October 23, 2023 Project No: C23062.01
DAM Construction
Attn.: Dwayne Martin
100 Independence Drive; Suite 7-915
Hyannis, MA 02601
508-221-0821
VIA EMAIL:jetamartinlljgmaii.com
Subject: Structural-Engineering Consultation
67 South Street,South Yarmouth,MA
Map ID:42/163(listed in Assessors Database under 65&67 South Street)
Mr. Martin,
This memorandum is a follow-up to the June 16, 2023 Coastal Engineering Company, Inc. (CEC) report
that provided recommendations for structural repairs to the small residential building that had suffered
from sill rot and potential foundation settlement.
The June 16, 2023 report called for the installation of new (Sonotube-style) concrete piers, some with 10"
diameters and some with 12" diameters. However, a Building Inspector visit, (confirmed later on October
19, 2023 by CEC), found that each of the ten (10) newly-installed concrete piers are only 8" in diameter.
To address this non-conformance, CEC recommends that four (4) additional 8u-diameter concrete piers be
installed according to the attached "Sketch 2 (Revised 10/23/2023)N. Each new concrete pier shall be
placed on compacted soils at least 4 feet below finished grade.
Thank you,
Coastal Engineering Company, Inc. v�p�.�H OF MA . 60
Kevin Donovan, S.E. K I '
Structural Engineering Division Project Manager ' -4•
/ r,:a 4 • AN N,
URAL i
o.48972
'SS'ONAL
G:\C23\C23062.01-DAM Construction-STR\Reports
COASTALI
['rote iunal Engineers and
Land Surveyors cos
SHEET NO. 7ENGINEERING
COMPANY,INC.
CALCULATED BY - - DATE 6/,'r S / 7`_._�
508-255-6511 FAX:508-255-6700 www.CoastalEngineeringCompany.com 260 Cranberry Highway,Orleans,MA 02653 CHECKED BY DATE _ 1 0/23/2023 _
24 Route 6A,Unit 3,Sandwich,MA
9 Amelia Drive,Nantucket,MA SCALE
10/23/2023 Revision:
Revised notes are denoted in red. t4O Fkirlt
This revision is made to address a constructed non-conformance.
The non-conformance is that the ten(10)recently installed concrete piers 1,
denoted on the 6/15/2023 Sketch 2 and on this 10/24/2023 Sketch 2
as 10"-diameter piers(`)and 12"-diameter piers(")were instead
constructed as 8"-diameter piers.
To address this non-conformance,install four(4)new 8"-diameter concrete
— piers as where indicated. Ensure that the bottom of each pier is 4'-0"min.
below finished grade.
A Recently-installed 8"-diameter pier
.14e Recently-installed 8"-diameter pier
New 8"-diameter pier
i, 'i,
( I F .'rtS�CrRf !�?
-r
}
lifill a
E RECEIVriD
.1
._ .._ -
O-.rT 2_6_2023 i
I
BUILD NG DEPARTMENT
+ 'X B --T
,
rt.; .—fS 274%42
i0
s
— ---- * -
4
i
41l'
cl
i-----
s 4 ,,
_� _E. "` _ __ (Revised 10/23/2023)
1 1
Lim l's r-=, os,rl or F) " S k6"?orZi-_S.
RECEIVED
67 South Street,South Yarmouth MA Page 2 of 6
OCT 26 2023
BUILDING DEPARTMENT
By. --
_ F. y SI*
_ J + 4
a i
111
3 •
•
•
• = 73
MEP-,:
Photo 0: 67 South Street, South Yarmouth MA (photo circa 2019 courtesy of Google Earth)