Redevelop the property and demolish all existing buildings (8) on site and construct a gasoline
filling station with four dispensers, overhead steel canopy, two double walled fiberglass fuel
storage tanks and a convenience store, coffee shop, and drive-thru, and construct a separate
building with 4 residential apartments on two floors.
Project will combine three lots, 1272, 1276 & 1282 Route 28, South Yarmouth, which are in the
B2/ R.O.A.D. Zoning Districts. The existing gas station/convenience store, canopy and 5 rental
units will be razed and replaced with a new canopy, and a building containing a drive through
coffee shop (1110 use), convenience store (H2 use) and a gas station (H6 use). The second
building will contain four two -bedroom dwelling units (Al 2 use). The combination of the lots will
create a conforming lot of 49,833 square feet. Building coverage is currently at 12.2%, lot
coverage is 52.6% and 4 curb cuts exist on site.
Building coverage will adjust to 15.9% (from 12.2%), lot coverage will increase to 63.3% (from
52.6%), rear setback will be 47.2 feet (instead of 6.8), front setback will be 10 feet (instead of 3.3),
and one curb cut will be eliminated
Applicant proposes to use the Revitalization Overlay Architectural District (ROAD) Section 411
of the Yarmouth Zoning Bylaw as allowed for mixed use projects in the B-2 zoning district.
Planning Board approval of the R.O.A.D. Application has been secured, and is a necessary
prerequisite to proceeding for a R.O.A.D. Special Permit from the Yarmouth Zoning Board of
Appeals. Relief for this project is listed as follows:
Building front setback, section 203.5
Only 2 in lot trees, section 301.4.6 (we believe that we comply)
Drive through buffer distance to residential zone of 100'. Section 301.8.
Front landscape buffer, section 301.4.4.
Al2, Multifamily Use in the B2 Zoning District, section 202.5 and 411
H6, Gas Station Use in the B2 Zoning District, section 202.5
Signs on front and right -side elevations, section 303.5.5
Development of the project is being proposed under the ROAD bylaw which allows for zoning
flexibility in exchange for a high standard of site and building design. The Yarmouth Planning
Board, which serves as the Design Review Authority for ROAD projects, has determined that
the project substantially adheres to the Yarmouth Architectural and Site Design Standards
(Design Standards), and has recommended that the Project be filed with the Zoning Board of
Appeals.
411.5 Criteria for approval. The Board of Appeals when considering a petition for a Special Permit
for a ROAD District Development Plan shall consider the following criteria, standards, objectives
and recommendations:
1. General Criteria. All proposals shall be reviewed according to the following general criteria.
These criteria are evaluated under the discretion of the Planning Board, and a proposal need not
necessarily satisfy all criteria in order to receive the approval of any of the reviewing boards
or authorities.
A. site plan review objectives pursuant to section 103.3.1;
103.3.1 Objectives. The design of projects requiring submission of a site plan, pursuant to this
section, shall comply with the following:
1. Internal circulation and egress from the site are such that traffic safety is protected and access
via minor streets servicing single-family homes is minimized.
2. Reasonable use is made of building location, grading and vegetation to reduce visibility of
parking areas from public ways.
3. Adequate access to each structure for fire and service equipment is provided. Installation of
Yarmouth Fire Department (YFD) Lockbox(es) shall be required to ensure building and,: site
access.
4. Utilities and drainage serving the site provide functional service to each structure and paved
area in the same manner as required for lots within a subdivision, and fire protection provisions
meeting Fire Department regulations are provided.
5. Drainage serving the site must comply with Section 304 — Stormwater Management.
6. The proposed development will: a) minimize adverse environmental impacts on such features
as wetlands, flood plains, and aquifer recharge areas; b) minimize obstruction of scenic views
from publicly accessible locations; c) preserve unique natural or historical features to be preserved
on the site or within the Town of Yarmouth; d) maximize open space retention; e) avoid major
topographic changes; and f) minimize removal of existing trees within the required buffer zones.
7. In or abutting residential districts, effective use is made of topography, landscaping and
building placement to maintain, to the degree reasonable, the character of the neighborhood.
Site Plan Review (SPR): Most of the comments in the attached June 6, 2023
SPR Comment Sheet are related to other permits or regulatory requirements
that the Applicant needs to adhere to and will be addressed during permitting
for the project. Edits were made to the submitted plans to address design
related SPR comments including adding more in lot trees, removal of one
menu board, the installation of fencing on the eastern and northern
boundaries, the relocation of underground infiltration, lighting over the
pumps, and building design on the residential building.
B. the criteria, standards and objectives of design review pursuant to section 103.3.3.1;
103.4.3 Goals and objectives. The goals of the design review process shall be to revitalize all
commercial uses south of Route 6. by:
1. Improving the aesthetic quality of buildings and sites therein;
2. Promoting attractive and viable commercial districts, and;
3. Providing a process for review of all changes in land use, the appearances of structures, or the
appearances of sites within the districts.
The objectives of the design review process are to:
1. Preserve the natural and cultural patterns of the surrounding landscape whenever possible.
2. Encourage incorporation of public amenities, including, but not limited to, sidewalks, benches,
and bike racks within commercial developments. Encourage clustering of buildings in large
developments to retain more open space.
3. Building is encouraged to be of a style which complements and promotes traditional Cape `Cod
architectural styles and character with proper scale, proportion and roof pitch. Traditional
building materials (clapboards and cedar shingles) are recommended for usage. Colors of
clapboard and trim should be muted colors of traditional usage, not designed to shock or stand
out.
