Loading...
HomeMy WebLinkAbout143 Pawkannawkut Dr planDEMO EXISTING WALLS REMOVE EXISTING WINDOWS BREEZEWAY REMOVE EXISTING GLASS DOOR FIRgT FI C)C)R AR-Rl III T SCALE: 1/4" = 1'-0" REMOVE EXISTING BATH FIXTURES EXIST. WALLS 2x4 DE O EX'STING CLOSETS MAR 2 2 m 3 HEALTH DEPT. GENERAL NOTES: • FINAL MEASUREMENTS TO BE TAKEN ON SITE • FINAL WINDOW & DOOR MAKES/MODELS TO BE DETERMINED WITH OWNER • FINISH OF NEW WALLS TO BE PAINTED DRYWALL, COLOR AND MANUFACTURER TBD • NEW FIXTURE MAKES/MODELS TBD 0 WALL LEGEND TYPE SYMBOL DESCRIPTION AB EXISTING WALLS. CLEAN AND REPAIR AS NECESSARY. ENSURE STABILITY. D r — — — — — — I DEMO WALL. WALLS AND FIXTURES TO BE DEMOLISHED AS INDICATED. A NEW WALL. STUDS AT 16" O.C. WITH 5/8" CEMENTITIOUS BOARD, EACH SIDE. U J J w ry LLJ H 2 U ry w U) 0 ry (1) c/) 0 0 ryJ_ N Q c) LL W W o J LL LL Z J W o W W a c- N CD N N r CD ■� W Z O a (vo 0 W N Q 0 N O CV O m LU z O a z g U w U) a p O O z z O U O .J m 0 SHEET clL O O 1 LL N) 0- u- I- J FILE* JDS22104 DATE: 2.10.2023 PROJ. MGR. JDS C.M. N/A 1 f� I, I, I, I, II II I� II II II II II i TO STREET i TO WATER _____= ____—� III__-- III li I OUTDOOR I it �i BALCONY it SECOND FLOOR AS -BUILT SCALE: 1 /4" = 1'-0" RAFTERS: 2x6 @ 16" O.C. GENERAL NOTES: FINAL MEASUREMENTS TO BE TAKEN ON SITE FINAL WINDOW & DOOR MAKES/MODELS TO BE DETERMINED WITH OWNER FINISH OF NEW WALLS TO BE PAINTED DRYWALL, COLOR AND MANUFACTURER TBD NEW FIXTURE MAKES/MODELS TBD •WALL LEGEND TYPE SYMBOL DESCRIPTION AB EXISTING WALLS. CLEAN AND REPAIR AS NECESSARY. ENSURE STABILITY. D - - - - - - I DEMO WALL. WALLS AND FIXTURES TO BE DEMOLISHED AS INDICATED. A NEW WALL. STUDS AT 16" O.C. WITH 5/8" CEMENTITIOUS BOARD, EACH SIDE. W M Q o QO 17 N '^ VJ O O m VJ W a Z K U) a 0 O O z F- u- ct 0 0 J � Q 06 Z 0� 0 O Z O < QLL o z 0 coZ O z 0 U Q W Q i— U) m U) M J ch Z) Irl- m U) Q SHEET 1 FILE* JDS22104 DATE: 2.10.2023 PROJ. MGR. JDS C.M. N/A FIRST FLOOR PLAN SCALE: 1/4" = 1'-0" WINDOW SCHEDULE KEY QTY DIM DESCRIPTION REMARKS 2430 74" X T-0" MAKE/MODEL TBD DOOR SCHEDULE KEY QTY DIM DESCRIPTION REMARKS 2868-E 1 2'-8" X 6-8" EXTERIOR DOOR 2868 3 2'-8" X 6'-8" INTERIOR DOOR 6068-GL 5 6'-0" X 6'-8" GLASS SLIDER DOUBLE DOOR MATCH EXISTING SLIDER 6068-C 2 6'-0" X 6'-8" SLIDER DOUBLE DOOR - CLOSET r NOTE: SITE IN FLOOD ZONE AE ELEVATION 11.0 T.O.F. EL. 7.6 NON -CONFORMING SCOPE OF WORK CONSTRUCTION < 50 % ASSESSED VALUE GENERAL NOTES: • FINAL MEASUREMENTS TO BE TAKEN ON SITE • FINAL WINDOW & DOOR MAKES/MODELS TO BE DETERMINED WITH OWNER • FINISH OF NEW WALLS TO BE PAINTED DRYWALL, COLOR AND MANUFACTURER TBD • NEW FIXTURE MAKES/MODELS TBD �>WALL LEGEND T`,'PE SYMBOL DESCRIPTION AB EXISTING WALLS. CLEAN AND REPAIR AS NECESSARY. ENSURE STABILITY. C r- — — — — — — I DEMO WALL. WALLS AND FIXTURES TO BE DEMOLISHED AS INDICATED. 771 NEW WALL. STUDS AT 16" O.C. WITH 5/8" CEMENTITIOUS BOARD, EACH SIDE. v J J uj H U uu F C d N O c Y C m L um rl 2 0 J N < M J U) u O W � J LL Q_ Q < Z < W O W oo w� �cp N N co N W Z O 2 0_ N < N Q O 17 O O m ' V ) UJ O a z ULLJ Wo. � � w O U- O Z 0 ~ Q Z Q ^J L.{. z O Q o Z 0 0 J Z O o -' � J ILL Q U) C/) LL M d' SHEET Al FILE* JDS22104 DATE: 2.10.2023 PROJ. MGR. JDS FRAME IN NEW FIREPLACES TO CONNECT AS SOLID BLOCK RFromn FI nnp PI AN SCALE: 1/4" = 1'-0" FRAME IN NEW FIREPLACES TO CONNECT AS SOLID BLOCK LOFT TO REMAIN I OFT PI AN SCALE: 1/4" = 1'-0" GENERAL NOTES: FINAL MEASUREMENTS TO BE T) FINAL WINDOW & DOOR MAKES/N DETERMINED WITH OVA FINISH OF NEW WALLS TO BE PAID COLOR AND MANUFACTUI • NEW FIXTURE MAKES/MOD 0 WALL LEGEND TYPE SYMBOL DESCRIPTION AB EXISTING WALLS. CLEAN AND REPAIR AS NECESSAR' D r- - - - - - - I - - - - - - DEMO WALL. WALLS AND FIXTURES TO BE DEMOLISF A I (111 1-Z:= NEW WALL. STUDS AT 16" O.C. WITH 5/8" CEMENTITIC SIDE. AS -BUILT REAR ELEVATION SCALE: 1/4" = 1'-0" REMOVE EXISTING WINDOW REMOVE EXISTING DOOR AS -BUILT RIGHT ELEVATION SCALE: 1/4" = 1'-0" GENERAL NOTES: • FINAL MEASUREMENTS TO BE TAKEN ON SITE • FINAL WINDOW & DOOR MAKES/MODELS TO BE DETERMINED WITH OWNER • FINISH OF NEW WALLS TO BE PAINTED DRYWALL, COLOR AND MANUFACTURER TBD • NEW FIXTURE MAKES/MODELS TBD AS -BUILT FRONT ELEVATION SCALE: 1/4" = 1'-0" DEMO EXISTING ROOF AS INDICATED II■■■i■1■i■I■1■1■1■1■�I 1■�■�. mlmnlml�lmn nn1n._ wilmnlml�lm m111m�. mm�lmnlmml Imnllmr�,. Inlmnlmlllmlll IIImIll�i�lr Inmmnl ;mmm�m III IIIIIIIIIIIIIII IIIIIIIIIIII IIIIII rnll'�m� �� � •--- m11 mn r1/n mlll i� IIII. �11�■i■..