HomeMy WebLinkAboutEngineer PlansMap 32
Parcel 116
(5.6)
Shed
Z V
D/W
',,(5.3
.r- r
30.5 ohw
"hw N L = 28.21'
12,900i SF d R = 25.0' /
L = 37.38' 1
R = 25.0' �
W 61'0 �
g 82.2310
Map 32
Parcel 102
N 82'23'10" E
See
Note
#19
Proposed
Addition
156.41'
Proposed ;
Garage
W�
20.12.0�
0'
Slab
Proposed
Water Line
Relocate /
Existing /
Water Line
W—
W ' DB
rH + +
++IV++')
S V
P PC
raA
osed 0
(5.6) �w
Youth Health Department
�. PROVED
Na'< _ Date
Existing I '
Deck
to be o ( 1
remove
.6'
Conc 90 r ^.�
— _ House #50
r-- 3 Bedroom
(5.5) C
Lot 20A
awkut prey
PaWkann gay)
t40' public
(5.8)
W W
W
CO o
rn Q
W O
/ 30
W
(5.
W
EXCAVATION NOTES
NOTE: 1) EXCAVATE ALL MATERNAL ABOVE SCYL NOR12M C (SEE DEEP CBZRVA77ON
HOLE LOG) , FAR A LATERAL DISTANCC OF 5'
LOCATION OF. UTILITIES 1 S APPROXIMATE AND ALL (HNERE POSSIBLE) IN ALL DNRECAONS BEYOND ME OUTER PERIMETER OF 7NE LEAamvc AREA.
?) FILL MATERNAL SHALL CAVSIST OF MrAN 07ANULAR SAND, Mr MOM ORGANIC
UNDERGROUND AND OVERHEAD UTILITIES MUST BE MATTER AND 07NER DELETERIOUS SLIBSrANCE.S WCN MEErS NE TEXTURAL
DETERMINED IN THE FIELD PRIOR TO COMMENCEMENT CRNrmA PUT FORTNNN SECnav 15.2-wy of nae 5.
OF ANY WORK, THIS INCLUDES, BUT NOT LIMITED TO, a) oF;7LI INTO n°�TASIVING SMUCAEp XCAVAAON PRIM TO PLACEMENT
REQUESTS TO DIGSAFE, ANY PRIVATE UTILITY COMPANIES +) PLACCn1.L ON/.YNwENBorrouSURFACEIsDRY
AND THE LOCAL WATER .DEPARTMENT.
�AOFP,1q
STEPHE
8.
W �SURv0-, �-.-
Zone R-25
25,000 Sq. Ft.
150' Frontage
Setbacks
Front 30'
Side 15',
Reor 20'
Maximum Coverage
Existing Coverage:
fropoSea Coverage:
25%
7.8f
18.5f
26
Rote
Howes Rood
LOCUS CM anoo
0
. Squont (A
Flood o
-'a
s yqr C s
4
o
r �
0
SOUTH YARMOUTH,
MA
SITE LOCUS
NOT TO SCALE
1.) Assessor's Map 24 Parcel 169
flBk 35019 Pg 285
PL BK 186 PG 33 Lot 20A
4.) This property is not in a Wellhead
Protection District
5.) This . property is' in Flood Zone AE EL. 11.0
Firm Map 25001 CO588J Dated 7/16/14
6.) Elevation Datum NAVD
RECEIVED
Site Plan for AUG 28 2023
Proposed HEALTH DEPT.
Septic and Addition
for
50 Neptune Lane
South �Yarmoufh, MA
Prepared for:
Andrew Gallagher
50 Neptune Lane
South Yarmouth, MA
Prepared by:
All Cape Septic and Survey
618 Route 28
West Yarmouth, MA 02673
(508) 771-4200
allcapeseptic®gmail.com
�04103123
Sheet 1 of 2
By. MA
I
Check: SM
I Dwg #562
A
3-1111110
MW
rr
GRAPHIC SCALE
( IN FEET )
1 inch = 20 ft.
EL=5.74t
TOP OF FOUNDATION
24" diameter concrete
covers raised to within 6" of
finish grode (or as noted)
Manhole cover to grade shall be
I steel cover and bolted to collar
2.94t I ~'
2.5
CONSTRUCTION NOTES
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000):
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
EL=5.2t
Floats thou be Installed
s t eTM n b reached /
r
3.8t
= 2' Delivery Line
M
O Zabel Filt
500V2.
1.500 Gal.
Gal. 9" " CHECK VALVE AND GATE VALVE
3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D-BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND
THE SOIL ABSORPTION SYSTEM S14ALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING
FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING OF PERFORATED 4" PVC PIPE PLACED
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN 1% OTHERWISE.
6,) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT, UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
B.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS OR WETLANDS WITHIN 150' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF l
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE ENGINEER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF- ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD U71UTIES PRIOR TO
COMMENCEMENT OF ANY WORK. THIS INCLUDES. BUT IS NOT LIMITED 70, REQUESTS TO DIGSAFE.
ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT.
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE. TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
HEAVY DUTY RIM/COVER
9" Cover
2" Dol wy Line
k7=2
7.42 71
r STOW SASE
Proposed
DB3 H-10 D-Box
HEAVY DUTY RIM/COVER
EL=8.5t t
9" Cover
7.7t GEOTEXTILE F
6.5
4" PVC VENT
& CAP BY "SWEETAIR"
EL=8.4±
Perforated 6" Sch 40 PVC 40 Mil
C Liner
�..-
' °0 3/4" tc
° .e_...1-1/2" ST
(Double w
SEWAGE PUMP, MYERS SRM-4 OR SIMLIAR 1-..,-t 12' X 38' LEACH FIELD
f5't 4 Two 4"ached- 40 PVC SET AT .005 '/' SLOPE
ON 6" DOUBLE WASHED 3/4" - 1 1/2" STONE
2000 GALLON
2-COMPARTMENT SEPTIC TANK FLOW PROFILE
NOT TO SCALE
ADJUSTED HIGH GROUNDWATER ELEV = 1.
OBSERVED HIGH GROUNDWATER ELEV = 1
BUOYANCY:
5.0'
u'
I'1
Top
Wall
7.8f
2.8'f Wolf
(Exposed)
5.6t Grade
4.8
12' 1
Retaining Wall
(N. r.S)
SYSTEM DESIGN CALCULATIONS
Test
2000 GALLON TWO COMPARTMENT SEPTIC TANK
6.5 x 12 = 178 SF x 3.56 x 62.4 = 17,231t Ibs
SEWAGE DESIGN FLOW: THREE BEDROOM DWELLING @ 110 GPD/BEDROOM = 330 GPD WEIGHT OF SEPTIC TANK (EMPTY): 20,0001 LBS OK
(MINIMUM DESIGN REQUIRED 330 GPD)
SEWAGE DESIGN FLOW PROVIDED: 12' X 38' LEACHFIELD WITH TWO
PUMP AND ALARM NOTES
SCH. 40 PERF. PVC PIPE
1) PUMP MUST BE INSTALLED ACCORDING TO MANUFACTUER'S
CAPACISTY 12' X 38' = 456 SO. FT.
SPECIFICATIONS.
456 SF X 0.74 GPD/SF = 337 GPD
2) USE MEYER OR GOULD 1/3 HP PUMP, OR EQUIVALENT
337 GPD PROVIDED > 330 GPD REQUIRED
3) PUMP MUST BE CAPABLE OF PASSING 2" SOLIDS
SEPTIC TANK CAPACITY REQUIRED: 330 GPD X 200 = 660 (MINIMUM)
4) ALARM MUST BE WIRED ON SEPARATE CURCUIT FROM PUMP.
SEPTIC TANK CAPACITY PROVIDED: 1,500 GALLON SEPTIC TANK
5) ELECTRICAL WORK TO BE INSPECTED BY WIRING INSPECTOR.
6) ALARM MUST BE LOCATED IN THE HOUSE.
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN FLOW
7) ZABEL FILTER REQUIRES REGULAR CLEANING
8) CONTRACTOR TO VERIFY CAPACITY AND EFFICACY OF
Hole 1 (EL=5.16t) TEST HOLE LOGS
EXISTING ELECTRICAL SYSTEM TO ACCOMIDATE PgbBOSED
PUMP SYSTEM PRIOR TO INSTALLING ANY COMPONENT
Depth
Elev.
Layer
Soil Class
Soil Color
0"-9"
4.4
A
Fill
9"-1got
3.6
B
Loamy Sand
10YR3/1
19"-36"
2.1
C
Loamy Sand
1OYR6/8
36"-120"
-4.8
C
Medium Sand
2.5Y7/4
DATE OF TESTING: 4/19/18
SOIL EVALUATOR: DAVID MASON, CSE
WITNESS: AMY VON HONE, RS YARMOUTH HEALTH AGENT
PERCOLATION RATE: LESS THAN < 2 MIN/INCH
GROUNDWATER ENCOUNTERED @ 50" EL = 1.0
NO MOTTLING ENCOUNTERED
ADJ HIGH GROUNDWATER TO BE VERIFIED BY A LICENSED
SOIL EVALUATOR PRIOR TO INSTALLATION
Proposed Septic Plan
Neptune Lane South Yarmouth, MA
_T 3 I
OFQASC'
Prepared for:
Andrew Gallagher
50 Neptune Lane
South -Yarmouth, MA
Prepared by:
All Cape Septic and Survey
618 Route 28
West Yarmouth,- MA 02673
(508) 771-4200
olicapeseptic@gmoil. tom
Date: 04/03/23
Sheet 2 of 2
Project No. AC-507-2