Remove and dispose of existing roof section over entry and a portion of the living room. Brace remaining walls as required until new framing and roof are installed. 1 1 1 1 1 1, 1 ' 1 i 1 1 1 1 1 1 1 1 NEW FROST FOUNDATION 8" WALLS ON 16" X 8" FOOTINGS Y � q ANCHOR BOLTS = .`$ 1 5/8" DIA W/3X3X1/4 l, ik��� r 1 PLATE WASHERS SPACED 38" O/C ' Y 1 1 1 1 1 1 1 J 1 1 1 1 1 1 1 1 1 1 First Floor New Framing Notes 15. General Note: All new interior framing to be 2"x4" wood framing with sheetrock to match existing wall thickness. 16.3'-0"W x 6'-8"H solid core wood door. Owner to select. j 17. Pair of 2'-O'W x 6'-8"H wood closet doors. Owner to select. 18. Pair of 1'-6"W x 6'-8"H wood closet doors. Owner to select. 19. Pair of 1'-3"W x 6'-8"H wood closet doors. Owner to select. 20. Frame and close existing door opening -- install sheetrock and match adjacent finish surfaces. { 21.3'-0"W x 6'-8"H sliding barn door at new toilet enclosure. 22. Install hydronic under floor radiant heat system throughout bathroom. 23.Owner to coordinate electric outlet locations and lighting locations with contractor. 24. Rework plumbing from crawl space to new plumbing fixture locations and extend a supply, drain and vent to new future floor fixture locations. Patch sheetrock on walls after plumbing connections are made. 25. Install new subfloor over radiant heat system match adjacent floor height. First Floor Finish Notes E. All floor finishes, wall finishes, door hardware, plumbing fixtures and windows to be selected by Owner. F. 4'-6"L x 2'-0"W vanity and top. Owner to select and coordinate materials and finishes with Contractor' G. New toilet with elongated bowl. Owner to select and coordinate with Contractor. H. New 3'-0"W x 4'-6"L glass shower. Owner to select and coordinate with Contractor. Sullivan / Pedersen Bathroom Renovation 213 Old Main Street Bass River, Massachusetts New Construction Plan July 28, 2022 Scale. '/4" =1'-0" I ,�- - TEST H❑EE LOGS NOTES - ASSESSORS MAP c'`? t � PARCEL SEAL EVALUATOR1, VERTICAL DATUM:`) ! t - WITNESS: AM low 140�� - -- pr1�,ll�k FLOOD ZONE: ` VC? J 2. MUNICIPAL WATER AVAILABLE. QV� REFERENCE , , DATE-• 1 ,� Z( ►f 3. SCHEDULE 40 PVC PIP TO BE USEDTHROUGHO T SYST UNLESS PERCOLATION RAT ❑THERWISE NOTED. ` t d Ve rr 4, ALL PRECAST UNITS TO CONFORM WI FH AASHTO: TH-1 TH-2 5. PIPE PITCH - 1/4' PER FOOT UNLESS OTHERWISE NOTED, 6. ALL CONSTRUCTION DETAILS TO BE IN CONFORMANCE WITH MA. ENVIRONMENTAL LOCATION MAP -V6 CODE (TITLE V) AND LOCAL REGULATIONS. tmm 5"19 7. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. � g,�(p �_ t (f�- f ✓ r l b'-� (,� �, �t�tX? f.J 1,.�`� ! `t' ��u-`� Q'� � `3 �;1._1�.� 1,-L-JCG:l� Mika 2 I b 2- tpi ID r ��� ` -� 1 4,u l l�)I �44 PG. IS `{ to t�-itL.1Z�C,C7(� E� u °rtp)> ,� �� a��� 0) "� -tt X -L ttw�kr IOU, c i2 ,,��_E � +'L� {� DT n tt__ (APpr,o + K� SEPT SYSTEM S TEM DESIGN . � �' ��� �U� �20 �1 t � - . a..,.�+.._� ��.c�.,�t'Tr�..�G-tt�t.. ► _. FLOW E; MATE )ROOMS AT GAL/DAY/BEDROOM = GAL/BAY r},�, r �,� 98.76 SEPTIC VK 98 /DAY x 2 DAYS GAL x I Shed 9e:7 98.96 USE GALLON SEPTIC TANK 247:5Q" 98.7gq - t 12 benchmark set - edge ° SOIL AB. PTIOty SYSTEM. '� ��✓I 1 { Z%r'�f....t/,_ ({�.` ';,(/{�/ I 1h.:YJ `fir/,, {���j Left corner bottom x 00.75 r l i - it 1_ (L+ 1 �. step EP-100.99 �'"'� � r • l .1° ` n ?r F 5 30053 100.23 1 ` 00 `i 1G !-J ir1f f » i} �} �Kilr�1 � li`� /\ 1 Z u • '1 ' ` liter / ► 1 11 r � • LJI W� - �.t` -I -bE.LajJ 24C ram. a 100.69 t- IOL03 m l r IDE AREA y, J ► 3 100.07 10401 POoI,f ' %` ~ aam 7TTOM AREA ` t .'% (✓ ! I .+ !V '� �b-r To d x 4Car,' "�'� !A ed) ` b IOQ99 benchmark set 100.95 SEPT SYSTEM SECTIdN Rkdh# earner bulkhead 100.49 100.49 i7X V. 100.50 x 100.73 I00. ShFd 10Q55 00 41 CB/ BASIN f NDrt1[?1EMADE Y l 19 100.68 100.57 101.02 a UPl371/216 CC y-- - - - 101.06 Q 10064 SEPTIC/METAL V 1�.�0------_ -- / 4lMl�, 1 .�. _. O. 100.67 1 b. 14 of r G «ry/NE'Cigp "_'-"`_ - ` .83 .sue t e tJr Paved 101.4e Ed � vLtAYr'� , Drive ' ! /�✓"'L. fh7iL� 00.74 247.50 ^j} �[/►`YtLiL l �� Q --- _ __� ... '`-;$ 1, x 100.88 + K o`-- ,� 10070 1 72 •°t 1' ibWL a . ELEV,, �i ELE V " - -' _ .ma - ?ELEV �1� 1 a' GAL 33D BOX f10.no�---~� 15-i SYL'�lil i " SEPTIC TANK ELEVXytLAP-tlt, t, -T\C . , ANY `E SITE AND SEWAGE PLAN ''v4_ _ �"vt✓' WARNER # a. .. ..* . No 8721 . t LJL LOCATION Y Scale. 1'-30' / 7s G� 1 PREPARED FOR- 0i L4ijE .I�UOV 12 20220'30' 60' 90, SCALE 1 TH DEp1- ' / DAVID B. MASON, R.S. / �iC G r DBC ENVIRONMENTAL DESIGNS DATE: EAST SANDWICH, MA DAT HEALTH AGENT (50$)833-2177