HomeMy WebLinkAboutStructural Engineering 62122 DWD ENGINEERING, INC.
5 MICHAEL ROAD EAST BRIDGEWATER, MA 02333
(508)378-9602
domdean@aol.com
June 21, 2022
Mr. Brad Inkley-Building Inspector
Yarmouth Building Department
1146 Route 28
South Yarmouth, MA 02664
RE: Rough Frame Review-Jumes Residence
49 Doherty Lane-West Yarmouth, MA
Dear Mr. Inkley,
I have reviewed the rough frame and found that the work has been completed in accordance with the intent of the
design drawings prepared by this office, the International Residential Code (IRC 2015) with the Massachusetts State
Building Code Amendments, and generally accepted construction practice.
Regarding the nailing, I did review the nailing before the walls were wrapped and found that the nailing pattern as
well as the nails used were in conformance with the requirements of the design drawings.
Regarding the gable end walls, because the studs did not span continuously from the floor to the underside of the
roof I have instructed the owner to provide 24" long 1-1/4" x 20 gage straps at each stud centered on the double top plate
where the studs meet.
If you have any questions concerning this letter or if I can be of further assistance, please do not hesitate to
contact me.
Ae.
Sin �. OF 4
entz,44t11-A • P.E.
j' .IdintVCiURAL
Cc: James Jumes .5 9No,35062
AOxsF FG'STEr F`, A
ss�NAL VAC)\��41e