Thanks for meeting us this morning. Summary of our site visit today:
The silt fence should be removed where possible by cutting it away where it is exposed. Portions that are buried or have
vegetation growing through may remain.
The compost sock at the most vertical portion of the bank should be removed (circled in yellow) ,and the sock retuned
into the bank and secured with metal anchors or stakes. The sock should be lifted upwards using machinery or by hand
and re-installed by staking or anchoring in place where it has slumped (blue circle). Bare areas in the approximately 3-
foot-wide space at the bottom of bank(and within the sock if possible) should be planted with high marsh/transitional
species such as Spartina patens, Distichlis spicata,Juncus gerardii, and Baccharis halimifolia. Best time to plant high
marsh grasses is between March 1 and June 15
The Expiration date is 6/15/2024 with covid tolling, and we will plan to deny the COC for re-application once the plants
have established.
Please let me know if you have any questions,
Brittany DiRienzo
Conservation Administrator
Town of Yarmouth
bdirienzo@yarmouth.ma.us
508-398-2231 x1288
From: DiRienzo, Brittany
Sent:Tuesday, November 14, 2023 3:07 PM
To: Healy, Kieran J. <khealy@bscgroup.com>
Subject: RE: 2 channel point dr, yarmouth meeting
Hi Kieran,
Sure, Ed would prefer 8:15 even, does that work? I will look into the correspondence.
Brittany DiRienzo
Conservation Administrator
Town of Yarmouth
bdirienzo@yarmouth.ma.us
508-398-2231 x1288
From: Healy, Kieran J. <khealy@bscgroup.com>
Sent:Tuesday, November 14, 2023 2:00 PM
To: DiRienzo, Brittany<BDiRienzo@yarmouth.ma.us>
Subject: RE: 2 channel point dr,yarmouth meeting
1