Loading...
HomeMy WebLinkAboutBLD-22-006818 0 fry'' eiu' 14(0 I ea )k/? ONE & TWO FAMILY ONLY- BUILDING PERMIT Town of Yarmouth Building Department 1146 Route 28,South Yarmouth,MA 02664-4492 (frAgit508 398 2231 ext, 1261 Fax 508 398-0836 G -' 1, s� Massachusetts State Building Code,780 CMR gyp, . 6 2C�22 Building Permit Application To Construct, Repair, Renovate Or Demolish ti:.,: a One-or Two-Family Dwelling BUILDING DEPARTMENT Rv This Section For Official Use Only Building Permit Number: 6CD--024- .6 ( ' Date Applied: Building official(Print Name) ignature Date SECTION 1:SITE INFORMATION 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 84 Early Red Berry Lane,Yarmouth Port, MA 1.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required I Provided Required Provided E Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1 Public 0 Private 0 1.8 Sewage Disposal System: Zone: _ Outside Flood Zone? I Municipal© On site disposal system 0 Check if yes❑ I SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record:Rebecca Earle Yarmouth Port, MA Name(Print) City,State,ZIP 84 Early Red Berry Lane (508)221-7175 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORIC2(check all that apply) New Construction 0 Existing Building 0 I Owner-Occupied 0 1 Repairs(s) 0 Alteration(s) 0 I Addition 0 Demolition 0 Accessory Bldg. 0 Number of Units , Other 0 Specify: Brief Description of Proposed Work: Install 6.80 kw solar panels on roof.Will not exceed roof panel but will add 6"to roof height. 17 total panels. SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Official Use Only Item (Labor and Materials) I. Building Permit Fee:S j ap Indicate how fee is determined: 1.Building $ 2,000 0 Standard City/Town Application Fee 2.Electrical $ 29,000 0 Total Project Cost3(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (IiVAC) $ List: 0: a-73*) 5.Mechanical (Fire $ Total All Fees:$ Suppression) Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ 31,000 ❑Paid in Full 0 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CSFA-067961 07/13/2022 Bruce A Junior-TrinitySolar Inc License Number Expiration Date Name of CSL Holder 20 Patterson Brook Road Unit 1 List CSL Type(see below) R No,and Street Type Description W Wareham, MA 02576 U { Unrestricted(Buildings up to 35,000 cu.ft.) R Restricted 1&2 Family Dwelling City/Town,State,ZIP /v1 Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 732-722-1278 permits.wareham@trinity-solar.com I Insulation Telephone Email address D Demolition 5,2 Registered Home Improvement Contractor(HIC) 170355 10/11/2023 Bruce A Junior-Trinity Solar Inc HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Road Unit 1 permits.wareham@trinity-solar.com No.and Street Email address W Wareham, MA 02576 732-722-1278 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes 0 No .0 SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Bruce A Junior to act on my behalf,in all matters relative to work authorized by this building permit application. Plebeccot Sane 05/12/2022 Print Owner's Name(Electronic Signature) Date SECTION 7b: OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of peg jury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Bruce A Junior 05/12/2022 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.govloca Information on the Construction Supervisor License can be found at www.mass.nov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost' I . , TOWN OF YARMOUTH i . , 1146 ROUTE 28,SOUTH YARMOUTH,MA 02664-4451 '„ ''' ''';.