Loading...
HomeMy WebLinkAboutReview Chceklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location A.M. Lot -L( Zone of Contribution: In- Out Acreage Street: Commercial: Residential: y` StrVileet: 2 / 'r s%t-iryQ I� - -- a"' �'\ Floor Plan: ,.-- # Bedrooms: Owner: fr,,.)uc t Tici t,vi ZIP Installer: /� , n l Address: /) ��:x -/i ah 1 Phone: �1 tt �1 f �x e.4v4.14 1 5e,pi Phone: Builder: Address: Engineer. �,�ovA lti� k sn L Phone: Phone: 5-6,15-4/-77 J)py 1. Required#of copies received N/A YES I NO 2. Date of soils exam and percolation test not older than 2 years - 3. 4-5 ft of naturally occurring pervious material, above water table -- - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: - 5. Water ine 10 ft from septic components Var.: - 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic 'ank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,. 11. Tank/leaching minimum 10 ft from property line Var.: V i 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons) or 5' removal 16. Proposed contours are suitable I V 17. System meets slope requirements- min. 1/8", %"preferred / 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee V 20. Sewage is under 10,000 gpd for parcel 21. No garbage disposal 22. System r dequately sized for its intended use / 23.Minimum 6"stone or compacted below tank and dbox I 24. Manhole covers within 6"of grade, pump chamber cover to grade t/ 25. Inspection port on plastic chambers/leach field 26. Electrica permit for pump chamber/Separate meter for duplexes 27. Pump syitem-2"line,weep hole,check valve, tee in dbox,pump sizeV ,�28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for-tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: I ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: 37. Check area lots for groundwater/Label groundwater in Assessor's Map gpd Plal reviewed by: Ar/0 aQ /