RE: Installation Approval letter for JULIE SHIGEKUNI -Structural only
Permit BLD-23-000234 (17 Station Ave,Yarmouth, MA 02664) I OCT 27 2022
To Whom ItMay Concern: BUILDING DEPARTCJIENT
On the above referenced project,the roof structural framing has been reviewed for additional loading due to the
installation of the solar PV addition to the roof. The structural review, including the plans and calculations
only apply to the section of roof that is directly supporting the solar PV system and its supporting elements.
EV Engineering has observed the PV installation that was specified for this project. The review was performed
to verify that the installation was performed in general conformance with the plans and specifications and that
any modifications were acceptable. Calculations were stamped &signed with my professional engineer's seal.
After engineer'sobservation, it is our opinion that the work has been completed in general conformance of the
provisions of the approved permits of the applicable code.
Please contact me with any questions or concerns regarding this project.