HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location A.M. Lot }7' •
Zone of Contribution: In_--_ Out Acreage
Street: ,"� ¢ ? Commercial: Residential: ./�
.:,, l'1L„,C�.3 Ai,
-----
Village: Floor Plan: L/
Bedrooms: _)
O«ner � '� I i I S�G L •i `-�v \- Installer: �,-(rit .�,cl I z ; v,ZA
Address: ) , ,,/,' e4 c, 6-=,fr,-, 7)If)
Phone: �; t i 7- `' Phone: �L-�, 1 ,?s.
Builder: Engineer: .
Address: S i j �C�,it,--:ti,:,1-.) `. _I
Phone:
Phone: Vic, �/ - --..3/,7
1. Required#of copies received NIA S I NO
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material,above water table -
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ----
5. Water;ine 10 ft from septic components Var.: `v -
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
1 12. System meets all other setback requirements Var.: F
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ''�/
15. System not in top or subsoil (A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System.neets slope requirements- min. 1/8", %"preferred
y
18. System meets breakout requirements PVC liner: Wall: (
19. Specified tee sizes are proper, gas baffle on outlet tee v
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal I
22. System E dequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade `/
25. Inspection port on plastic chambers/leach field �/
1 26. Electrica permit for pump chamber/Separate meter for duplexes J
27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size v
28. Septic tamk/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. En:*veer 'e_istered Sanitarian and Land Surve or stam.s/si:nature I .
33.H-201oacing is subject to vehicular traffic,groundwater
34.Title V Ao•lication and •ermit fee, installer si• •ature
35. Foundation footing mina 2 feet above ad'usted : ound water for new house
36. Deed Restriction required max. #bedrooms: max. flow: ✓/ _-
37. Check area lots for groundwater/Label groundwater in Assessor's Ma. gpdj
Plan reviewed by: