HomeMy WebLinkAboutSolar affidavit 21022 ;yam ENGINEERING V
RECEIVED EV ENGINEERING LLC
1825 Dahlia Drive
MAY 11 2022
Cumming GA 30040
BUILDING DEPARTMENT 276-220-0064
By
2/10/2022
SUNRUN
RE: Installation Approval letter for Karl Luke—Structural only
Permit BLD-22-003272 (48 Suffolk Ave,Yarmouth, MA, 02673)
To Whom It May Concern:
On the above referenced project,the roof structural framing has been reviewed for additional loading
due to the installation of the solar PV addition to the roof.The structural review, including the plans and
calculations only apply to the section of roof that is directly supporting the solar PV system and its
supporting elements.
EV Engineering has observed the PV installation that was specified for this project.The review was
performed to verify that the installation was performed in general conformance with the plans and
specifications and that any modifications were acceptable. Calculations were stamped &signed with my
professional engineer's seal.
After engineer's observation, it is our opinion that the work has been completed in general conformance
of the provisions of the approved permits of the applicable code.
Please contact me with any questions or concerns regarding this project.
STRUCT
ONL
Vs\- OF Mgss9c
Sincerely, o�' ti�
VINCENT F
Vincent Mwumvaneza, PE U MWUCIV
L CIVIL
N�. 2
EV Engineering, LLC o1)* . Eck�o �
�•, ONNAALF--C)
TOWN OF YARMOUTII
BUILDING DEPARTMENT
1146 Route 28, South Yarmouth. MA 02664
508-398-2231 ext. 1261 Fax 508-398-0836
FINAL AFFIDAVIT FOR SOLAR INSTALLATION
L te7ri if/ Lic # 6.50/02.?
4(8 $,...(Atk
Property Address
1-b-22-0032.72.,
Building Permit #
'Kai... DE-22-00316 8 26 ZoZZ (8kei
Oectrical Permit # Date Electrical Permit Finalized
Ftave installed the permitted solar system ac rding to the manufactures
stfecifications and the Mass. State Building ode.
I o certify under pains and penalties of peri ry that the information
pkovided is true and correct.
Penni older sign hcr