HomeMy WebLinkAboutCOC request October 26, 2023 CEC Project No.: C17564.01 Yarmouth Conservation Commission Via Email & Hand Delivery Attn: Brittany DiRienzo, Agent 1146 Route 28 South Yarmouth, MA 02664 Re: Certificate of Compliance Application Filing Package Proposed Revetment Repair and Shorefront Stabilization Gold Village Waterside LLC 681 Route 28 Yarmouth, MA Map 32 Parcel 121 DEP File No: SE 83-2353 OOC Book 35453, Page 218 Dear Ms. DiRienzo and Commission Members: On behalf of our client, Gold Village Waterside LLC, we are submitting a Certificate of Compliance application filing package including an original check for municipal filing. The following items are enclosed: • Yarmouth Conservation Administrative Checklist • Form WPA-8A Request for Certificate of Compliance • Statement of Compliance • Copy of $75.00 check made payable to Town of Yarmouth for town filing fee Please schedule this for your next available public hearing. If you have any questions or require additional information, please give our office a call. Thank you. Sincerely, COASTAL ENGINEERING CO., INC. Carla A. Davis Enclosures: as stated cc: Gold Village Waterside LLC Catherine C. Ricks, Project Manager D:\DOC\C17500\17564.01 - No physical folder\Permitting\LOCAL\COC - SE 83-2353\App Trans Letter.docx Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us Rev 2/2023 Administrative Checklist Certificate of Compliance General Information: •All filings must be made on Town of Yarmouth forms. •All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule. •Failure to follow the Administrative Checklist shall result in an Administrative Incomplete Application and will not be scheduled for a Public Hearing. •Contact the Conservation Office if you need assistance. Submitting an Application: 1 complete hardcopy of the COC application, plan/sketch, and other supporting information to the Conservation Office - mailed to or dropped off at Town Hall. 1 complete pdf of the COC application, plan/sketch, and other supporting information emailed to bdirienzo@yarmouth.ma.us. ______ Signed statement from an Engineer or similar professional to who prepared the approved plan. – Include in hardcopy and digital submission. ______ As-Built plan – Include in hardcopy and digital submission. Refer to 310 CMR 10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if required*. Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth” and include property address in memo. All forms, Fee Schedule and Meeting schedule can be found at https://www.yarmouth.ma.us/696/Filing-Forms. *Click Yarmouth Street Index for parcel-related Conservation documents. CONSERVATION OFFICE X X X N/A X wpaform8a.doc •• rev. 5/29/14 Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE 83-2353 Provided by DEP A. Project Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. This request is being made by: Gold Village Waterside LLC Name 681 Route 28 Mailing Address West Yarmouth City/Town MA State 02673 Zip Code Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: Gold Village Waterside LLC Applicant 10/13/2022 Dated SE 83-2353 DEP File Number Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. 3. The project site is located at: 681 Route 28 Street Address West Yarmouth City/Town 32 Assessors Map/Plat Number 121 Parcel/Lot Number 4. The final Order of Conditions was recorded at the Registry of Deeds for: Gold Village Waterside LLC Property Owner (if different) Barnstable County 35453 Book 218 Page Certificate (if registered land) 5. This request is for certification that (check one): the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doc •• rev. 5/29/14 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A – Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 DEP File Number: SE 83-2353 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-your-city-or-town.html). October 20, 2023 CEC Project No.: C17564.01 Yarmouth Conservation Commission Attn: Brittany DiRienzo, Agent 1146 Route 28 South Yarmouth, MA 02664 Re: Certificate of Compliance – Statement of Compliance Proposed Revetment Repair and Shorefront Stabilization Gold Village Waterside LLC 681 Route 28 Yarmouth, MA Map 32 Parcel 121 DEP File No: SE 83-2353 OOC Book 35453, Page 218 Dear Ms. DiRienzo and Commission Members: We have made final observation of the referenced project and find the work to be completed and in substantial conformance with the plan titled “Emergency Revetment Repair Plan, Gold Village Waterside LLC” dated 8/26/2022 and Order of Conditions issued on 10/13/2022. Therefore, on behalf of Gold Village, LLC, we respectfully request a Certificate of Compliance be issued for this project. Please contact me if you have any questions or require additional information. Very truly yours, COASTAL ENGINEERING CO., INC. Catherine C. Ricks, P.E. Project Manager, Waterfront Marine Division CCR/cad Enclosure cc: Gold Village Waterside LLC