Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Cf 6,?? Zone of Contribution: In Out_ Acreage Commercial: r - Residential: Street:4 01 i L!�0 5- '-i1 b A-,e ---- Village: S. Y Floor Plan: 1/.J #Bedrooms: Owner: 1 L e' piney LLG Installer:Teo 1/0.7I/S r _ Address: G 9 c- 6vwr7,e IN441--/b,. i4 yw iLikc'i"Is Phone: 'bps- 9$c/ /Phone: 4/:t- 9yj- ,s,Doc Builder: Engineer: P�h Coe Address: Phone: Phone: SD is-- 3 - /Sys 1. Required#of copies received NIA YES NO 2. Date of soils exam and percolation test not older than 2 years - 3. 4-5 ft of naturally occurring pervious material, above water table - -- - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: --- 5. Water line 10 ft from septic components Var.: . I - 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ✓ 13. Uses adjustment for maximum high groundwater Var.: L, i 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal V I6. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '''A"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal '� 22. System adequately sized for its intended use `., 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade _ 25. Inspection port on plastic chambers/leach field l/ 26. Electrical permit for pump chamber/Separate meter for duplexes ./` ✓ 27.Pump system-2"line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factorywaterproofed '/ 29. Vent provided if leaching below 3 feet,under driveway/parking `� 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33.H-20 loading is subject to vehicular traffic,groundwater ' %7 34.Title V Application and permit fee,installer signature t// 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ 37. Check area lots for groundwater/Label groundwater in Ass ' 's Map I I Plan reviewed by: //.. / 3 - - - co,o;