HomeMy WebLinkAboutStructural Engineering 10821 \ D\ RECEIVED
October 8, 2021—Stoughton, MA OCT 12 2021
To: BUILDING DEPARTMENT
By
Brad Inkley
Building Inspector
Town of Yarmouth, MA
CC:
Andrzej Dyko
Veranda of Cape Cod, LLC
RE: Change order, Veranda of Cape Cod, Cabana Construction
In regards of information from the "Veranda of Cape Cod"owner,there is lack of
availability of 8"X8" dimensional lumber for the construction of proposed cabana.Therefore,
we are approved the use of 8"X6"dimensional lumber to replace specified 8"X8" posts and
beams.Specification for the remaining lumber and appurtenances remains as specified on the
drawings and Construction Notes.
i
Designer: 41 /�
04:04 of 44.241
Jozip(aw ak PATRICK cti�
p
' • 'E1NORAyE N"
CIVIL
Approval Engineer: NO.33376
Patrick Roseigrave
\oisiNVSTAlts?
1