__ Ilmnimnlmlll 1 , �' �Ilmn Iml�. ''Ilmlll�l.�.._._ 111111111101�1■IIIII�n11 immlm IIIm11�.. •��m11It�n1m�..... �mlmnlmnlmn Y IIImn111111mn1�1. �nlll�lnnlmmi m111m111�1/111m illmlllmlm II�111/I�Illm.. �IllIN IIm111m111m111 ImI11III11111�1lmlllmlllmh. go11/�nlml Inlmnlmmlmmn nlmnlmmlm �Immlmnl�ml�. mnlmnlmnlmn m11m1111111'1111 Inlmlllmlllm111�,. � m111mn1mnl mllimlllmn� II�IIIm111�111m111�1.. �''� 1 11m111m111m111n1 III Imlllml1111�1 ImI11mI11mI11tllllllm�.. �I fnlmnl/I�111m IIIQIIIIIII�llm1 IIIQ�IIIQ/Illmllim111m11�. - :�:: mm��mn , IIIIIIIIIIIII IIII IIII IIII IIIIIIIIII III ��iiuniiliimii II°mi mllillmi�liii�imil�mlll�rl� lli1. � ,� 11mn1m III III IIII IIII .� ■iiiiiiiii■i� 111/111�1�111�1/IIIm111�1�111�n1m�. Ian �I -- --- - -- --- - � n�� ' ' tnnlmml limiiii imil 111m �Imn I�I�III�t■� n�mn mn1 ■�� ��:r Ili�l/IIimI1111�11��l�lli/1>tili�i�l�i�►/Ilimlllf1�111m111mi1 0111.Irn ��I�mn�mn�minlm__�I��ni����l►!1�ma�mlmmn�mmm DEMO EXISTING WALLS REMOVE EXISTING WINDOW DEMO EXISTING CHIMNEY REMOVE EXISTING WINDOWS AS -BUILT LEFT ELEVATION SCALE: 1/4" = 1'-0" U J J 0 U J N Q cM LL. W u U5 Wof J ,L CL z .J W Cn O W co a cD N `— N W z O a UJ N Q N 0 0 Om W O a z G U� Wa 0 O LL z I O � J 06 O � = O Z o Q a � LL o z z O 0 m O Z O U Q W Q u) CL U) F— CM � 00 Cn Q SHEET FILE#: JDS22104 DATE: 2.10.2023 PROJ. MGR. JDS C.M. N/A PROPOSED REAR ELEVATION SCALE: 1/4" = V-0" PROPOSED RIGHT ELEVATION SCALE: 1/4" = V-0" Go O I LLL dRACKL- I DETAIL, SEE 3/S-3 GENERAL NOTES: • FINAL MEASUREMENTS TO BE TAKEN ON SITE • FINAL WINDOW & DOOR MAKES/MODELS TO BE DETERMINED WITH OWNER • FINISH OF NEW WALLS TO BE PAINTED DRYWALL, COLOR AND MANUFACTURER TBD PROPOSED FRONT ELEVATION SCALE: 1/4" = V-0" PROPOSED LEFT ELEVATION SCALE: 1/4" = V-0" • NEW FIXTURE MAKES/MODELS TBD U W C/) p0 0 N J c: M � U ■- LL wo W Wc: � J� a o Z ?> J W U) W W c) 00 � U-) U —0 N co N � ■- W w Z O Lu n. C) O W co Q� N Q O 17 Om to W � O a z � (.5 a W 0 O O z w 0 U) Z O z o Q I— w o Z J Z O w m C Q G w w Q w Q O O M w Nil CL Tl- SHEET A3 FILE* JDS22104 DATE: 2.10.2023 PROJ. MGR. JDS C.M. N/A 12'-1" 1'-11" 20'_ 14 14'-2" — lo NEW 8" CONC. WALL W/ 24"x10" CONC. FOOTING 4 — S-1 — — — — — — 1 j� a � a NEW SLAB ON GRADE NEW POST UP d °d d" � I r d U_ d EXIST. SLAB ON GRADE i ° o m _ cc 10 J J EXIST. 46 POST UP/ r <o- POST UP @ STAIR: ASSUMED FOOTING Z NEW 3 1/2" LALLY W/ , ,; Q 24"x24"x10" CONC. FG ° d % J - + m <V a— N i //— NEW 3 1/2" LALLY ON j 24N24N10" CONC. FOOTING L J d a j 1 M u 4" 3'- 10 1/2" 6' - 8" 6'- 8" 6' - 8" L J 13' -11 1/2" lV d - M 4, : t1 G A d� - EXIST. BREEZWAY 24'-0" 14'-2" 48' - 3" 1 FOUNDATION / 1ST FLOOR FRAMING 3/4" T & G Plywood Subfloor 2x4 Sleepers - 2 x 6 SPF #2 Sill Plate - 1/2" Sill Seal - Provide 5/8" x 12" Galvanized Stl. Anchor Bolts w/ 7" Min. Concrete Embedment @ 48" o.c. & 6-12" from End Plates; - 3"x3"x 1/4" Square Washers Required Atop Sill Plate is (1) #4 Horiz. Rebar/ 2" Clear to Top of Wall o ° Q 81 4 8" Thick Poured Concrete Foundation Wall a o � w m Waterproof/ Insulate per MA-780 CMR 24" x 10" Concrete Footing w/ (3) #4 Rebar (Rebar Optional) 95% Compaction of Earth is Required NEW FOUND. WALL DETAIL 1ST FLOOR Exist. Slab on Grade (ASSUMED LAYERING) Exist. Foundation 1' -1It, LUS46 HANGER 2ND FLOOR FRAMING 1/4" = 1'-0" 20' -1" A — GALVANIZED STEEL BRACKETS, SOLID STUDS BEHIND, SEE DET.3/S-3 2 x 6 P.T. LEDGER W/ 2 ROWS OF LEDGERLOK @ 16" o.c., 2" MIN. EDGE DISTANCE @ T&B, 14' - 2" USE (4) SIMPSON DTT1Z EQ. SPACED, TYP. a Z w 4 - 7 1/4" LVL W/ 0.5"x7" STEEL PLATE (2) 1/2" DIA. BOLTS W/ WASHERS @ EACH END @ 2' O. C, N NO STAGGER GANGED STUDS EQ. TO BEAM WIDTH OR SOLID POST TO FOUNDATION 41 cl FLITCH BEAM DETAIL 1 1/2" = 1'-0" n,3 4 n 3n3,2 2 x LEDGER W/ 2 ROWS OF LEDGERLOK @ 16" o.c., 2" MIN. EDGE DISTANCE @ T&B, TYP BLOCKING @ 4 O.C. IN FIRST 2 RAFTER BAYS, TYP. ATTIC FRAMING 1/4" = 11-0" ROOF FRAMING 1/4" = V-0" EXIST. WINDOWS TO REMIAN / UP HIGH @ RIDGE FASTEN RAFTERS """r 1—, " W/ SIMPSON LE OVER TOP OF SHED OR/ 2x6 @ 16 NEW RIDGE BEAM: NEW RAFTEI ALL NON - BE FRAMES NEW 2x6 E� NEW TAPERED 2x8 P.T. @ 16" O. 3-2x6 P.T. BED GALVANIZED STEEL BRACK[ REQ. SOLID STUDS BEHII' 2 x PT LEDGER W/ 2 R( LEDGERLOK @ 1 t 2" MIN. EDGE DISTANCE @ ' NEW SLAB ON GRADE W/ 4" RIGID INSULATIO 2x4 SLEEPERS & 3/4" T&G PLYWOC SECTION A _ Multiple -Member Connections for Top -Loaded Beams Faetnnar Inntallatinn W. mr, Fastener Plies Type(n Min. Length # Rows O.C. Spacing Location 2 10d nails 3" 3n) 12 " _ One side 12d-16d nails 31,y" 2- Screws 3%" or 3V' 2 1 24" 3 10d nails 3" 3M 12" Both sides 12d-16d nails 3 14' 2m 144 Screws 33," or 3> " 2 24„ Both sides 5" One side 10d nails") 3" 30) 12" One side I (Per ply) 12d-16d nails<"� 3 i;' 2�' 4 Screws 5 or 6" 2 24„ 1One Both sides 6 V' side r3V 2 Screws 5" or 6" 2 24 Both sides 6 �4 O ne side '�" bolts 8" 2 24" - When fasteners are required on both sides, stagger fasteners on the second side so they fall halfway between fasteners on the first side. Load must be applied evenly across entire beam width. Otherwise, use connections for side -loaded beams. Multiple pieces can be nailed or bolted together to forma header or beam of the required size, up to a maximum width of 7" (1) 10d nails are 0.128" diameter; 12d-16d nails are 0.148" - 0.162" diameter, screws are SDS, SDW, WS, or Truss-LOK-EWP- (2) An additional row of nails is required with depths of 14" or greater. (3) When connecting 4-ply members, nail each ply to the other and offset nail rows by 2" from the rows in the ply below. 2„ — 2„ 2' i 2„ 2„ 2, ... T r... 7 Assembly A Assembly B Assembly C Assembly D Assembly E Assembly F L 8D Nab a 3'°cNime E* Rests m F, WOOD STRUCTURAL PANEL [WSP] NOTES: MULTIPLE -MEMBER CONNECTIONS FOR WALL STUDS 2-PLY NAILING RECOMMENDATIONS For 2x4, 13/4" x 51/2", 24 13/4" x 71/4", and 2x8: Minimum of two rows of 16d (0.131" x 31/4") pneumatic nails at 10" on -center, staggered. Nail from one side. 3-PLY NAILING RECOMMENDATIONS For 2x4: Minimum of two rows of 16d (0.131" x 31/4") pneumatic nails at 8" on - center, staggered. For 13/4" x 51/2", 24 13/4" x 71/4", and 2x8: Minimum of three rows of 16d (0.131" x 31/4") pneumatic nails at 5" on -center, staggered. Nail from both sides. 4-PLY NAILING RECOMMENDATIONS For 2x4: Nail each ply to the other with a minimum of two rows of 16d (0.131" x 31/4") pneumatic nails at 5" on -center. When connecting each ply, offset nail rows by 2" from the ply below. For 13/4" x 51/2", 2x6, 13/4" x 71/4", and 2x8: Nail each ply to the other with a minimum of three rows of 16d (0.131" x 31/4") pneumatic nails at 5" on -center. When connecting each ply, offset nail rows by 2" from the ply below or Minimum of two rows of 1/2" diameter bolts spaced at 8" o.c Wood Structural Panels Shall be a Minimum Thickness of 7/16" and Be Installed as Follows: 1. Panels Shall Be Installed with Strength Axis Parallel to Studs. 2. All Horizontal Joists Shall Occur Over and Be Nailed to Framing. 3. On Single Story Construction, Panels Shall be Attached to Bottom Plates and Top Member of the Double Top Plate. 4. On Two Story Construction, Panels Shall be Attached to the Top Member of the Upper Double Top Plate and to Band Joist at Bottom of Panel. Upper Attachment of Lower Panel Shall be Made to Band Joist and Lower Attachment Made to Lowest Plate at First Floor Framing. 5. Horizontal Nail Spacing at Double Top Plates, Band Joists, and Girders Shall Be a Double Row of 8D Staggered @ 3 Inches o.c. Per Attached Figures. Est@ 3., o.c. @ en. Framing Member, TYP o � o D-1 D-2 D-3 D-4 F1 Typi"' CS ---�- Ins[allaiian eTie E d Flo°r- ST requires (CM2 nsmum Len0lh gth 2-2x studs) w9 \_ o ° - Nails not required in clear span s o Refer to note 5 Prrn9ae min. t aw a:mn« Ir CS uM CMST _ -- Eguan ae of spn ear ad .P I SIMPSON LCC SIMPSON CS-16 SIMPSON ECCQ SIMPSON H2.5A D-5 D-6 D-7 D- lI J SIMPSON LSCZ SIMPSON LSSJ SIMPSON LUS SIMPSON CCQ 2 x 6 P.T. LEDGER W/ 2 ROWS OF LEDGERLOK @ 16" o.c., 2" MIN. EDGE DISTANCE @ T&B, USE (4) SIMPSON DTT1Z EQ. SPACED, TYP. Tapered 2x8 P.T. @ 16" O.C. 3-2x6 P.T. GALVANIZED CURV STEEL BRACK SOLID Studs In W Behind Brack 3 BRACKET DETAIL N.T.S. HEADER