• Telephone(508)398-2231 Ext 1292-Fax(508)398-0836 JUL 0!OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE i yAtitviou i ri APPLICATION FOR L OLD KINC',$1-ilgrHyVAY ., CERTIFICATE OF APPROPRIATENESS Application is hereby made for issuance of a Certificate of Appropriateness under Section 8 of Chapter 470, Acts of 1973 as amended,for proposed work as described below&on plans,drawings.photographs,&other supplemental into accompanying this application. PLEASE SUBMIT 4 copies OF SPEC SHEET(S),ELEVATIONS,PHOTOS,&SUPPLEMENTAL INFORMATION. Check All Categories That Apply: Indicate type of Building: Commercial Residential 1)Exterior Building Construction: New Budding Addition Alterations Reroof 'r — ea sr--'--:--------''---- E i V E D Shed Solar Panels 1 Other: 2)Exterior Painting: Siding Shutters Doors Trim Other: I 1 0 2022 3)Signs/Billboards: New Sign Change to Existing Sign [BUILDING DEPARTMENT 4)Miscellaneous Structures: Fence Wall Flagpole Pool Other: jPlease type or print legibly; 84 Early Red Berry Lane, Yarmouth Port, MA Address of proposed work: Map/Lot# 115/170 Owner(s): Rebecca Earle Phone# (508)221-7175 All applications must be submitted by owner or accompanied by letter from owner approving submittal of application. Mailing address' 84 Early Red Berry Lane,Yarmouth Port, MA Year built: 1968 Email. Preferred notification method, Phone Email , Agent/contractor ReimaccaZaiiie Tin yliti solar Phone# 508-291-0007 Mailing Address 20 Patterson Brook Rd.Unit 1 W.Wareham,MA 02576 Email: permits.wareham@trinity-solar.com Preferred notification method: Phone 1dr Email Description of Proposed Work: Install 6.80kw solar panels on roof. Will not exceed roof panel, but will add 6" to roof height. 17 total panels to be located on the front roof and may be partially visible to the public way. 06/28/2022 Signed(Owner or agent). Date. Omericontractorragent is aware that a permit is required from the Building Department.(Check other departments,also.) ',.. If application is approved,approval is subject to a 10-day appeal period required by the Act. :/ This certificate Is good for one year from approval date or upon date of expiration of Building Permit,whichever date shall be later r Aft new construction will be subject to inspection by OKH OKH-appirwil plans MUST be available on-site for framing&final inspections. For Committee use only: Approved Approved with Modifications Denied Rcvd Date: ll 514 Reason for Denial: Amount ON CashiCK or: 1).,_,5____ Rcvd by: .., i Signed: . / . .,.... „ _...„...,: . 45 Days: A/4 S ?02? Date Signed 8 g 2 Z- __4_____ - ., ' 6: OLD,K1N 'c' HiCiA 5% . 1 APPLICATION U. -.` /"--", DATE(MM/DD/YYYY) ACOREP CERTIFICATE OF LIABILITY INSURANCE 5/20/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACTNAME: Mark GraselaArthur J. Gallagher Risk Management Services, Inc. PHONE 4000 Midlantic Drive Suite 200 (NC.No.Ext):856-482-9900 AX (AICC,No):856-482-1888 Mount Laurel NJ 08054 nDDRESS: CherryHill.BSD.CertM@AJG.com INSURER(S)AFFORDING COVERAGE NAIC II INSURER A:Gotham Insurance Company 25569 INSURED TRINHEA-03 INSURER B:National Union Fire Insurance Company of Pittsburg 19445 Trinity Solar Inc. INSURER c:Endurance American Specialty Ins Co 41718 20 Patterson Brook Road, Unit 1 W.Wareham, MA 02576 INSURERD:Liberty International Underwriters INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1248630518 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADDL SUBR POLICY EFF POLICY EXP LTR R LIMITS INSR OF INSURANCE INSD WVD POLICY NUMBER (MM/DD/YYYY)_(MMIDD/YYYY) A X COMMERCIAL GENERAL LIABILITY GL202100013378 6/1/2021 6/1/2022 EACH OCCURRENCE $2,000,000 DAMAGE TO RENTED $100,000 CLAIMS-MADE I X OCCUR PREMISES(Ea occurrence) MED EXP(My one person) $5,000 PERSONAL&ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $2,000,000 POLICY JEC X PROT LOC PRODUCTS-COMP/OP AGG $2,000,000 $ OTHER: COMBINED SINGLE LIMIT B AUTOMOBILE LIABILITY CA 2960145 6/1/2021 6/1/2022 (Ea accident) $2,000,000 X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ A UMBRELLA LIAB X OCCUR EX202100001871 6/1/2021 6/1/2022 EACH OCCURRENCE $5,000,000 C ELD30006989100 6/1/2021 6/1/2022 D X EXCESS LIAB CLAIMS-MADE 1000231834-05 6/1/2021 6/1/2022 AGGREGATE $5,000,000 Limit x of$5,000,000 $19,000,000 DED RETENTION$ PER B WORKERS COMPENSATION WC 13588107 6/1/2021 6/1/2022 STATUTE OTH- ER AND EMPLOYERS'LIABILITY Y/N E.L.EACH ACCIDENT $1,000,000 ANYPROPRIETOR/PARTNER/EXECUTIVE NIA OFFICER/MEMBEREXCLUDED? E.L.DISEASE-FJIEMPLOYEE $1,000,000 (Mandatory in NH) If yes,describe under E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS below All Other Units $250/500 B Coe CA 2960146 6/1/2021 6/1/2022 Truck-Tractors and Comp/ompl Collusion Ded. 1Semi-Trailers $250/500 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Evidence of Insurance. