Loading...
HomeMy WebLinkAboutCOC requestYarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us Rev 2/2023 Administrative Checklist Certificate of Compliance General Information: • All filings must be made on Town of Yarmouth forms. • All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. • Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. • Contact the Conservation Office if you need assistance. Submitting an Application: 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzo@yarmouth.ma.us. ______ Signed statement from an Engineer or similar professional to who prepared the approved plan. – Include in hardcopy and digital submission. ______ As-Built plan – Include in hardcopy and digital submission. Refer to 310 CMR 10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if required*. Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth” and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel-related Conservation documents. CONSERVATION OFFICE wpaform8a.doc rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 83-2302 Provided by DEP A. Project Information 1. This request is being made by: Jake Simmons Name 2 Channel Point Road Mailing Address Yarmouth City/Town MA State 02673 Zip Code 508-815-55555 Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Channel Point LLC Applicant Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 10/28/2021 Dated 83-2302 DEP File Number 3. The project site is located at: 2 Channel Point Drive Street Address Yarmouth City/Town 14 Assessors Map/Plat Number 9 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Channel Point LLC Property Owner (if different) Barnstable County Book Page Doc 1,445,006 Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorilycompleted. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DEP File Number: 83-2302 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). Photo 1: View of the rear face of the newly constructed pool, patio, breezeway, and garage on the property. Facing Northwest. Photo 2: View of completed pool, patio, and garage, note drain incorporated into patio. Facing Southwest. Site Photographs 2 Channel Drive West Yarmouth, MA August 2023 Page 1 Photo 3: View of the newly installed pool filter and electric panel along the side of the Western side of the newly constructed garage. Facing North. Photo 4: View of the new landscaping in the Northwest corner of the front of the property. Facing Southwest. Site Photographs 2 Channel Drive West Yarmouth, MA August 2023 Page 2