Loading...
HomeMy WebLinkAboutEngineer Plan/V MASS COORDINATE SYSTEM MAINLAND ZONE MERIDIAN DETERMINED USING A CARLSON BRx7 GPS RTK UNIT COLLECTION DATE 09/27/2023 E #164 ROUTE 28 MAP 37 PARCEL 82.1.1 #174 ROUTE 28 MAP 37 PARCEL 91 PLAN SCALE t 16 20 30 40 Locus Map 018 TOWN BROOK AVENUE Sco% 1' = 600' BUCK/ / ISLAND ROAD 117 WOODBINE AVENUE MAP 37 PARCEL 95 #15 WOODBINE AVENUE MAP 37 PARCEL 94 A.A. L.L!.1.A, • . OF P^ CK 1N, J 3. DVIL I UIVt LtHlrhl I KtlgUrl UMUJJ - ICI. I TUN NOT TO SCALE 4' SCH. 40 PVC INSPECTION PORT F(PERFORATED WITHIN TRENCH) SCREW CAP WITHIN 3" OF F.G. (1 PER TRENCH) ESTABLISH VEGETATIVE COVER �\ + +++++ + ++++++ +}+.++++++++ }++}}++ - -t++ + ++ }+} +++++++i + + + }12 MIN -to } + },NATIVE BACKFlLL,++++++' ' + 4 } } + + 4 r + + f + i + } � + v ' 4 % +}+}+++}}+}+}36' MAX + °FIL1ERtFABRIC' + + .OVER TRENCH. +++++} + Ip�G . �p1 �� 'PVC :PIPE 3/4' TO 1 1/2 i 1 DOUBLE WASHED STONE 1. 1T CMR- MATERIAL P 5.255 3OR _ ,APPROVED NATIVE :. BACKFlLL- MATERIAL::.`.- 5' OVERDIG PRIMARY OVEkIG i inch = 20 feet 0' MIN /11 WOODBINE AVENUE MAP 37 PARCEL 93 #9 WOODBINE AVENUE MAP 37 PARCEL 92 (VACANT) MAIN HOUSE T.O.F. 26.6 F.G. =25.8f (MAIN HOUSE) ACCESSORY T.O.F = 26.Of F.G. =25.3t(ACCESSORY APARTMENT) APARTMENT (MAIN 11OUSr ll.:t LF) (ACCESSORY APARTMENT 801 LF TOP 4" SCH40 PVC PIPE ) 23.9 S=2.00% MIN. INV.= 23.00 (MAIN HOUSE) INV.= 22,75 INV.= 24.30 (ACCESSORY APARTMENT) NOTES (1) ALL SYSTEM COMPONENTS TO BE MARKED WITH MAGNETIC MARKING TAPE (2) ALL SYSTEM COMPONENTS WITHIN 10 FEET OF FOUNDATION ARE TO BE INSTALLED BY A LICENSED PLUMBER. (3) ALL SYSTEM COMPONENTS ARE TO BE WITHIN 36" OF FINISHED GRADE, UNLESS OTHERWISE NOTED. 2e DIX CAST IRON SECURABLE ACCESS COVER TO GRADE (WATERTIGHT) RISERS WITHIN 6' F.G.= 24.9f I RISERRISER If MIN. 36' MAX I _LIQU►D LEVEL 10" MIN. ' v.= 22.50 DESIGN CALCULATIONS SOIL TEXTURAL CLASS: CLASS I PERC. RATE: < 2 MINUTES/INCH NO. OF BEDROOMS: 3 DESIGN FLOW REQUIRED: 330 GPD SEPTIC TANK REQUIRED: 1,500 GALLONS SEPTIC TANK PROVIDED: 1,500 GALLONS PRIMARY LEACHING SYSTEM: RESERVE LEACHING SYSTEM: (1) STONE LEACHING TRENCH (4) LC-6 CONCRETE LEACHING CHAMBERS IN 3' WIDE x 64' LONG x 2' DEEP AN (10') WIDE x (30') LONG STONE BED WITH 12 INCHES OF STONE BELOW CHAMBERS EFFECTIVE LEACHING: EFFECTIVE LEACHING: 7 SF/LF x 64 LF = 448 SF 10' WIDE x .30' LONG x Z.QBELOW INVERT LOADING RATE = 0.74 GPD/SF BOTTOM