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Evidence of Insurance AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents qi M=.0.0,'.) '? Office of Investigations s ._ y,f Lafayette City Center _ f 2 Avenue de Lafayette, Boston,MA 02111-1750 ..- ` www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Trinity Solar Inc Address: 2211 Allenwood Road City/State/Zip: Wall, New Jersey 07719 Phone#: Are you an employer? Check the appropriate box: Type of project(required): ❑ I am a general contractor and I 6 ❑New construction l. I am a employer with 300 4. employees (full and/or part-time).* have hired the sub-contractors listed on the attached sheet. 7. ❑ Remodeling 2.❑ I am a sole proprietor or partner-ship and have no employees These sub-contractors have employees and have workers' 8. ❑ Demolition working for me in any capacity. . 9. ❑ Building addition [No workers' insurance comp. insurance.* comp. 10. Electrical repairs or additions required.] 5. ❑ We are a corporation and its 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.]t c. 152, §1(4),and we have no 13.❑ Other employees. [No workers' comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. I.Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: American Guarantee and Liability Ins Co Policy#or Self-ins. Lic. #: WC 13588107 Expiration Date: 06/01/2022 Job Site Address: 84 Early Red Berry Lane City/State/Zip: Yarmouth Port, MA Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the"is ar nil-t perj at the information provided above is true and correct. ' Date: 05/12/2022 Signature: Phone#: (508) 291-0007 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(check one): 1❑Board of Health 20 Building Department 3❑City/Town Clerk 4.0 Electrical Inspector 5 lumbing Inspector 6.0Other Phone#: Contact Person: . . UCommon:ealth of Massachusetts .,.. " Division of Professional Licensure Board of Building R-»ulatiolis and Standards Constructio •. l' , 1 &2 Family CSFA-067961 ..,,-? 'L,"„ 15;soires:07/13/2022 , ..., • ,..7 BRUCE A JUNIOR 8 8°MERVILg ST ' ,,,./118, • „..%". MARSHFIELOPA 0 ,..4 , •,,, -.. /,' ,F, I CliSSIt1(56' Commissioner (laera A'. BjEkn CLE0L, i'..; , ,.., '1 ! 4. 15. to c.) c ._ cc 2 0 a) w c cu 0 -5 ,s, lc 2 7-1 a c E CD 01 4 c 0 cu co N---. Col 0) 0 o, (/) . 0 w co c ... I— — lc >, I— c al CI) 0 a 0 G .Z. 07 • C en cn (1) .,---, 0 771 •• = ri) = 11 0 ET2 a 5 o 13,-- 10 CO t ...... = - iti > U- 46 0 Z = (I....) c 2 0 li•E'd (0 - Ill "'''' '1-= .2 E oc w 0,-•02 .c.. E 00 ul c0 ° E L.)C.) E , u „,I - a)m a) 2 I 2 k 2 I-- 0 gv.gi o ,,,o) 0 "".(C Z(..) o z — z—1 — 0 0. < o 2 z c) x cr) LI g 0.4 04 "±----1"") z < - ,r), E 1- N. • 2 c iii Z 0 0< cl-92,71 0, 0 (p_., >-x c,c4 1--E R al< 0 1— w r -2‹ Fcc° ® NJ,Electrical Contractor business permit number34EB01547400 NJ,HIC reg.tt 13VH01244300 SOLAR For other jurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses HOMEOWNERS AUTHORIZATION FORM Rebecca Earle (print name) am the owner of the property located at address: 84 Early Red Berry Lane Yarmouth Port,Massachusetts 02675 United States (print address) I hereby authorize Trinity Solar Inc. ("Trinity Solar") and its employees, agents, and subcontractors, including without limitation, , to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System, Battery System, roofing or other Trinity Solar offerings located on my property, applying and obtaining permission and approval for interconnection with the electric utility company, and registration with any state and/or local incentive program(s). This authorization includes the transfer/re-administering, and/or cancellation of any existing permits on file for the purpose of updating/applying with an alternate subcontractor. Without limitation to the generality of the foregoing I specifically authorize Trinity Solar et al.to populate technical details,fill-in, edit,compile,attach