Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location A.M. Lot ,I�-( C, Zone of Contribution: In Out Acreage Commercial: Residential: ye Street: -� /ie;t 1k - Village: i,>. Floor Plan: t6' Bedrooms: Owner: A(/eii Installer: Address: VWFc�, vci 1 c�y^ Phone: Phone: So cs -a39 , di`I ti Builder: Engineer: // P�.r c,i e-fiLi, '1QkJ Address: Phone: -74i -,2 3 Phone: - /kid N/A YES NO- 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years - `" 3. 4-5 ft of naturally occurring pervious material, above water table -4. Foundation 2 ft above highpoint of road '� g H.P.: Fnd: Var.: ✓ ----- 5. Water.Me 10 ft from septic components Var.: I /6. Benchmark indicated and shown-NGVD if near wetlands / 7. Septic 'ank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: • i I - 9. Leaching minimum 100 ft from wetlands Var.: I I 10. Leaching minimum 150 ft from drinking we11/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: L./ i 12. System meets all other setback requirements Var.: V 13. Uses adjustment for maximum high groundwater Var.: L./ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons)or 5' removal 16. Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", ''4"preferred / 18. System.lneets breakout requirements PVC liner: / Wall: f 19. Specifiel tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel `� 21. No garbage disposal 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox `V 24. Manhole covers within 6"of grade, pump chamber cover to grade 7 25. Inspection port on plastic chambers/leach field ;/ 26. Electrica permit for pump chamber/Separate meter for duplexes 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size ✓28. Septic tank/pump chamber to be factory waterproofed 29. Vent proyided if leaching below 3 feet,under driveway/parkins 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify commercial: _ LZr- soils: Wall: ;' 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater V 34.Title V Avplication andpermit fee, installer signature V 35. Foundation footing min. 2 feet above adjusted ground water for new house V. 36. Deed Res.riction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: I V- l? a 5 G0 0