Loading...
HomeMy WebLinkAboutStructural Engineering 10821 \ D\ RECEIVED October 8, 2021—Stoughton, MA OCT 12 2021 To: BUILDING DEPARTMENT By Brad Inkley Building Inspector Town of Yarmouth, MA CC: Andrzej Dyko Veranda of Cape Cod, LLC RE: Change order, Veranda of Cape Cod, Cabana Construction In regards of information from the "Veranda of Cape Cod"owner,there is lack of availability of 8"X8" dimensional lumber for the construction of proposed cabana.Therefore, we are approved the use of 8"X6"dimensional lumber to replace specified 8"X8" posts and beams.Specification for the remaining lumber and appurtenances remains as specified on the drawings and Construction Notes. i Designer: 41 /� 04:04 of 44.241 Jozip(aw ak PATRICK cti� p ' • 'E1NORAyE N" CIVIL Approval Engineer: NO.33376 Patrick Roseigrave \oisiNVSTAlts? 1