drawings, plans,data sheets and other documentation to, date,submit, re-submit, revise, amend and modify application,submission and certification documents ("Approvals Paperwork"), including those for which signature pages are included herewith for my signature, in furtherance of the related transaction, and I am providing any signatures to Approvals Paperwork for purposes of the foregoing.Trinity Solar will provide copies of Approvals Paperwork when submitted. My authorizations memorialized herein shall remain in full force and effect until revoked. I acknowledge that these authorizations are not required to proceed with the transaction and are not a condition of the related agreement included herewith but are being given for my own convenience and benefit in order to expedite the approvals processes. Electric Utility Company: Eversource(Formerly NSTAR) Electric Utility Account No.: 14721820059 Name on Electric Utility Account: Rebecca Earle Reber a,Eade- Rebecca Ea:e!Apr25,1022 17.32 EDT',• Customer Signature Rebecca Earle Print Name April 21, 2022 Date Corporate Headquarters 1-877-SUN-SAVES 2211 Allenwood Road Ph: 732-780-3779 Wall,New Jersey 07719 Fax: 732 780 6671 www.trinity-solar.com FOR INFORMATION ABOUT CONTRACTORS AND THE CONTRACTORS' REGISTRATION ACT, CONTACT THE NEW JERSEY DEPARTMENT OF LAW AND PUBLIC SAFETY, DIVISION OF CONSUMERS AFFAIRS AT 1-888-656-6225. §TOWN OF YA . OUTH 1146 Route 28, South Yarmouth, MA 02664 508-398-223A ext.-1261 Fax 508-398-0836 Office of the Building Commissioner BUILDING DEPARTMENT DEMOLITION DEBRIS DISPOSAL AFFIDAVIT Pursuant to M.G.L. Ch. 40, §54 and 780 CMR- Section 105.3.1. #4. I hereby certify that the debris resulting from the proposed work/demolition to be conducted at 84 Early Red Berry Lane, Yarmouth Port, MA Work Address Is to be disposed of oat the following location: 20 Patterson Brook Rd Unit 1 W. Wareham, MA Said disposal site shall be a licensed solid waste facility as defined by M.G.L. Ch. 111, §150A. 05/12/2022 Signature of Application Date Permit No. MA,Master Electric Contractor#21233A • MA,Home Improvement Contractor#170355 Rhode Island Contractors'Registration and Licensing Board Registration No.39372 SOLAR Rhode Island Renewable Energy Prof REPC-126 For other jurisdictions,please visit:http://www.trinity-solar.com/about-us/locations-and-licenses April 12, 2022 Tristan Souza Applications Specialist 20 Patterson Brook Rd. Unit 1 W. Wareham, MA 02576 (732) 722-1278 Tristan.Souza@trinity-solar.com RE: Permit Application for Solar Installation Building Department: Town of Yarmouth Bldg Dept 1146 Route 28 Yarmouth, MA 02664 Enclosed please find applications and checks for 84 Early Red Berry Ln. building and electric permits. If you have any questions, please contact me at 508-291-0007 x1231. Checks attached Very truly yours, Tristan Souza Applications Specialist Wareham, MA and Rhode Island Offices 1-877-SUN-SAVES 20 Patterson Brook Road, Unit 1 Ph:508-291-0007 Wareham, Massachusetts 02576 Fax: 508-291-0040 www.Trinity-Solar.com ONE or TWO FAMILY— BULDING PERMIT APPLICATION REGULATORY APPROVALS NOTICE Address of Proposed Work: 84 Early Red Berry Lane, Yarmouth Port, MA Scope of Proposed Work: Install 6.80 kw solar panels on roof. Will not exceed roof panel, but will add 6"to roof height. 17 total panels. Date: 05/12/2022 Based on the scope of work described above,the applicant is required to obtain approval sign- offs from the following departments as checked-of below: Health Dept. —508-398-2231 ext. 1241 Conservation—508-398-2231 ext. 1288 Water Dept. —99 Buck Island Road, 508-771-7921 Old Kings HWY. Hist. Comm. —508-398-22631 ext. 1292 Engineering Dept.—508-398-2231 ext. 1250 Fire Dept.— Kevin Huck/Scott Smith, 96 Old Main Street, SY Note: Please call Fire Department for an appointment. 