SCHEDULE HEADER SIZE SUPPORTING ROOF ONLY SUPPORTING 1 STORY ABOVE I SUPPORTING 2 STORY ABOVE [3] 2x4 4'-0" MAX N/A N/A [3] 2x6 6-0" MAX 4'-0" MAX N/A [3] 2x8 84" MAX 6-0" MAX N/A [3) 2xl0 10'-0" MAX 8'-0" MAX 6-0" MAX DESIGN LOADS LOAD TYPE I VALUE FLOOR LOADS [1ST FLOOR] Live Load 140 psf Dead Load 112 psf FLOOR LOADS [2ND FLOORS] Live Load 130 psf Dead Load 112 psf ROOF LOADS Live Load 10 psf Dead Load 115 psf ROOF SNOW LOADS Pg 30 psf Pf 30 psf Ce 1 Ct 1 1 1 Snow Drift & Unbalanced Snow As Applicable WIND LOADS Basic Wind Speed 110 mph [3 sec gust] Build Category II 1 1.0 Building Classification Enclosed Exposure C Internal Pressure Coeficient +/-0.18 FASTENER SCHEDULE FOR STRUCTURAL MEMBERS JOIST TO SILL OR GIRDER TOE NAIL 3 -10D SOLE PLATE TO JOIST OR BLOCKING 16D @ 16" O.C. STUD TO SOLE PLATE 2-16D STUD TO TOP PLATE 2-16D DOUBLE STUDS FACE NAIL 2 Rows 1 OD @ 12" O.C. BUILT-UP HEADER TWO PIECES W/ 12" SPACER 16D @ 16" O.C. @ EDGE CEILING JOISTS TO PLATE, TOP PLATE 3-16D CEILING JOISTS TO PARALLEL RAFTERS 3 - 10D RAFTER TO PLATE, TOE NAIL 3-8D BUILT-UP CORNER STUDS 2 Rows 10D @ 12" O.C. RAFTERS TO RIDGE, VALLEY OR HIP RAFTERS 4-16D RAFTER TIES TO RAFTERS 3 -12D 3/4" SUBFLOOR TO JOISTS [EDGES] 8D @ 6" O.C. SUBFLOOR TO JOISTS [FIELD] 1 OD @ 6" O.C. 1/2" SHEATHING TO STUDS [EDGES] 8D @ 3" O.C. SHEATHING TO STUDS [FIELD] 8D @ 12" O.C. 1/2" SHEATHING TO STUDS [GABLE WALLS] 8D @ 3" O.C. 1/2" SHEATHING TO PT SILL AND TOP PLATE 8D @ 3" O.C. ROOF SHEATHING FASTENING [EDGE & FIELD] 18D @ 6" O.C. STRUCTURAL NOTES 1. Hold all rafters down to wall plate with Simpson H2.5A Tie. If toe nailing of rafters to ridge beams result in rafter end splitting or less than 1" of nail lenght in rafter wood, reinforce joint with joist hangers. 2.Fasten rafters to ridge beam with Simpson LSSU - series or Simpson straps over top of sheathing spaced at 16" o.c. 3.Use 2x6 collar ties at 16" o.c. or Simpson LSTA18 straps over top of sheathing spaced 16" o.c. 4. Band joists to be fastened with Simpson straps at 4' o.c. 5.Use dimensional blocking @48" o.c. in the first two joists and rafter bays. 7.Use double joist blocking bellow interior partition walls. FLIEGEL RESIDENCE 143 Pawkannawkut Dr South Yarmouth, MA 02664 FOR PERMITTING 02.10.2023 CLIENT: Aaron Fliegel 143 Pawkannawkut Dr S. Yarmouth, MA 02664 afleegs@icioud.com ENGINEERING: Michele Cudilo, P.E. 123 Cottonwood Lane Centerville, MA 02632-1979 mcudilo@comcast.net 508-737-8521 of MICHELE "Ni CUDILO NO,34774 STRUCTURAL FOR STRUCT. ONLY 02.10.2023 JOB # / 2023 - 05 STRUCTURAL DRAWINGS: Yoana K. Guzman 5 Madison Ct Nantucket, MA 02554 yoana.ackdesign@gmail.com 774-325-6705 STRUCTURAL SECTIONS & DETAILS S-3 RING OF DOUBLE'-EROSION/SILTATION STACKED AND FENCE TO BE INSTALLED ENTRENCHED /---CONTINUOUS PIECE OF GEOTEXTILE STRAW BALES FABRIC TO BE INSTALLED OVER SEDIMENT TRAP r-i SILT FENCE I 1"x2"x3'OAK BEANPOLES, 2 PER BALE ' BINDING WIRE OR TWINE «� FILTERED �� ACCUMULATED RUNOFF-7 r �I `SEDIMENT I DEWATERING FILTER FABRIC BAG 3 TO BE CLAMPED TO END OF HOSE HOSEFROM DEWATERING / PUMP CROSS SECTION OF DEWATERING SEDIMENT TRAP NOT TO SCALE NOTES: 1.) CONTRACTOR TO SIZE UP THE TRAP AS NECESSARY TO HANDLE DEWATERING OPERATIONS 2.) CONTRACTOR SHALL NOTIFY CONSERVATION COMMISSION AGENT PRIOR TO START OF ANY WORK ON THIS PROJECT. NOTES 1.) MAGNETIC MARKING TAPE SHALL BE PLACED ALONG THE TOP EDGE OF EACH SEPTIC SYSTEM COMPONENT. 2.) CONTRACTOR SHALL VERIFY SOIL CONDITIONS IN THE LOCATION OF THE PROPOSED LEACHING FACILITY TO ENSURE CONSISTENCY WITH TEST PIT DATA SHOWN ON THIS PLAN. REPORT TO ENGINEER AND LOCAL BOARD OF HEALTH IF SOILS ARE NOT CONSISTENT WITH TEST PIT DATA. CONTRACTOR TO CONTACT YARMOUTH HEALTH DEPARTMENT TO PERFORM OPEN HOLE INSPECTION PRIOR TO PLACING CLEAN COARSE SAND PER 310 CMR 15.255(3). 3.) ENTIRE PROPERTY IS NOT LOCATED WITHIN A MASS DEP ZONE II. 4.) SWING TIES SHOWN ON THIS PLAN ARE PROVIDED ONLY AS A COURTESY FOR THE INSTALLER. INSTALLER SHALL VERIFY SWING TIE MEASUREMENTS IN THE FIELD PRIOR TO INSTALLING THE SYSTEM. CONTRACTOR SHALL NOTIFY ENGINEER IF MEASUREMENTS APPEAR TO BE INCORRECT. 