HomeMy WebLinkAboutControl Document 43020 5
Initial Construction Control Document
To be submitted with the building permit application by a
Registered Design Professional
per <<n
for work the ) edition of the
r' Massachusetts State Building Code, 780 CMR, Section 107.6.2
Project Title: interior Renovation Date: 4/30/2020
Property Address: 183 Main Street. West Yarmouth, MA 02673
Project: Check (x)one or both as applicable: New construction X Existing Construction
Project description: The project consists of an interior-only modification to the existing building to include an accessible
wheelchair lift accessing all 3 levels of the facility as noted on the drawings. Work scope is limited to reconfiguration of
interior partitions and millwork to accommodate the new lift. There is no change to the egress travel distance or change of
use associated with the new work.
i Kevin E Uniacke MA Registration Number: 20762 Expiration date: 8/31/2020.am a registered design/)ro/essional, and
hereby certify, to the best of my knowledge, information and belief,that I have prepared or directly supervised the
preparation of all design plans,computations and specifications concerning:
Entire Project X Architectural Structural Mechanical
Fire Protection Electrical Other:
for the above named project and that such plans,computations and specifications meet the applicable provisions of the
Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that 1 (or my designee)shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
1. Review, for conformance to this code and the design concept,shop drawings,samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The contractor shall be responsible for performing the work in accordance
with contract documents and shall he exclusively responsible for its construction means, methods, sequences and
procedures. and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports together with pertinent comments, in a form
acceptable to the building official.
Upon completion of the work, i shall submit to the building official a 'Final Construction Control Document'.
agE,O ARC,1FJI\ !
J"a\�Yctr c 44c,
Phone number: 508-734-52 36 4
''a no , 762
Email: kevinuni-ac> ii udaarchitects.com i ,
Building Official Use Only \�
Building Official Name: Permit No.: Date:
t t),1:Architects 486 High Plain Street Walpole MA 0208I one,>..
��` _1 Ia\t5081 ?;}_;?S(