508-398-2212 Other Appropriate plans and/or application shall be provided to each departments checked-off above. Each of these regulatory authorities has their own requirements outside the jurisdiction of the Building Department. All applicable approvals shall be obtained prior to submitting a building permit application to the Building Dept. Thank you for your cooperation. Receipt Acknowledgemen • 05/12/2022 Applicant's Signature Date Rev.Jan. 2019 SOLAR Yarmouth, MA May 10, 2022 Town of Yarmouth1146 Route 28 S. Yarmouth, MA 02664 RE: EARLE, ROBERT K; EARLE, REBECCA K Trinity Solar No. 84 Early Red Berry Lane 2022-04-692535 Yarmouth Port, MA 02675 To the Building Official; The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic[PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing is 2x6 at 16 o.c.; existing rafter span= 11'5"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load (pounds per square foot- PV panels, mounting rails & hardware) • 5.7psf-existing roof loads (1.7 psf-2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load -30psf-per AHJ (Authority Having Jurisdiction) • Wind criteria- Exposure Category B, 140 mph wind 3. Existing Roof modification -none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers' specifications and complies with all applicable laws, codes, and ordinances—specifically the International Building Code(2015 edition)and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48"o.c. between mounting brackets (staggered)and is secured using 5/16"diameter corrosive-resistant steel lag bolts. A minimum of 21/2'of penetration (embedment) per lag bolt is required, which will resist all stated loads above—including wind shear. Per NDS Section 12.1.4, clearance holes -equal to the diameter of the shank- need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Thor Bojcun, PE Structural Engineer-Trinity Solar 4 CM; MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 i West Wareham,MA I(508)291-0007 VVI:u Juyi CI IVCIVF.JC IV.Jr" ../O II I-JJJC-'-FCJV-Or"JV-:J I I..CJ I IL.sun n va OV JY Sunnova Home Solar Service � Easy Plan TM Power Purchase Agreement (PPA) Balanced Billing HOMEOWNER ROBERT EARLE DATE ISSUED 4/21/2022 10:04 AM ADDRESS 84 EARLY REDBERRY LN INSTALLATION 84 EARLY REDBERRY LN YARMOUTH PORT, MA 02675 LOCATION YARMOUTH PORT, MA 02675 .1 $119.25 Years Down payment Upfront Payment (if Rate per kWh—Year Monthly payment—Year Agreement term applicable) one one (Includes ACH discount) (Includes ACH discount) AGREEMENT BENEFITS & INSTALLATION PROCESS • Trinity Solar and Sunnova will install a 6.800-kW solar n If you sell your house,you may transfer the agreement and system on your home. warranties to the new homeowner, provided that the new • Your system is estimated to produce 8,467 kilowatt homeowner meets Sunnova's credit requirements. (Sec. 11) hours in the first year of service. (Schedule A) s If you choose not to renew the agreement at the end of your 25.00-year term, Sunnova will remove the system at no cost Your agreement includes your down payment of$0.00. to you. Conditions apply. (Sec. 17) m Your monthly payment will never increase by more than • This agreement requires the parties to resolve their disputes approximately 2.9%per year. (Schedule A) by arbitration rather than by lawsuits in court;jury trials and • Trinity Solar will complete the design and engineering class actions are not permitted (Sec. 19) drawings for your system,and Sunnova will review the • Your agreement gives you a 7-day cancellation period final design to ensure it meets our high-quality without incurring any fees. standards. (Sec. 5(b)) • Any savings estimate is dependent on the energy usage • Your system activation may experience delays as a result information you provided us and may change as your usage of the process for obtaining the necessary building permits and utility rates change over time. and utility approval for net metering and interconnection of your system.Once your system is installed, it must still Your solar system is covered by the Limited Warranty for pass utility inspection before you can turn it on. the term of the agreement. (Exhibit 2) ▪ You will receive a 10%discount each month when you Once your system is turned on and operating,you will set up automatic payments from your checking or savings receive