5.) MEAN HIGH WATER ELEVATION, AS SHOWN ON THIS PLAN, WAS BASED ON NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA) VDATUM SOFTWARE. 6.) ELECTRIC LINE FROM PUMP CHAMBER TO CONTROL PANEL AT THE BUILDING SHALL BE INSTALLED BY THE CONTRACTOR. ELECTRIC LINE TO BE ROUTED FROM PUMP CHAMBER TO BUILDING WITH THE LEAST AMOUNT OF DISTURBANCE TO THE PROPERTY AS POSSIBLE. 7.) LOCATION OF ALL ELECTRIC LINES SHOWN ON THIS PLAN IS APPROXIMATE ONLY. CONTRACTOR TO VERIFY LOCATION AT TIME OF INSTALLATION. 8.) SEE ARCHITECTURAL PLANS PREPARED BY OTHERS FOR ADDITION DETAILS AND SPECIFICATIONS INCLUDING INTERIOR RENOVATIONS. 4 w m W v* p O co Q Q Q O a o t MAP 25 LOT 25 #137 -0 EXISTING DWELLING (6�� (3 7o 1:�A G (2 5) J Q� HC-1--\�2G�g (1 � 4) O cr. GC-1 1a 0 it 115, #143°? RESERVE AREA EXISTING GARAGE 2-BEDROOM DWELLING / PROPOSED SEPTIC SWING -TIES & DIMENSIONS SCALE: 1" = 20' CONTRACTOR TO CONTACT YARMOUTH HEALTH DEPARTMENT TO PERFORM OPEN HOLE INSPECTION OF SAS PRIOR TO PLACING CLEAN COARSE SAND PER 310 CMR 15.255(3). DEWATERING SEDIMENT TRAP FOR PUMP CHAMBER & SAS EXCAVATIONS (see detail). CONTRACTOR TO ENLARGE SIZE, SHOULD IT BE NECESSARY DURING CONSTRUCTION (DO NOT ENCROACH WITHIN 50-FT WETLAND BUFFER ZONE) (3 ski / / N7a° 45' 4U X fXX x-- n LIJ / 208 x_X -XCE tTYP} cL � X.X .FEN 01 X � MAP 25 LOT 23 RAAP 7r; SITE PLAN SCALE: 1" = 10' INSTALL 1-1/4" PVC TO HOUSE. JOINTS TO BE MADE WATERTIGHT. WIRE PUMP AND FLOATS TO SIMPLEX CONTROL PANEL No. 1-CC2 NEMA-1 MFG. HOOVER INSTRUMENTS- NEMA 4 JUNCTION BOX CORROSION RESISTANT & LIQUID -TIGHT CABLE CONNECTORS SUPPORTED CONNECTORS SUPPORTED BY 1-1/4" PVC CONDUIT, JOINTS TO BE MADE WATERTIGHT 3„ 0 f+LARM 01 r` I PUMP ON -`_�- GW (d� EL.=2.7'± o / PUMP N OFF NOTE: PUMP MUST BE EQUIPPED WITH A HIGH LEVEL ALARM LOCATED IN THE BUILDING SERVED WHICH IS POWERED BY A CIRCUIT SEPARATE FROM THE CIRCUIT TO THE PUMP. HOISTING CABLE 7 x 19 STAINLESS STEEL 1/8" DIA. / 1,760 LB. STRENGTH 2"SCH. 40 TEE w/ CLEAN -OUT CAP 2" BALL VALVE w/ UNIONS SCH. 80 PVC GEORGE FISHER CO. MODEL NO. 560 u -2" SCH. 40 TO D-BOX 1/4" WEEP HOLE IN DISCHARGE PIPE 2" BALL CHECK VALVE SCH. 80 PVC 100 P.S.I. FLOWMATIC MODEL No. 208S (2) WIDE ANGLE CONTROL FLOATS o v 2" SCH. 40 PVC DISCHARGE PIPE (BARNES 073618) 1: PUMP ON/OFF 120 ACTIVATION BARNES SE411 PUMP; 0.4 H.P.; 115 V; 2: ALARM ACTIVATION IMP. DIA. 4.25" (MIN.); 2" DISCHARGE PASSING 1-1/2" SOLIDS OR EQUAL. 1,000 GALLON H-10 PIMP CHAMBER DETAIL NOT TO SCALE 5x2' U.P.#388/ 9 i \ EXISTING ELECTRIC LINE TO BE ROUTED AROUND SAS PROPOSED TOTAL 20 ARC 36 (Model #3613) PLASTIC CHAMBERS \5x2' IN A FIELD CONFIGURATION 7u, \\ EXISTING Sr\ APPROXIMATE �20 LOCATION ONLY) TO BE REMOVED & (P \\ RPn! /-\:^Fn , of r.1 F/�:n1 r`r)APC'1= SAND 70 WORK LIMIT LINE -PROP. THIGH (MAX.) 7 \� RETAINING WALL 5x2' L.P. 7 7 7 O G DOSING & STORAGE REQUIREMENTS DESIGN FLOW: 330 GPD DOSING REQUIRED: 3 CYCLES / DAY 330 GPD / 3 = 110 GALS/CYCLE DISTANCE REQUIRED BETWEEN PUMP ON AND PUMP OFF FLOATS: 110 GALS/CYCLE = 250 GAL/FT = 0.44 FT/CYCLE (USE 0.45TO PROVIDE FOR BACKFLOW) STORAGE REQUIRED ABOVE WORKING LEVEL: 330 GAL. STORAGE PROVIDED ABOVE WORKING LEVEL: 500 GAL. ZONING SCHEDULE RESIDENTIAL PRINCIPAL BUILDING ZONING DISTRICT: R-25 ZONING REGULATION REQ'D EXIST. PROP. FRONT YARD 30' MIN. 39.7' 39.7' SIDE YARD 15MIN. 12.8' 12.8' REAR YARD 20' MIN. NIA N/A BUILDING COVERAGE* 25% MAX. 17% 19% BUILDING HEIGHT 35MAX. < 35' < 35' *Proposed building coverage includes accessory buildings. ZONING SCHEDULE RESIDENTIAL ACCESSORY BUILDING ZONING DISTRICT: R-25 ZONING REGULATION REQ'D EXIST. PROP FRONT YARD 30' MIN. 27.7' N/A SIDE YARD** 6' MIN. 1.8' N/A REAR YARD** 6' MIN. N/A N/A BUILDING HEIGHT 1-ST. MAX. <1-ST N/A BUILDING AREA 150 sf MAX. < 150 sf N/A **Side and rear yard setbacks for accessory buildings less than one hundred fifty (150) square feet and single story (ST), shall be six (6) feet in all districts, but in no case built closer than twelve (12) feet to any other building RIVERFRONT ALTERATION: WITHIN 100' = 32 S.F. �XA BETWEEN 100' & 200' = 0 S.F.* TOTAL ALTERATION = 32 S.F. TOTAL RIVERFRONT AREA ON THE SITE = 13,500 S.F. *Septic work previously approved by the Yarmouth Health Department. Septic work not included in the above alteration areas. I \ I c� \ 7u, 4 ' Z Q Q N a d w �o m o a 0 N BUOYANCY CALCULATIONS PROPOSED 1,000 GAL. H-10 PUMP CHAMBER HIGH GROUNDWATER EL.