Loading...
HomeMy WebLinkAboutBLDR-23-9004 Stuctural Engineering 061423 ,66.60e -a23 /D4L1 PHILBROOK ENGINEERING & 107 BEACH STREET /7 / CONSTRUCTION DENNIS, MA 02638 1-508-385-8682 ENGINEERING DESIGN • CONSTRUCTION INSPECTIONS • BUILDING. ALTERATIONS & RENOVATIONS 14 June 2023 RECEIV ED To: Town of Yarmouth Building Department JUN 1 4 Attn: Mr. Tim Sears - Assistant Building Commissioner 2023 1146 Route 28 lir I] South Yarmouth, Massachusetts 02664 BUILDING DEPARTMENT Subject: Construction Inspections - Foundation, Wall & Roof Renovations Location: 5 Buckwood Way, South Yarmouth, MA Dear Mr. Sears: In accordance with Paras. R106.1 & R109.1.1 of the State Building Code this letter shall serve as a documentation of compliance by the foundation and frame to the building code. It includes review and the use of both the existing construction and a shallow foundation design. Construction has followed along w/ field observations to increase the lateral and vertical (gravity & uplift) connections. It is open for rough inspection: • Roof - Undersized 2"x 4" rafters were re-configured w/ additional web chords to create a modified W-style truss - nailed connections. • Wall - New walls are WFCM constructed w/ 6" o/c perimeter nailing including blocking at horizontal seams. Old walls were stiffened by adding additional studding and tying the ceiling to the gable. o Floor - The floor is new; short span 2"x 6" PT Joists and a flush framed PT Girt set on load points. At this point air-paper has been installed to create the stops for the closed cell spray-foam floor insulation - to be added after the framing inspection and before the sub-floor gets installed. • Foundation - The corner and line load points are supported on concrete piers (inspected 5 MAY 23) . The perimeter line was excavated to a coarse free-draining sand (non-frost susceptible) and filled w/ stone back to grade. The perimeter is closed to grade w/ an Azek skirtboard. I have been involved and on-site to observe work starting mid-April and have continued through to the present time. The framing will meet MAR 780, the Mass. 2015 State Building Code, 9th ed. and will be suit- able for its' intended occupany upon completion of the finish work. Respectfully submitted, 1 I V n�-,r �. -�-- 5c_13ucK, T. VARNUM PHILBROOK, ‘A OF Town of Yarmouth Permit No: BLD-21-007461 dtd. 24-JUN-2021 T VARNUM PHILBROOK MECHANICAL f) :Po ,s,4N s.30690 o ti�i' �ss ONAL Eti‘-‘ •