two monthly electricity bills:one from Eversource account(pricing above already reflects discount). (Sec. Energy(Formerly NSTAR Electric Company) and one 4(e)) from Sunnova. ▪ You may renew this agreement for up to two successive When the electric grid goes down, your solar power system five-year terms at the end of the original 25-year term. will not work. (Sec. 10) I have reviewed, understand and agree with the above agreement terms and process. The pricing provided in this Easy Plan TM Power Purchase Agreement(PPA) is valid until May 20,2022 Ho g er's initials Homeowner's initials 20 East Greenway Plaza Ste 475, Houston,TX 77046 Agreement ID: FU004569953 281 985.9900 www.sunnova.nom uiuu.DiyiI CI IVCIupC ILJ.Jr%,/O.,r I-JJJC-YC:JO-Or Ju-:J ItwCJ I II,OOJV Su n va y Sunnova Home Solar Service Easy Plan TM Power Purchase Agreement (PPA) Balanced Billing Homeowner Name and Co-Homeowner Name Installation Location Installer/Contractor Address (If Any) 84 EARLY REDBERRY Trinity Solar ROBERT K EARLE LN YARMOUTH PORT, 2211 Allenwood Road 84 EARLY REDBERRY LN MA 02675 _ Wall YARMOUTH PORT, MA NJ 02675 7719 License: Contract ID CA: 1072590; CT: 0635520; FU004569953 ELC.0195559-E1 I DE: 2066600876; T1-0005929 FL: CVC57148 I MA: 170355; 21233A I MD: 132333; 11834 0491C ( NH:0491C I NJ: 13VH01244300; Electrical Business Permit# 34EB01547400 I NY: 52821- H; H.2409780100; L004203 PA: PA128551 I RI: 39372 ; AC005040 Salesperson: Cole House HIS#: Salesperson Address: Trinity Solar Sunnova License: Sunnova MA 184093 Estimated Solar Energy Production Estimated First Year Annual Production: 8,467 kWh Estimated Initial Term Total Production: ! 199,454 kWh Payment Terms Upfront Payment Amount: $0.00 Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.9 % /year First Year Solar Energy Rate, if paid by auto-ACH: $0.169/kWh First Year Solar Energy Rate, if not paid by auto-ACH: $0.186/kWh Reduced Annual Solar Energy Rate', if paid by $0.169/kWh auto-ACH: 20 East Greenway Plaza Ste 475,Houston,TX 77046 281.985.9900. www.sunnova.com ©2018 Sunnova Energy Corporation.All Rights Reserved. 1 Date:4/23/2022 Contract ID t= t3#i45691);; • • . • SOLAR Yarmouth, MA May 10, 2022 Town of Yarmouth1146 Route 28 S. Yarmouth, MA 02664 RE: EARLE, ROBERT K; EARLE, REBECCA K Trinity Solar No. 84 Early Red Berry Lane 2022-04-692535 Yarmouth Port, MA 02675 To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic[PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing is 2x6 at 16 o.c.; existing rafter span= 11' 5"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load (pounds per square foot- PV panels, mounting rails & hardware) • 5.7psf-existing roof loads (1.7 psf-2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load- 30psf- per AHJ (Authority Having Jurisdiction) • Wind criteria- Exposure Category B, 140 mph wind 3. Existing Roof modification - none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers' specifications and complies with all applicable laws, codes, and ordinances—specifically the International Building Code (2015 edition)and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48" o.c. between mounting brackets (staggered)and is secured using 5/16" diameter corrosive-resistant steel lag bolts. A minimum of 21/2" of penetration (embedment) per lag bolt is required,which will resist all stated loads above— including wind shear. Per NDS Section 12.1.4, clearance holes-equal to the diameter of the shank- need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Thor Bojcun, PE Structural Engineer-Trinity Solar A•opl 1:4 WI /I/ r ems+ M t { MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 I West Wareham,MA I(508)291-0007 rn v m COm .D0 Z el ' 2 1 .. ° n0 m S it m0 D 8 ! O \4 3 •0 o C 0 a1111111111111111111! 0 Ca I- 6' � tQ III r-ii a ra'=�' ° E OZrc, . � O. 0u m a -PS i a Om E f ' ; ; III' 2 a rFi,O q, O d m z _,ti •y L O Giz 81; fat w it d mQ c S 251 O i tam - I R 5l= Fs� �3a PT 5 _ m -?,i„ . 