October 26, 2023 CEC Project No.: C17564.01
Yarmouth Conservation Commission Via Email & Hand Delivery
Attn: Brittany DiRienzo, Agent
1146 Route 28
South Yarmouth, MA 02664
Re: Certificate of Compliance Application Filing Package
Proposed Revetment Repair and Shorefront Stabilization
Gold Village Waterside LLC
681 Route 28
Yarmouth, MA
Map 32 Parcel 121
DEP File No: SE 83-2353
OOC Book 35453, Page 218
Dear Ms. DiRienzo and Commission Members:
On behalf of our client, Gold Village Waterside LLC, we are submitting a Certificate of Compliance
application filing package including an original check for municipal filing. The following items are enclosed:
• Yarmouth Conservation Administrative Checklist
• Form WPA-8A Request for Certificate of Compliance
• Statement of Compliance
• Copy of $75.00 check made payable to Town of Yarmouth for town filing fee
Please schedule this for your next available public hearing. If you have any questions or require additional
information, please give our office a call. Thank you.
Sincerely,
COASTAL ENGINEERING CO., INC.
Carla A. Davis
Enclosures: as stated
cc: Gold Village Waterside LLC
Catherine C. Ricks, Project Manager
D:\DOC\C17500\17564.01 - No physical folder\Permitting\LOCAL\COC - SE 83-2353\App Trans Letter.docx
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us
Rev 2/2023
Administrative Checklist
Certificate of Compliance
General Information:
•All filings must be made on Town of Yarmouth forms.
•All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
•Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
•Contact the Conservation Office if you need assistance.
Submitting an Application:
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzo@yarmouth.ma.us.
______ Signed statement from an Engineer or similar professional to who prepared the
approved plan. – Include in hardcopy and digital submission.
______ As-Built plan – Include in hardcopy and digital submission. Refer to 310 CMR
10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if
required*.
Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth”
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel-related Conservation documents.
CONSERVATION
OFFICE
X
X
X
N/A
X
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE 83-2353
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Gold Village Waterside LLC
Name
681 Route 28
Mailing Address
West Yarmouth
City/Town
MA
State
02673
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Gold Village Waterside LLC
Applicant
10/13/2022
Dated
SE 83-2353
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
681 Route 28
Street Address
West Yarmouth
City/Town
32
Assessors Map/Plat Number
121
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Gold Village Waterside LLC
Property Owner (if different)
Barnstable
County
35453
Book
218
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE 83-2353
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
October 20, 2023 CEC Project No.: C17564.01
Yarmouth Conservation Commission
Attn: Brittany DiRienzo, Agent
1146 Route 28
South Yarmouth, MA 02664
Re: Certificate of Compliance – Statement of Compliance
Proposed Revetment Repair and Shorefront Stabilization
Gold Village Waterside LLC
681 Route 28
Yarmouth, MA
Map 32 Parcel 121
DEP File No: SE 83-2353
OOC Book 35453, Page 218
Dear Ms. DiRienzo and Commission Members:
We have made final observation of the referenced project and find the work to be completed and in
substantial conformance with the plan titled “Emergency Revetment Repair Plan, Gold Village Waterside LLC”
dated 8/26/2022 and Order of Conditions issued on 10/13/2022.
Therefore, on behalf of Gold Village, LLC, we respectfully request a Certificate of Compliance be issued
for this project.
Please contact me if you have any questions or require additional information.
Very truly yours,
COASTAL ENGINEERING CO., INC.
Catherine C. Ricks, P.E.
Project Manager, Waterfront Marine Division
CCR/cad
Enclosure
cc: Gold Village Waterside LLC