Loading...
HomeMy WebLinkAboutEngineer Certification JC ENGINEERING, Inc. Civil & Environmental Engineering ip_' ` 2854 Cranberry Highway Last Wareham, Massachusetts 02538 ` Ph. 508-273-0377 October 11, 2023 Mr.Jay Gardiner Health Director Town of Yarmouth Health Division 1146 Route 28 South Yarmouth, MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 1241 Route 28, South Yarmouth, Massachusetts Dear Mr. Gardiner: This letter is to certify that the new septic system located at 1241 Route 28 was constructed in substantial compliance with the approved design plan entitled,Proposed Septic System Upgrade, dated June 26, 2023, prepared-by our office. See attached as-built plan provided by the installer(Robert B. Our Co., Inc.). Should you have any questions or comments, please do not hesitate to contact our office. Sincerely, • OC1 2 3 2023 John L. Chur 11, Jr., PE, PI,S HEALTH DEPT President JLC/mcp cc: RBO File