Loading...
HomeMy WebLinkAboutLetter of Repair Extension = TOWN OF YARMOUTH Board f Health 1 146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-24451 Health • Telephone(508)398-2231, ext. 1241 Division Fax(508) 760-3472 October 26, 2023 Joan T. Simpson Edward Simpson 500 Ocean Drive Unit W-6-C Juno Beach, FL 33408 Dear Joan & Edward Simpson: The Yarmouth Health office received (3)three Title 5 inspection reports for 316 Route 28, West Yarmouth, MA 02673.These reports identify the septic systems for this location to be in failure. Title 5 requires repairs to be made within 60 days. The Health Department has approved engineered plans for two systems. Both systems have now been inspected and restored to full compliance with Title 5.Additionally, due to the pending Comprehensive Wastewater System being installed adjacent to this property,the Department has approved a monitoring and pumping schedule for the remaining septic system. It is agreed that the system will be monitored and pumped, as needed, during the waiting period. The Wastewater System is expected to be operational in 2025. This Department authorizes the extension of the repair period, and it is understood that all three systems will be connected to the sewer system when available.This compliance extension applies to future owners as long as the present use of the property remains the same. Sincerely, CULd mes Gar 'ner Health Director cc: file Mark H. Boudreau, Atty