RE: Installation Approval letter for Mikaeny Rodrigues -Structural only
Permit BLD-22-006932(61 Lumberjack Trail,Yarmouth, MA,02673)
To Whom It May Concern:
On the above referenced project, the roof structural framing has been reviewed for additional loading
due to the installation of the solar PV addition to the roof.The structural review, including the plans and
calculations only apply to the section of roof that is directly supporting the solar PV system and its
supporting elements.
EV Engineering has observed the PV installation that was specified for this project. The review was
performed to verify that the installation was performed in general conformance with the plans and
specifications and that any modifications were acceptable. Calculations were stamped & signed with my
professional engineer's seal.
After engineer's observation, it is our opinion that the work has been completed in general
conformance of the provisions of the approved permits of the applicable code.
Please contact me with any questions or concerns regarding this project.
STRUCT
Sincerely, ONL �� OFMAss.9
Vincent Mwumvaneza, PE � VINCENT GP
O MWUMVANEZA
EV Engineering, LLC C.) CIVIL
N�.
�`f 0NAIENG
TOWN OF YARA1OUTI-1
BUILDING DEPARTMENT
1146 Route 28, South Yarmouth, MA 02664
508-398-2231 ext. 1261 Fax 508-398-0836
FINAL AFFIDAVIT FOR SOLAR INSTALLATION
I, ,6 rid, 4 A"..,1,.../.3 Lic. # ej-ov06,22.
1 AJsm / --- 1
‘ iotiv. 47( Z 6e-a 1
Property AddiVss
di.h.22- 0069 32.
Building Permit #
I,
&be: - 0Z-0669/7 7/(15120eZ (:?, itf)
Electrical Permit # Date Electrical Permit Fina
l
ized
Have installed the permitted solar system according to the manufactures
specifications and the Mass. State Building Code.
I do certify under pains and penalties of perjury that the information
provided is true and correct.
Perm. . lolder sign here