HomeMy WebLinkAboutEngineer Certification JC ENGINEERING, Inc.
Civil & Environmental Engineering
ip_' ` 2854 Cranberry Highway
Last Wareham, Massachusetts 02538
` Ph. 508-273-0377
October 11, 2023
Mr.Jay Gardiner
Health Director
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
1241 Route 28, South Yarmouth, Massachusetts
Dear Mr. Gardiner:
This letter is to certify that the new septic system located at 1241 Route 28 was constructed
in substantial compliance with the approved design plan entitled,Proposed Septic System
Upgrade, dated June 26, 2023, prepared-by our office. See attached as-built plan provided
by the installer(Robert B. Our Co., Inc.).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
•
OC1 2 3 2023
John L. Chur 11, Jr., PE, PI,S HEALTH DEPT
President
JLC/mcp
cc: RBO
File