Loading...
HomeMy WebLinkAboutReview Checklist 6, _7,, r TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 21 Lot i‘f Zone of Contribution: In Out eage Street: - - 'J4 '1 Commercial: Residential: �y Village: r frill/ Floor Plan: ✓ #Bedrooms: . , Owner: 7 Installer: (:; 52� Address: Phone: - )"1O - f L? Phone: 7 7 /, Y i4 Builder: Engineer: Address: Phone: .- 9 7 -/(, 7 Phone: - /,, ,---'/ `7 '',,,-/- / N/A YES NO 1.Required#of copies received v' 2.Date of soils exam and percolation test not older than 2 years (�- 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: `,l 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands (..._-- 7. Septic tank minimum 10 ft from foundation, deck Var.: �/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: �-.--- 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: ��, 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom o le Var.: / f✓ 15. System not in top or subsoil(A,B horizons) or 5'remova 16.Proposed contours are suitable k_ /- 17. System meets slope requirements-min. 1/8", ' "preferred Lt.------- 18. System meets breakout requirements PVC liner:z i- r Wall: c/ 19. Specified tee sizes are proper, gas baffle on outlet tee / 1.,,. / ' , \._- 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal .22. System adequately sized for its intended use s_.---- 23.Minimum 6"stone or compacted below tank and dbox 4% 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field -� 26. Electrical permit for pump chamber/Separate meter for duplexes s."- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed �_____ 29. Vent provided if leaching below 3 feet, under driveway/parking s_ 30.Buoyancy calculations for tank/pump chamber _ ;e 31. Engineer to inspect and certify soils: wall: commerc l: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t 4 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature �-- 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03 I / I 74", .L`