AREA= 300 S.F. TOTAL= 460 S.F. FLOW PROVIDED: 332 GPD > 330 GPD SIDEWALL AREA= 160 S.F. LOADING RATE = 0.74 GPD/SF FLOW PROVIDED: 340 GPD > 330 GPD SOIL LOGS TP NO. I* TP NO. 2* GIRD. EL 24.7 GRD. EL 24.7 GW. EL NONE TO 14.7 GW. EL NONE TO 14.2 0' 24.7 0" 24.7 U U Q J a_ `mOuth .HBw ltb Depart >ent FILL TROVED FILL 0 i' 1O Date 64" 19.4 78" 18.2 Cl Cl MEDIUM SAND MEDIUM SAND 2.5Y 6/6 2.5Y 6/4 120" NO WATER FOUND 14.7 126' NO WATER FOUND 14.2 NO REDOX FOUND NO REDOX FOUND DATE PERFORMED: AUGUST 23, 2011 SOIL EVALUATOR: RON CADILLAC WITNESSED BY: AMY VON HONE, RS PERC. RATE: < 2 MPI SOIL CLASS: CLASS 1 MAX. GROUND WATER ELEV.: NONE TO 14.2t METHOD OF DETERMINATION: NO WATER OR REDOX FOUND (SEE SOIL REPORT FOR MORE DETAILED DESCRIPTION) *TEST HOLES TAKEN FROM TITLE 5 SITE PLAN PREPARED BY DOWN CAPE ENGINEERING, INC. dated NOVEMBER 23, 2020. EXCAVATION NOTE: THIS SYSTEM REQUIRES THE EXCAVATION & REMOVAL OF ALL UNSUITABLE SOIL WITHIN 5' OF THE SOIL ABSORPTION SYSTEM. SOIL SHALL BE EXCAVATED TO THE EXISTING Cl SAND LAYER, APPROXIMATELY 64" TO 78'. ENGINEER TO CONFIRM SOIL DEPTH PRIOR TO INSTALLATION. THE EXCAVATION SHALL BE INSPECTED BY THE DESIGN ENGINEER PRIOR TO BACKFILLING. SOIL IS TO BE REPLACED WITH SAND CONFORMING TO 310 CMR 15.255, CONSTRUCTION IN FILL CONTRACTOR IS RESPONSIBLE TO PROVIDE ENGINEER WITH SAND SAMPLE FOR SIEVE ANALYSIS, UPON REQUEST. 20' MIN CELLAR WALL M. 15' MIN CRAWLSPACE i D-BOX COVER WITHIN 6" OF GRADE F.G.= 24.6f IRRIGATION BOX COVER 4' SCH 40 PVC INSPECTION PORT (PERFORATED WITHIN STONE) SCREW ON CAP WITHIN 3" OF F.G. F.G.=24.9f to 24 6f FIRST 2' SET LEVEL TOP 'CH PVC 4" SC2-H. -k L P.V.C. 22.32 =1.00% MIN. (20t LF) INV.= 22.01 S=1.=21.84 a7H_... o 6' COMPACTED STONE INV. BASE ON COMPACTED 12" MIN. 36" MAX. MIN. 2% SLOPE OVER S.A.S. FILTERj FABRIC TOTOP OO II II 11 VENT WITH CHARCOAL FILTER z J 10' MIN. m w a_ 0 m a- INV.=_2.1.50 BoT. =19.50 � �--INSTALL A100 ZABEL FILTER o.o o^, o.o o^, o.a 01. o.- 01c 0.0 o., 0.0 o.o (SEE MANF. INST.) INV.=21.82 SUBGRADE (TYP.) 4" PERF. SCH. 40 P.V.C. BOTTOM SET LEVEL S=0.5% ��/ 6' COMPACTED STONE PROPOSED DISTRIBUTION BOX PRE -CAST WATERTIGHT " ' 34TO 1 12DOUBLE / / 5' MIN. BASE ON COMPACTED PROPOSED 1,500 GALLON 6' MIN. SUMP WASHED STONE SUBGRADE (TYP.) PRECAST SEPTIC TANK - WATERTIGHT 12" MAX. DEPTH 64' (H-10 LOADING) SYSTEM PROFILE (H-10 LOADING) PROPOSED SOIL ABSORPTION