Loading...
BLD-23-0002354 structural 101422 V Vaeilik ENGINEERING EV ENGINEERING LLC 1825 Dahlia Drive Cumming GA 30040 276-220-0064 10/14/2022 SUNRUN RF: CEiVED RE: Installation Approval letter for JULIE SHIGEKUNI -Structural only Permit BLD-23-000234 (17 Station Ave,Yarmouth, MA 02664) I OCT 27 2022 To Whom ItMay Concern: BUILDING DEPARTCJIENT On the above referenced project,the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof. The structural review, including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system and its supporting elements. EV Engineering has observed the PV installation that was specified for this project. The review was performed to verify that the installation was performed in general conformance with the plans and specifications and that any modifications were acceptable. Calculations were stamped &signed with my professional engineer's seal. After engineer'sobservation, it is our opinion that the work has been completed in general conformance of the provisions of the approved permits of the applicable code. Please contact me with any questions or concerns regarding this project. Sincerely, STRUCT Vincent Mwumvaneza, PE ONL �tH Os EV Engineering, LLC �o��VINCFENMgsT 9c:%, MWUMVANEZA N CIVIL N • 41. 0101.0