Loading...
HomeMy WebLinkAboutFoundation Field Report 12623 Longfellow Design Build LLC 367 Main Street Falmouth, MA 02540 (617)548-1407 tomg@longfellowdb.com FIELD OBSERVATION REPORT Attn: Yarmouth Building Official Date: 01.26.23 Field Report No: One (1) Company: Address: Project Name: 74 White Cedar Point(Phipps Residence) Project Location: Project Number: NA Date of observation: 01.24.23 Time: 8:30 am Weather conditions: Cloudy Temp. range: 30's Field representative: Trades on job site: Site Contractor Est. %of completion: Item 1 Garage Foundation Pour: Upon visual inspection of the poured garage foundation wall and specifically the honey combing at the south wall,the foundation is structurally sound for the proposed structure. The wall is 8 inch thick with multiple rows of steel rebar. l P1: South wall .: • P2: Garage Foundation Prepared By: Tom Galligan, PE �P�j of kmSs40 ti `� TNOMAS G�+ �o GALLiGAN I N f j i�c 391� 1'4° f •P0� ST R �4.. 4