SYSTEM NO GROUND WATER TANK TO BE EMBOSSED WITH ASTM STANDARD C 1227-93 SEAL NOT TO SCALE ACME-SHOREY ITEM#D65 (1) - STONE TRENCH (3' WIDE x 64' LONG x 2' DEEP) = TO EL 14.2f OR EQUAL - Notes 1. BENCHMARK: ELEVATION = 23.56 (NAVD88) TOP OF CONCRETE BOUND DISK 2. ALL CONSTRUCTION METHODS AND MATERIALS TO CONFORM TO TITLE 5 AND THE TOWN OF YARMOUTH BOARD OF HEALTH REGULATIONS. 3. ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 4. NO FIELD MODIFICATION TO THE SYSTEM SHALL BE MADE WITHOUT PRIOR WRITTEN APPROVAL OF THE DESIGN ENGINEER AND BOARD OF HEALTH. 5. ALL JOINTS AND COVERS TO BE WATERTIGHT. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION OF ANY EXISTING UTILITIES. 7. A CERTIFICATE OF COMPLIANCE MUST BE OBTAINED PRIOR TO BACKFILLING SYSTEM. 8. OWNER/APPLICANT CHRISTOPHER M. ROBERTS and LINDA M. ROBERTS Trustees of 12 TOWN BROOK ROAD REALTY TRUST 13 MILESTONE CROSSING NANTUCKET, MA 02554 9. DEED REFERENCE: Deed Bk: 35658 Pg:317 10. PLAN REFERENCE: Plan Bk: 16 Pg: 75 (Lots 8, 9, & PORTION OF 10) 11. THE DESIGN IS INTENDED TO MEET TITLE 5 AND OTHER APPLICABLE REQUIREMENTS. THIS PLAN DOES NOT GUARANTEE THAT THE SYSTEM WILL BE INSTALLED AS DESIGNED, NOR DOES THIS PLAN GUARANTEE THE OPERATION OF THE SYSTEM. 12. THIS SYSTEM IS NOT DESIGNED NOR INTENDED FOR USE WITH A GARBAGE GRINDER. 13. THE SYSTEM OWNER SHALL BE RESPONSIBLE TO PUMP THE SEPTIC TANK AT LEAST ONCE EVERY THREE YEARS. 14. LOCUS DOES FALL WITHIN A DESIGNATED OR POTENTIAL NATURAL RESOURCE AREA: NITROGEN SENSITIVE AREAS (NSA) FOR LEWIS BAY & HALLS CREEK. 15. LOCUS DOES NOT FALL WITHIN A ZONE II WELLHEAD PROTECTION AREA. 16. LOCUS DOES NOT FALL WITHIN AN NHESP ESTIMATED HABITAT OF RARE WILDLIFE and A PRIORITY HABITAT OF RARE SPECIES. 17. LOCUS DOES NOT FALL WITHIN A SPECIAL FLOOD HAZARD ZONE PER FIRM MAP 25001C-0567-J, dated 7/16/14. 18. CONTRACTOR TO COORDINATE PLACEMENT OF VENT WITH THE HOMEOWNER PRIOR TO INSTALLATION. N OV Prepared By. MACK I N 49 HERRING POND ROAD 19 OLD SOUTH ROAD BUZZARDS BAY, MA 02532 NANTUCKET, MA 02554 (tel) 508.833.0070 (tel) 508.326.0044 (fax) 508.833.2282 www.brackeneng.com PROPOSED SUBSURFACE SEWAGE DISPOSAL SYSTEM IN WEST YARMOUTH, MASSACHUSETTS Prepared For: 12 TOWN BROOK ROAD REALTY TRUST #12 TOWN BROOK ROAD MAP 37 PARCEL 90 No.1 Date I Revision Description I By Date: Drawn: Checked: Sheet: NOVEMBER 10, 2023 ERC/BET I DFB/AMG 1 of 1