= 2.7' TOP OF PUMP CHAMBER EL. = 6.08' BOTTOM OF PUMP CHAMBER EL. = 0.42' WATER DISPLACED = [2.7' - 0.42] x 8.5' x 4.83' = 94 C.F. WEIGHT OF DISPLACED WATER = 94 C.F. x 62.4 LB/C.F. = 5,866 LBS WEIGHT OF 1,000 GAL. H-10 PUMP CHAMBER = 8,240 LB:� SOIL COVER = (6.9' - 6.08') x 8.5' x 4.83' = 34 C.F. WEIGHT OF SOIL ABOVE TANK = 34 C.F. x 110 LB/C.F. = 3 740 LBS 8,240 + 3,740 = 11,980 LBS > 5,866 LBS; THEREFORE ACCEPTABLE SWING -TIES MEASUREMENTS DESCRIPTION HC-1 GC-1 PUMP CHAMBER IN (1) 28.5' 17.4' PUMP CHAMBER OUT (2) 27.5' 22.6' CHAMBER CORNER (3) 36.3' 27.6' CHAMBER CORNER (4) 37.4' 16.4' CHAMBER CORNER (5) 61.9' 33.6' CHAMBER CORNER (6) 61.3' 40.3' SLOPE VARIES 8" H x 18" L x 21.5" W BLOCKS MANUFACTURER CERTIFIES TO HEIGHT OF 6 FEET 6" OF 3/4" CRUSHED STONE - TO BE PLACED BEHIND AND BENEATH THE WALL 40 MIL GEOMEMBRANE LINER - TRIM CAP WITH CONT. ADHESIVE (AS PER MANUFACTURER'S RECOMMENDATIONS) TOP WALL EL. = 9.9'± (max.) HEIGHT 0o VARIES =1 I (=1 11= EMBED. 1.5" BURIAL FOR EVERY V HEIGHT COMPACTED GRANULAR BASE OR (OPTIONAL CONCRETE LEVELING PAN) KEYSTONE® "STANDARD" RETAINING WALL (TYP) NOT TO SCALE CONSERVATION COMMISSION REQUIREMENTS: 1.) No work of any kind shall occur on the Resource Area side of the work limit line. This line shall be established prior to any construction or work. 2.) All imported fill shall be clean and not contain any foreign debris such as cement, bituminous concrete, rubber, metal, trash, boulders, etc. 3.) Debris, including litter, shall be picked up immediately. Any excess material that is excavated from the job site shall be disposed of at a location approved by the Conservation Administrator or in a covered dumpster. No debris shall be allowed in a Wetland or Waterway. 4.) Washing of equipment/tools shall be done OFF -SITE or handled in a manner appropriate by the Conservation Administrator. 5.) No equipment shall be refueled, nor shall fuel be stored within 100 feet of a resource area. 6.) Any area that is disturbed during construction shall be revegetated immediately or as soon after as the growing season commences. Permanent stabilization shall be carried out in order to minimize erosion. 7.) The proposed sewage disposal system shall meet the applicable Title 5 wetlands setbacks as set forth by the Yarmouth Health Department. 8.) The "work limit" line shown on this plan shall be established with Erosion Controls (i.e. straw bales, staked filter fabric, bark mulch, "silt sacks", products made with rice straw, and other weed -free products or approved by the Yarmouth Conservation Commission). Hay bales are not allowed. The contractor is responsible to implement and maintain appropriate and adequate erosion controls measures throughout the construction process. LEGEND 50xO' EXISTING SPOT GRADE - - - 50 - EXISTING CONTOUR E PROPOSED CONTOUR F-50-1 PROPOSED SPOT GRADE GAS -- - EXISTING GAS LINE EXISTING UNDERGROUND ELECTRIC - EXISTING WATER LINE TEST PIT LOCATION C 13 2 11-16-22 1 10-8-22 REV. DATE EXISTING 1,000 GALLON SEPTIC TANK PROPOSED 1,000 GALLON H-10 PUMP CHAMBER PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED DISTRIBUTION BOX PROPOSED ARC 36 (#3613BD) CHAMBER MCP JLC Ownership; Add house addition, fireplace, balcony, etc. MCP JLC Remove 1-ft g.w. variance request & add reserve BY APP'D. DESCRIPTION PROPOSED ADDITION & SEPTIC PLAN PREPARED FOR: CAPE COD OZ PROPERTY II, LLC LOCATED AT 143 PAWKANNAWKUT DRIVE SOUTH YARMOUTH, MA 02664 SHEET 2 OF 2 SCALE: 1 INCH = 10 FT. DATE: JUNE 18, 2022 0 5 10 20 40 FEET j PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 Drawn By: MCP Designed By: MCP Checked By: JLC JOB No. 6237 F.F. EL. = 7.6± PROVIDE EXTENSION RISER WITH PROVIDE EXTENSION RISER COVER OVER INLET TO WITHIN 6" OVER OUTLET COVER TO FINISH GRADE OF F.G. (TYP. FOR S.T. AND P.C.) F.G. (TYP. FOR S.T. AND P.C.) @ FND. EL.= 7.2'± F.G. OVER TANK EL.= 7.2'± F.G. OVER P.C. EL.= 6.9' - 7.0' --- EL.