Loading...
HomeMy WebLinkAboutReview Checklist 4-tve,C5 V suv.,' 4 4ssessef @ 4 .--neds 4-) AP Pi TOWN OF YARMOUTH (hl4trij _ S EWAGErJ PLAN REVIEW CHECKLIST Location: i"' 1C i b � t Lot Zone of Contribution: In Out Acreage 2 Street: 4/ill Commercial: Residential: X �J AVM Village: Floor Plan: qe& # Bedrooms: Le Owner: Installer: Address: Phone: Phone: Builder: Engineer: Address: Phone: Phone: • �q ' % � -1Z- S� V) ' � 1 7-4 3 , N/A YES NO 1. Required # of copies received 2. Date of soils exam and percolation test not older than 2 years 1/ 3. 4-5 ft of naturally occurring pervious material, above water table I 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: VI 1 5. Water line 10 ft from septic components Var.: I 6. Benchmark indicated and shown-NGVD if near wetlands ! ✓l j eptic tank minimum 10 ft from foundation, deck Var.: 8.f'1( eaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �C I/II i ' . Leaching minimum 100 ft from wetlands Var.: 12 l S t i kw,ail 10. Leaching minimum 150 ft from drinking welV25 ft irrigation well 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1 �, 15. System not in top or subsoil(A,B horizons) or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements- min. 1/8", 1/4" preferred 18. System meets breakout requirements / q PVC liner: v Wall: 4 19. Specified tee sizes are proper, gas baffle on outlet tee j v 20. Sewage is under 10,000 gpd for parcel I 1 21. No garbage disposal 22. System adequately sized for its intended use 23. Minimum 6" stone or compacted below tank and dbox ✓ 1 24. Manhole covers within 6" of grade, pump chamber cover to grade i I 25. Inspection port on plastic chambers/leach field t i 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ j 27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking . 30. Buoyancy calculations for tank/pump chamber v 31. Engineer to inspect and certify soils: wall: commercial: 1/' ✓ , 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater ✓ , 34. Title V Application and permit fee, installer signature ✓ 35. Foundation footing min. 2 feet above adjusted ground water for new house 1/ 36. Deed Restriction required max. #bedrooms: max. flow: gpd t/ / 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: i7/1//4- 6,03/0;