Loading...
HomeMy WebLinkAboutReview Checklist p -�v� TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out_ Acreage Street:f�L/ (, (' pi - Commercial: Residential:___- Village: (). V Floor Plan: d c � �oams: Owner: cetp1 PcAP-K"LI i GL /14ei All( Installer: 1/r/' Address: ).' w',i Clt,,,..t -i-cr Phone: 11A Phone: . 3�SS3 Builder: Engineer: 1l' S L LYC & Address: Phone: ---t, Phone:_ 7 r`� � N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 yearsiv 3. 4-5 ft of naturally occurring pervious material, above water table -✓ - 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ---_-. 5. Water line 10 ft from septic components Var.: - 6. Benchmark indicated and shown-NGVD if near wetlands r--./ ;,,;`A,l i' tn,1x- 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: I t 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: `" 12. System meets all other setback requirements Var.: I 113. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above ad*. water or bottom of test hole ✓ 15. System not in top or subsoil (A,B horizons)or 5' removal Var.: I ✓ 1 1 6. Proposed contours are suitable 17. System meets slope requirements- min. 1/8", %"preferred / 18. S sternmeets breakout re.uirements I MI 19. Specified tee sizes are proper, gas baffle on outlet tee PVC liner: � Wall: 20. Sewage is under 10,000 gpd for parcel `f 21. No garbage disposal 22. System ade uately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox ...", 24. Manhole covers within 6"of grade, pump chamber cover to grade I 25. Inspection port on plastic chambers/leach field '/ 26. Electrical permit for pump chamber/Separate meter for duplexes ---'' 27. Pump system-2"line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parkin / 30. Buoyancy calculations for'tank/pump chamber 31. Engineer to inspect and certify soils: b/ I wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house V. 36. Deed Restriction required max. #bedrooms: max. flow: 37. Check area lots for groundwater/Label groundwater in Assessor's Map gpd l Plan reviewed by: /- coo;