FIELD OBSERVATION REPORT
Attn: Yarmouth Building Official Date: 01.26.23
Field Report No: One (1)
Company:
Address:
Project Name: 74 White Cedar Point(Phipps Residence)
Project Location:
Project Number: NA
Date of observation: 01.24.23 Time: 8:30 am
Weather conditions: Cloudy Temp. range: 30's
Field representative:
Trades on job site: Site Contractor
Est. %of completion:
Item 1 Garage Foundation Pour:
Upon visual inspection of the poured garage foundation wall and specifically the
honey combing at the south wall,the foundation is structurally sound for the
proposed structure.
The wall is 8 inch thick with multiple rows of steel rebar.
l
P1: South wall
.:
•
P2: Garage Foundation
Prepared By: Tom Galligan, PE