-6.08' J:E 9" MIN. 36" MAX. 21" MIN. (TYP) PROP. - 2" DROP MIN. 3 . SCH. 3�� 40 PVC 3" DROP MAX. 9" TEE SLOPE @ 1°/ min. co ALL TEES TO BE t 1 14" L=13'± o „ T ON LINED UP DIRECTLY LIQUID 5.00' EL=2 75 II UNDER CENTER OF LEVEL ON RISER OPENINGS ___% - I PUMP 2. TEE TEE �- GW @ EL =2.7'� EL=2.20' UMP OFF EL=1.75' UNCTION BOX IISCONNECT 2" SCH. 40 TO D-BOX-7 22" ZABEL FILTER EL.-0.75' 6" CRUSHED STONE MODEL # A1801-4x22 EL.=0.42' 4.75' OVER MECHANICALLY (GAS BAFFLE ON BOTTOM) PROVIDE WATER -TIGHT SEAL AT COMPACTED BASE ALL PIPE PENETRATIONS (TYP) (FOR PUMP CHAMBER) LENGTH 8'-6" WIDTH 4'-10" DEPTH 5'-8" 1,000 GALLON SEPTIC TANK ' nor) r-Al I"^p r IHAMP17R 'CONTRACTOR TO VERIFY EXISTING ELEVATION PRIOR TO ANY WORK & NOTIFY ENGINEER IF DIFFERENT. II / / 1 1 I MAP 25 LOT 25 TANK SHALL BE INSTALLED ON A LEVEL STABLE BASE EXISTING 1,000 GAL. SEPTIC TANK & PROP. 1,000 GAL. H-10 PUMP CHAMBER NOT TO SCALE (DIMENSIONS PER ACME-SHOREY) DEWATERING SEDIMENT TRAP FOR \ PUMP CHAMBER & SAS EXCAVATIONS (see detail). CONTRACTOR TO ENLARGE SIZE, SHOULD IT BE NECESSARY DURING CONSTRUCTION (DO NOT ENCROACH WITHIN 50-FT WETLAND BUFFER ZONE) MAP 25 LOT 23 13,500± S.F. WORK LIMIT LINE 45' 40"E 208 E CE F >IU 41 z 01 MAP 25 LL z ir m LOT 23 a m Go1Zco 0 0 4" SCHEDULE 40 PVC MIN. SLOPE 1 % PROP. VENT WITH CHARCOAL FILTER TO ABOVE GRADE INSPECTION PORT WITH ACCESS BOX TO WITHIN 3" OF F.G. (SEE PLAN FOR LOCATION)---_ 1 36" MAX. I -TOP OF SAS / B.O. = 8.78' FINISHED GRADE OVER CHAMBERS = 9.9' - 9.6' SLOPE @ 2% MIN. 40 MIL GEOMEMBRANE LINER, 'TnD CI M/ - Q 74- IRAIAI \ 13 0.59' (TYP.) [7.13" (TYP) I 8.29' 7.70' 2.875' (34.5")�+ (STONELESS SYSTEM) 5.0' (TYP.) 4 CHAMBERS WIDE (TYP.) 5' MIN. 11.5' 5.0'-�-� 25.0' (REQ'D) (min.) 40 MIL GEOMEMBRANE LINER, GROUND WATER ELEV.= 2.7' (mottling) BOTTOM ELEV. = 3.78' (MAX.) CHAMBER PROFILE WRACK EL.=2.0'± CHAMBER END VIEW FILTER FABRIC NOTE #1: DRAPE THE FABRIC TO COMPLETELY M.H.W. EL.=1.4'± LINER TO BE INSTALLED AROUND SAS PERIMETER COVER THE PREVENT SOIL O INTRUSION. FABRIC: UVERED SIDEWALLS OSPUN BONDED, MADE F THE CHAMBERS OUP OF ARC 36 CHAMP"S (Model #3613) RET. WALL TO BE CONSTRUCTED NYLON FIBERS, HYDROPHILIC IN NATURE • WEIGHT: 0.35 - 1 OZ/YD2 NOT TO SCALE AROUND SAS PERIMETER • f' _ ►► TEST PIT DATA ` .•. _ woo_ •!� PERC NO. N/A OG MAP 25 LOT 24 -o PROPOSED 4" SCH. 40 PVC VENT PIPE �Z LE MATERIAL PROPOSED INSPECTION OF "C" SOIL & 5x2' EAN COARSE PORT WITH ACCESS BOX TO GRADE U.P.#388/19 AMR 15.255(3)� �. � � nib. \ EXISTING ELECTRIC LINE TO FINISH GRADE OVER D-BOX = 9.9'± REMOVABLE WATERTIGHT RISER TO WITHIN 6" OF FINISHED GRADE 5" DIA. OUTLET(S) f 9" MIN. 36"MAX. 2" PVC TEE 4" PVC OUT F TO SAS 1" 8.57'J 12" MIN. 6,. 8.40' 6" CRUSHED STONE d� OVER MECHANICALLY COMPACTED BASE 5 OUTLET DISTRIBUTION BOX TO BE INSTALLED ON A LEVEL STABLE BASE. FIRST TWO FEET OF OUTLET PIPES TO BE LAID LEVEL. CROSS SECTION VIEW DIS1-RIBUTION BOX DETAIL NOT TO SCALE SITE PLAN SCALE: 1" = 10' r� BE ROUTED AROUND SAS 5x4' PROPOSED TOTAL 20 ARC 36 (Model #3613) PLASTIC CHAMBERS cl \5x2' IN A FIELD CONFIGURATION - EXISTING SAS (APPROXIMATE �20 LOCATION ONLY) TO BE REMOVED &. NO REPLACED w/ CLEAN COARSE SAS$'' WORK LIMIT LINE \-..,_.---PROP. 3' HIGH (MAX.) RETAINING WALL 5x2' m 7, F\ `Z moo_ \ O \5x3' CONTRACTOR TO CONTACT YARMOUTH HEALTH DEPARTMENT TO PERFORM OPEN HOLE INSPECTION OF SAS PRIOR TO PLACING CLEAN COARSE SAND PER 310 CMR 15.255(3). 123 Zd Tidal Flat ;ea Gull Or Beach LOCUS PLAN SCALE: 1" = 1000' nESIGN DATA NUMBER OF BEDROOMS (EXISTING) 2 NUMBER OF BEDROOMS (DESIGN) 3 DESIGN FLOW 110 GAL/DAY/BEDROOM TOTAL DESIGN FLOW 330 GAL/CAY DESIGN FLOW x 200 % = 660 GAL/DAY USE EXISTING 1,000 GALLON SEPTIC TANK *SUBJECT PROPERTY IS NOT LOCATEC WITHIN A ZONE II. INSTALL 20 - ARC 36 (#3613BD) CHAMBERS SYSTEM CAPACITY (TOTAL L.F. OF CHAMBERS) (4.8 SF/LF) (0.74 GPD/SQ.FT.) = GPD (100') (4.8 SF/LF) (0.74 GAL/SQ.FT.) = 355.2 GAL. LEACHING / DAY TOTALS: TOTAL NUMBER OF CHAMBERS: 20 TOTAL LEACHING AREA: 480.0 TOTAL LEACHING CAPACITY: 355.2 NOTE: EFFECTIVE LEACHING AREA OF 4.80 SF/LF OBTAINED FROM THE DEPARTMENT OF ENVIRONMENTAL PROTECTION APPROVAL LETTER CERTIFICATION FOR GENERAL USE ISSUED TO INFILTRATOR WATER TECHNOLOGIES, LLC., MODIFIED JUNE 12, 2015. TRANSMITTAL # X264258. RESERVED FOR BOARD OF HEALTH USE INSPECTOR: Jay Gardiner (BOH) EVALUATOR: Michael Pimentel, EIT, CSE C.S.E. APPROVAL DATE: Oct. 27, 1999 DATE: April 28, 2022 TEST PIT #: 1 ELEV TOP = 6.20' ELEV WATER = 2.70' PERC RATE = < 2 min./inch DEPTH OF PERC = 30" - 48" TEXTURAL CLASS: I 30" Perc 4248 54" C 92" Fill Mottling- 42" StandinD a�54" 7 Med. to Coarse Sand 2.5Y 6/4 (5-10% gravel) GENPPA' NOTES 1. UNLESS OTHERWISE NOTED, ALL SYSTEM COMPONENTS AND CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH TITLE 5 OF THE STATE ENVIRONMENTAL CODE AND ANY APPLICABLE LOCAL RULES. 2. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY THE BOARD OF HEALTH AND THE I DESIGN ENGINEER. ! 3. 4" SCHEDULE 40 PVC PIPE WITH WATER TIGHT JOINTS SHALL BE USED IN DISPOSAL SYSTEM UNLESS OTHERWISE NOTED. 4. TO PREVENT BREAKOUT, THE PROPOSED FINISHED GRADE SHALL NOT BE LESS THAN ELEVATION = 8.78' FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE SAS. UNLESS A 40 MIL GEOMEMBRANE LINER IS PLACE AT LEAST FIVE FEET FROM S.A.S. AND THE TOP OF THE LINER IS NOT LESS THAN THE BREAKOUT ELEVATION. 5. SLOPE ALL SOLID PIPE AT 1.0% MINIMUM. 6, THIS SYSTEM IS NOT DESIGNED FOR A GARBAGE DISPOSAL. 7. LOCAL BOARD OF HEALTH AND DESIGN ENGINEER TO BE NOTIFIED PRIOR TO BACK FILLING WHEN SYSTEM IS NEARLY COMPLETE AND READY FOR INSPECTION. SYSTEM IS NOT TO BE BACK FILLED WITHOUT FIRST OBTAINING APPROVAL FROM BOARD OF HEALTH AND DESIGN ENGINEER. 8. ELEVATIONS BASED ON NAVD 88 DATUM. SEE BENCHMARK LOCATION AND ELEVATION AS SHOWN ON PLAN. 9. CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION THROUGH DIG -SAFE AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE AT 1-888-DIG-SAFE AND ANY OTHER APPLICABLE AGENCIES. REPORT ANY DISCREPANCIES TO THE DESIGN ENGINEER. 10. ALL JOINTS WHERE PIPE ENTERS AND EXITS CONC. STRUCTURES SHALL BE MADE WATERTIGHT. 11. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM f APPROPRIATE AUTHORITY. 12. ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS LOCATED UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, DRIVES, OR TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING. 13. DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES. 14. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY. REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY, FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3). 15. CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK. 16. PROPOSED PROJECT IS LOCATED WITHIN: ASSESSOR'S MAP 25 LOT 23 OWNER OF RECORD: CAPE COD OZ PROPERTY II, LLC ADDRESS: 169 METOXIT ROAD 6.20' CHJ I r tALIVIUU I rl, IVIH LMDOD FEMA FLOOD ZONE AE (EL.11) COMMUNITY PANEL # 25001CO588J 3.70' 17. DEED REFERENCE: BOOK 31058, PAGE 119 18. PLAN REFERENCE: PLAN BOOK 181, PAGE 125 2.70' 2 20' 19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION. 1.70' 20. THIS PLAN IS TO BE USED ONLY FOR SEPTIC SYSTEM INSTALLATION AND ADDITION CONSTRUCTION. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE. 21. A 4" PERFORATED SCH. 40 PVC PIPE SHALL BE PLACED IN A VERTICAL POSITION TO A DEPTH OF THE BOTTOM OF THE SAS AND EXTEND TO WITHIN 3" OF FINISH GRADE. A REMOVABLE THREADED CAP SHALL BE PLACED ON THE TOP TO ALLOW FOR INSPECTIONS. 22. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT. -1.47' LEGEND 50x0' EXISTING SPOT GRADE - 50 -- - - EXISTING CONTOUR --1= PROPOSED CONTOUR F-5-0-1 PROPOSED SPOT GRADE EXISTING GAS LINE r_ EXISTING UNDERGROUND ELECTRIC ---�`- EXISTING WATER LINE TEST PIT LOCATION EXISTING 1,000 GALLON SEPTIC TANK Q Q PROPOSED 1,000 GALLON H-10 PUMP CHAMBER PROPOSED 2" SOLID SCHEDULE 40 PVC FORCEMAIN PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE PROPOSED DISTRIBUTION BOX PROPOSED ARC 36 (#3613BD) CHAMBER 2 1 11-16-22 1 MCP JLC Ownership; Add house addition, fireplace, balcony, etc. 1 10-8-22 MCP JLC Remove 1-ft g.w. variance request & add reserve I REV. DATE BY APP'D. DESCRIPTION PROPOSED ADDITION & SEPTIC PLAN PREPARED FOR: CAPE COD OZ PROPERTY II, LLC LOCATED AT 143 PAWKANNAWKUT DRIVE SOUTH YARMOUTH, MA 02664 _ SHEET 1 OF 2 SCALE: 1 INCH = 10 FT. DATE: JUNE 18, 2022 0 5 10 20 40 FEET PREPARED BY: JC ENGINEERING, INC. 2854 CRANBERRY HIGHWAY EAST WAREHAM, MA 02538 508.273.0377 Drawn By: MCP Designed By: MCP Checked By: JLC JOB No. 6237