'a g= k i§, S w m Vim m a �f t p a � 1 3 0� i Ili o w4 F P : iijma � �IF 1° Oi �- If,I' :1 T z flNVI � R�D i q ava G1 Mnlmvn ! Mm1m�m i! p a # f y3 e •! ! ! �.a lIlt! I i 's Is c I €I° IrI it i. i" Y T d ! S S 2 2 ! Ia� ! # ai L' II - aa ! !., ead4I.1 Q JI, Il I ° 9 $ 9, ' I, ^ : ; j 33 iE 1 5 IG 8 1 s ,t i I $ 0 5 di 8 .. a T I I lit - e" I i n > t • n3 C p��e 2`[ $ 0 1 i 0 3, W i 4 m M c „ i�� g l& d 0 S A FI a E f3R rf 4 m 1401 i3 3 I N 53 Y i. ggE� pT§ %� ��5 m m tI 3 1 (1 m iF s in` iljll^l7 ii Z " SEEP t235., 2 f-y 2 i ICI R N 1`' 2 �H i' _iy,1 N I R S BB L_e r 0 I 13 siSi " 1 Z i 1 �e Z6 bo N1 S I;'n CEli ;PA ~ m S I s ; g Q a 3 m et��s , k G 8 k I& F v i III A 6 5 E gi) T. y a 8°' 8m %'. Y n I , T •i 3g n 0 n fr ! rs � ' Et EIr IQr. 11 I f . —I I : : ::::: : i! 111` s31 g,. E 8S8& e 0 ss a o lli' i JII pI f E 4b z o- a At J i s U p I g l l ref .0 j F 1 F � fr.. ., cb �me g 1.. ,- '� f ri{ 3� u i I gZX8• `Wgiati y■ ..,,«.e.o.. ,o.o..dow..aauaw,.�„oau�-z,�.-,ff...a.xin-�...mn I 1 • 'a > Ez \ N N Zo N -a � Wm g� N > •—' Q 5 c* ry § t / K ! a ijo wam > 5 o4y ;� Q - a ° i. � G m ' xE' wa m — ;�..s — �o 1 iw v Ffi° p u c :0iF !� °: i. p ! wa,4g p Fm E , 8gfW i s / W H 1 w W w H z 00 w z 1 z of < a OO > Q Li_ O J 0 cc 2 ? W Q ocow Z H 0 Lu Z J w 0 W 11 I u] w J z Q Ex d - z xw w u- HLL 0 0 0 J a_z U x W < W 7 N M d 2 I aaa < 0 g u_I i4 �/� o `V / O F U aoo w i 0 w o W w Ao O � O O o IS 2 5� l'sJ z g x m \/ / V 1 p �w' d wowui mv� 'a x DM; o W o f giN zb p i ,-,Izm ExN W \iJ � > uo�Z2 wow m Srcxm��w Y3aaaoo oYoS S noorci ano ZO > myL§HmmiDoo $auu" Oz w _J ` „ <w m w wOp m z w mLL rcm¢g m w irimww°oo so. g a U R. >Z WN YRNitm� rc Ozxw w a 6 o� wu ? oz ix an3 p M0 0 '2a 6 R,t4g 3 ° gs 88g <� ., a0,V*gzu3tto m w/1EL !3mwOoEWL4 °au QLw ^^L ul� up1 om ois moww uxot wwLLEew w i5.84�dnrcTwi 1J "aaaauwuuuu000w LL 2a mU UUUOOWWmuULL2Q W m e m J J D o p � a - x zCCO m 8= == 3 = J= = o rLL H ! o o=w qm � mw �w = < pw a =Wp §.pQ wQ 2 a8503 � a�� wzqos io w% s = i,a w D awr o ,1a q` owA o ii 00 = =°mg-ypw om gw> �w� �°� �=��ww =m��=ww�n= o� oy��oo Z w 6,1ggnq <az>wownu�ogq opi t�zmtog ffi aig�zow�°wz°> ��pO>5ow'o�og3auig°�FzW0a�ucio = w3 � oii o o0.-wmg'$o�-�zrco=�=oLLaz�z� arm 0 0 maw nga az Oo 0 3 o w �� � new Qus��d _ _`d xo�.�.o�'a�°a o�oEm U w g Z j0 'i w wa 0 mJ � x U n Jgozao,O`Ag °i'§iLttgzaaa i33tE rFg8W oW3 3 POli' 1 ww?"- ,°.=o m EmWm o�i�Ox PJ ro eg i., <owoLLmyyrooanl i n',i f� * w 3 oow �lgmig�`ia¢ a _:lo °waaa ppewao i i Hu �irmg�8g W� U G� 1 ws s m a• o N� Z oQ w 1 3 gom i y € s a >aN - > - s o " ,I cI2P 5 §° r a • Q .3 am' s m ^ W. ° `o R = . ap'og8 m J a m s _ a ;W w ac H w t o Q10 o Epa 'm ' y_.—x d' .__ O p W a m ^ m w € e '�.� cn o^ n v wow r W ENN aGG� ., od t .. s mad a o =0mo E , ,2n38Yf 0 €t : w z _ w w w o o > o a Q 3 6„ ���o o a�j ? I - / d i a` a` oo� m oa"PPfS `o � 23" L. v\ 5 IliI _® /\ _ s 0 f 0 0 J a re 8 • 8 O = w _ y ai ga . 1 . ■G w mO ® 9 >ii! oK oo=w 0 3 x a O ® o 0 a r e w a z T. / I q no - z y rco �Oiw� Bw H w pg`_ n wsN $ $ o m ° oa -,I 41 qaw a /- ,7 yg I w y " ° y '" xo z // o° wow w o a m3 v < °swi o ° v 0w /� 1 g w� 2 w i or wo 1 w J oaz. °=ow rc i ww �' oo /� ' iF EN cv`,o E. iof o Ew Quo io ¢o wo M- .,. q� a Pvi4 pzz 8ULL U< z 1 x W° _ z iA 1• 1 I -LLW3zp LL .. z wm pw ° Pi4a a 01.upy �� S s INFwma ow ° _ _u wq-awo MI Xi 1,3 1 =�,omN F os g--s v aq gq I I m2B1,0 aw ;w L 0- rgs 'oS I 1g°22U%2 0 8,1 0 3 q i i!;i,o 4wF qi 1 �- 22i1 Z KU -i ip qg�op zg�W sip~ ppm poi I zz_ � W y.. Np FLLyz p y I QWZOO°O U' y wp 14 l', - , 1 _ I - ma w° : of 0 8g aw w � wwa �w J P wpo Mg HP.q tea ,,n 1 wE<- 4, - - -o p py m $p ii11 W � U O Zi W i N D ^ O O O O O O Elp y a > Wb� IA� 1� Wad W�< r r♦ o°`�-'= o°�= o't= ooks WI �Ook" nok" MI oo�p r ¢Pao oP.° afoo pPao WI gPao ¢Pao $Pao pPao s a 5om N Y > € Q 4 ° 2N m CL J W1 8 a o12 �o o s 0 � „ a ` m w „ m� 3 3 ° `°- . - ¢ 06oc i o` cme 9 i a w � -- e a z c ° m w d wok a '9 � Ng= 8" 'v _ GG ^ w d o m i a 3 3 3 m :a>x C - m �'. 'o o,2-'c 'm z a a 0 0` oos rn o�aif s>>> B. r --1 \\ NN I&I®I IQIQI 2 Ad Ad / o _ F ¢ 3 I B {] �8.-. pl 3 3 3 i i m - N . P i 3 '' z 3 S 3 �___J �p � � o o � 3 w 3 3 3 3 S 5 •'T m m : 5 h. Wo:sue L- �Ni r� e aof 2 ma ' m` x a 'al z Na ,a re � o- W m ^� MR °S , ) 'o mR °� a m„r aSs la z 1 leo o I 54: 1 z ,..