Loading...
HomeMy WebLinkAboutStructural Engineering 62122 DWD ENGINEERING, INC. 5 MICHAEL ROAD EAST BRIDGEWATER, MA 02333 (508)378-9602 domdean@aol.com June 21, 2022 Mr. Brad Inkley-Building Inspector Yarmouth Building Department 1146 Route 28 South Yarmouth, MA 02664 RE: Rough Frame Review-Jumes Residence 49 Doherty Lane-West Yarmouth, MA Dear Mr. Inkley, I have reviewed the rough frame and found that the work has been completed in accordance with the intent of the design drawings prepared by this office, the International Residential Code (IRC 2015) with the Massachusetts State Building Code Amendments, and generally accepted construction practice. Regarding the nailing, I did review the nailing before the walls were wrapped and found that the nailing pattern as well as the nails used were in conformance with the requirements of the design drawings. Regarding the gable end walls, because the studs did not span continuously from the floor to the underside of the roof I have instructed the owner to provide 24" long 1-1/4" x 20 gage straps at each stud centered on the double top plate where the studs meet. If you have any questions concerning this letter or if I can be of further assistance, please do not hesitate to contact me. Ae. Sin �. OF 4 entz,44t11-A • P.E. j' .IdintVCiURAL Cc: James Jumes .5 9No,35062 AOxsF FG'STEr F`, A ss�NAL VAC)\��41e