HomeMy WebLinkAboutStructural Engineering 102323 dab RECEIVED LOCT 2 6 2023 COASTAL BUILDING DEPARTMENT engineering co. BY — October 23, 2023 Project No: C23062.01 DAM Construction Attn.: Dwayne Martin 100 Independence Drive; Suite 7-915 Hyannis, MA 02601 508-221-0821 VIA EMAIL:jetamartinlljgmaii.com Subject: Structural-Engineering Consultation 67 South Street,South Yarmouth,MA Map ID:42/163(listed in Assessors Database under 65&67 South Street) Mr. Martin, This memorandum is a follow-up to the June 16, 2023 Coastal Engineering Company, Inc. (CEC) report that provided recommendations for structural repairs to the small residential building that had suffered from sill rot and potential foundation settlement. The June 16, 2023 report called for the installation of new (Sonotube-style) concrete piers, some with 10" diameters and some with 12" diameters. However, a Building Inspector visit, (confirmed later on October 19, 2023 by CEC), found that each of the ten (10) newly-installed concrete piers are only 8" in diameter. To address this non-conformance, CEC recommends that four (4) additional 8u-diameter concrete piers be installed according to the attached "Sketch 2 (Revised 10/23/2023)N. Each new concrete pier shall be placed on compacted soils at least 4 feet below finished grade. Thank you, Coastal Engineering Company, Inc. v�p�.�H OF MA . 60 Kevin Donovan, S.E. K I ' Structural Engineering Division Project Manager ' -4• / r,:a 4 • AN N, URAL i o.48972 'SS'ONAL G:\C23\C23062.01-DAM Construction-STR\Reports COASTALI ['rote iunal Engineers and Land Surveyors cos SHEET NO. 7ENGINEERING COMPANY,INC. CALCULATED BY - - DATE 6/,'r S / 7`_._� 508-255-6511 FAX:508-255-6700 www.CoastalEngineeringCompany.com 260 Cranberry Highway,Orleans,MA 02653 CHECKED BY DATE _ 1 0/23/2023 _ 24 Route 6A,Unit 3,Sandwich,MA 9 Amelia Drive,Nantucket,MA SCALE 10/23/2023 Revision: Revised notes are denoted in red. t4O Fkirlt This revision is made to address a constructed non-conformance. The non-conformance is that the ten(10)recently installed concrete piers 1, denoted on the 6/15/2023 Sketch 2 and on this 10/24/2023 Sketch 2 as 10"-diameter piers(`)and 12"-diameter piers(")were instead constructed as 8"-diameter piers. To address this non-conformance,install four(4)new 8"-diameter concrete — piers as where indicated. Ensure that the bottom of each pier is 4'-0"min. below finished grade. A Recently-installed 8"-diameter pier .14e Recently-installed 8"-diameter pier New 8"-diameter pier i, 'i, ( I F .'rtS�CrRf !�? -r } lifill a E RECEIVriD .1 ._ .._ - O-.rT 2_6_2023 i I BUILD NG DEPARTMENT + 'X B --T , rt.; .—fS 274%42 i0 s — ---- * - 4 i 41l' cl i----- s 4 ,, _� _E. "` _ __ (Revised 10/23/2023) 1 1 Lim l's r-=, os,rl or F) " S k6"?orZi-_S. RECEIVED 67 South Street,South Yarmouth MA Page 2 of 6 OCT 26 2023 BUILDING DEPARTMENT By. -- _ F. y SI* _ J + 4 a i 111 3 • • • • = 73 MEP-,: Photo 0: 67 South Street, South Yarmouth MA (photo circa 2019 courtesy of Google Earth)