�,,,,i n 1g �, lea's 1 ;Jau 8~ i l f9F= „ 1uIL' 0 q of » g m E a Exe ° $ - - - oil m i ° 00wz jutg fO o d E.g .,.. u � � S "' 3 F III, hi K w o W ZO� S m w wdz i o Nao ,`"�5 - IF.. sN mma„N N ' WW o�� 6af h�41 11 114' ' S a? z&o amE os "' '°' _ a ? g > M ; �°sG fmzo o`=_� _ °LL< ill Ew o°emu' °z w» o"ao °° 2S w z W gu �gQ zQ2' r°':'-'o� 03� foa °° Y -goo�g mo $o F. wgz _ G zW ao '" � g °9 �c w,�ua ij§ rin 5E11! 4; Na� of°m o>"11ti iZ Pi _w q i7W:„ Ego 3 C°u a 0 o z L o V°z. fib _ iiN ,, - n1 '`e ° g4z�zawao IPO SsoW ° wa 'oxm- "'� zi � -' omi� w °o° of o0r!o= 'oi x- o,g E= 8:= wm3G,10 i Nx - gW u oe- me:o " 3 a .. 03> zz i �o�_ -,� i � whom �� r ¢ c��� '°g-O -o„ Sx-o 1�a °� W`;Hg, mow° z'oou6N a6Wr2zx� YAW _am u3m wz_ go oT 'E.a Piro m <^ 6:J ?WFFN L10. ni° * N--dE rigs `g� uLLi-; BG,5a'a n Woo W1'g q2 �F 0, =W3° S iln m ° ," oiW • ai° aW 1° omw�' so 4.-'Eu S E1' i� ' a nor >i-l.;. ' g4i ai ion Se - - a .'z `y z .“ 5ry ofyy ,a" y „ W . SEa �= NNow Poo „. m3s"',.3°u mo in .:aoS �SSi tiu9 �a Stu aaa� R a2S m y•o / SOLAR EIV Yarmouth, MA E D September 2, 2022 Town of Yarmouth1146 Route 28 S. Yarmouth, MA 02664 SEP 16 2022 RE: EARLE, ROBERT K; EARLE, REBECCA K Trinity Solar No. ( 2022-04-692535 84 Early Red Berry Lane BUILDING DEPARTMENT 9 Yarmouth Port, MA 02675 — --_ To the Building Official: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. The solar photo-voltaic(PV) system installed at the above-referenced location conforms to the manufacturers' requirements/specifications. The PV system complies with all applicable laws, codes, and ordinances—specifically the International Building Code(2015 edition)and the International Residential Code (2015 edition), including all Massachusetts regulations and amendments. Trinity Solar was on-site during the final inspection under direct supervision. Regards, lhor Bojcun, PE Structural Engineer-Trinity Solar KoF 1 if 4 le � h, '' r i / • MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 I West Wareham,MA I(508)291-0007 SOLAR L--- Yarmouth, MA SEP 16 2022 ay 10, 2022 Town of Yarmouth1146 Route 28 S.Yarmouth, MA 02664 BUILDING DEPARTMENT RE: EARLE, ROBERT K; EARLE, REBECCA K Trini r No. 84 Early Red Berry Lane 2022-04-692535 Yarmouth Port, MA 02675 To the Building Official: The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic[PV] system on the existing roof framing components at the above-referenced location. Criteria is as follows: 1. Existing roof framing: Conventional roof framing is 2x6 at 16 o.c.; existing rafter span= 11' 5"; (horizontal projection) 2. Roof Loading: • 3.0psf dead load (pounds per square foot- PV panels, mounting rails& hardware) • 5.7psf-existing roof loads (1.7 psf-2x6 framing, 1.5psf roof sheathing, 2.5 psf shingles) • Ground Snow Load- 30psf- per AHJ (Authority Having Jurisdiction) • Wind criteria- Exposure Category B, 140 mph wind 3. Existing Roof modification - none required; existing roof framing is acceptable for PV installation. This installation design is in general conformance with the manufacturers' specifications and complies with all applicable laws, codes, and ordinances—specifically the International Building Code (2015 edition)and the International Residential Code(2015 edition), including all Massachusetts regulations and amendments. The spacing and fastening of the mounting brackets is a maximum of 48" o.c. between mounting brackets (staggered)and is secured using 5/16" diameter corrosive-resistant steel lag bolts. A minimum of 21/2"of penetration (embedment) per lag bolt is required,which will resist all stated loads above—including wind shear. Per NDS Section 12.1.4, clearance holes-equal to the diameter of the shank- need to be bored into a primary framing member for the full-length of the threaded portion of the bolt to avoid splitting of the framing member. Regards, Thor Bojcun, PE Structural Engineer-Trinity Solar 'A, t i Ay 'ix f % MA License No.56687 Trinity Solar 120 Patterson Brook Rd,Unit 10 I West Wareham,MA I(508)291-0007