4. Identify the internal parking circulation system in a manner which will reduce curb cuts (4 to
3), improve landscaping and traffic flow, allow for proper turning radius and parking space,
encourage pedestrian uses and access, screen trash receptacles, and minimize any accessory
signage.
C. the goals, Purpose and objectives of this section 411;
The intent of this ROAD is to provide a carefully controlled mechanism that promotes business
opportunities through the use and reuse of business properties while preserving and enhancing
the ambiance of our historic community.
411.2 Objectives. The objectives of this section are:
1. to respect and accomplish the intent and purposes of the Yarmouth Zoning Bylaw underlying
this ROAD District;
2. to encourage the development and redevelopment of sites and buildings within commercial
districts through the incentive of zoning flexibility. If new development is proposed on a' site
where existing building(s) are to remain, then no approval shall be granted unless the existing
building(s) and the entire site are redeveloped and revitalized to meet the criteria of the Yarmouth
Architectural and Site Design Standards;
3. to require, in exchange for said flexibility, submission to design standard review so as to further
encourage variety and choice within commercial and business development, to further encourage
mixed commercial, business and residential uses, to stimulate economic development and, to
further encourage the construction of projects with Historic, Seaside, Village, Colonial, and/or
Old Cape Cod style themes and designs, while preserving and protecting Yarmouth's natural
environment and aesthetic values.
D. the economic benefits of the proposed development;
The project will be an economic benefit to the Town of Yarmouth in many ways. First, there are
currently 2 employees who work at Jay Mart. Once complete, the Project will employ up to 10
employees. Second, the Town of Yarmouth will benefit from the upgraded Septic System to be
installed at the site. Currently there are five septic systems on site, with four systems serving the
residential units and one system for the gasoline filling station with leaching pits. With the
proposed redevelopment, there will be one septic system for the proposed mixed building in
compliance with the current MASSDEP Title V requirements and the current Yarmouth Board of
Health regulations. This system will adequately serve the property until sewers are installed on
Route 28. Finally, there are a total of 5 residential units on the site, of which one is a 2 bedroom
and 4 are one bedroom dwellings, each constructed in approximately 1936, for a total of 6
bedrooms. There will be a total of four new residential units with eight bedrooms in a separate,
self-contained building (two bedrooms in each unit).
In addition, there will be tax revenue benefits from this project. Currently, the owner of the
property at 1272 Route 28 pays annual Real Estate Taxes in the amount of $1,580.00, which is
based on Taxable Value of $187,700.00. The owner of the property at 1276 Route 28 pays annual
Real Estate Taxes in the amount of $4,272.00, which is based on Taxable Value of $510,500.00.
The owner of the property at 1282 Route 28 pays annual Real Estate Taxes in the amount of
$3,443.00, which is based on a Taxable Value of $409,100.00. Combined, the three properties
result in the generation of real estate taxes in the amount of $9 295.00 based on combined
assessed value of $1 107 300.00.
Based on the tax rate for the Town of Yarmouth for Fiscal Year 2023 of $9.18 per thousand,
and based on the estimate that the property will be valued at approximately $4,000,000.00, the
total real estate taxes will be $36,720.00, an increase of $27,425.00. Even if the property :will
not be valued at $4 million dollars, which is what my client is spending to build this project, a
valuation of $2 million would still generate real estate taxes in the amount of 18,360.00, and
increase of twice what is being paid now.
The location will house 2 separate businesses — the gas station/convenience store, and a
Dunkin Donuts franchise. The gas station/convenience store will create 3 full time jobs - 2 clerks
and a Store Manager. These jobs will be offered with accrued Personal Time Off, as well as Sick
Time as provided under the Massachusetts General Laws. The Dunkin Donuts location will create
employment for up to 16 employees as clerks and a Store Manager. It is anticipated that there
will be 8 part time positions and 7 full time positions. We have been advised by a representative
of Dunkin Donuts that benefits will include health insurance.)
E. the recommendations of the Site Plan Review team and the Community and Economic
Development Committee;
F. supplementary ROAD District standards:
(L) architectural _styles. Site, elevation, landscape, and sign plans (plans shall be drawn in the
context of one (or a mixture of) the following styles: Historic, Seaside Village, Colonial, and/or
Old Cape Cod (style) which shall have their common and ordinary meaning. Portions of the
overall plans may include contemporary design where necessary for public health and safety or
to eliminate architectural barriers;
(2.) design. Plans shall be evaluated in the context of the findings, objectives and criteria set forth
in this section 411;
(3.) intrinsic or reproduction style value and significance;
(4.) aesthetic and/or artistic quality of the style;
(5.) balance and mixture within the general style design of factors to include, but not limited to:
a. relative size and setting; b. color; c. material, and; d. arrangement;
(6.) respect for the need to balance economic well-being and stability, economic growth, and
employment with protection of the natural environment.
(7) balance. The benefits of the ROAD District development plan shall outweigh its detriments.
Further, the benefits of any deviation or relief from the underlying zoning bylaw shall outweigh
any detriments as determined by the Planning Board.
2. Mandatory Criteria: In order to grant a Special Permit hereunder the Board of Appeals must
find that the ROAD District Development as proposed satisfies the following criteria:
A. those criteria as set forth for the grant of a Special Permit pursuant to section 103;
B. that the goals, purpose and objectives of the ROAD district bylaw will be accomplished;
C. that the project as a whole substantially accomplishes the purposes of the underlying zoning
bylaw;
D. that the benefits to the neighborhood, district and Town from the ROAD District
development's approval under this bylaw section 411 outweigh the effects of any deviation or
relief from the requirements of the underlying zoning bylaw, and;
E. the architectural and site designs of the proposed development plan is as previously approved
by the Planning Board, pursuant to 411.6.