Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST .2/ �/9 Location: AM .i LOT 74 Date of Subdivision Approval Street S Zone of Contribution: In Out j� Commercial Residential Village C., ( i U,61�� Owner: 4 4 d Installer 771271 Builder: / Engineer i 44.a"(- ) N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown - NGVD if near wetlands. �, 7. Building sewer does not exit center of house. L/- 8. Septic tank a minimum of 10 feet from house and deck. 1./ 9. Leaching a minimum of 20 feet from house and 10 feet from deck 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. �/ ie ` 13. Uses adjustment for maximum high groundwater. � 14. Leaching 4 -5 feet above adjusted water table or bottoniof test pit. l 15. System not in top or subsoil or 5 foot removal. t. 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. )(Kit/ 19. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10,000 gpd for parcel. ✓. 21. No garbage disposal. 22. System adequately sized for its intended use. L------ 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box. alarm on separate circuit. .1 27. Septic tank and pump chamber to be Factory waterproofed. -_---- 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. ` 31. H2O loading when system subject to vehicular traffic, N...--- 2. Title V application and fee signed by a licensed installer. �/- D3. Foundation footing 2 feet above ad usted water table. 34 Lot subdivided prior to July 31. 1986 - Nitrate Loading. 35 Subdivided prior to April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: • • k thio