Loading...
HomeMy WebLinkAboutFema Final Cost 72622 TOWN F Y RMOL TH 1146 Route 4 Louth, MA 02664 RECEIVED 508-398-2231 e ` 1261 ` 508-398-0836 Office of the Bui1 .in o missioner JUL 2 6 2022 BUILDING DEPARTMENT FINAL COST AFFIDVIT FOR WORK IN FEMA FLOOD ZONE To the Building Commissioner, In accordance with 780 CMR Section 109 of the Massachusetts State Building Code, the total estimated cost of construction, including all related costs* of the building at /9 Y ',tJC ✓e and constructed,reconstructed, altered,repaired, or extended under building permit no. })--cagy 6O amounts to $ 37/ p S0 , I, ct (65vA ,being referred to as the owner/agent identified below,do solemnly swear that the statements made herein are strictly true, correct and made in good faith *Related construction costs include all work done with or concurrently with the work contemplated by the building permit including construction, reconstruction, repairs, demolition, HVAC work, etc. Furnishings and portable equipment are not part of the total construction costs. Signature of o er/agent OS,/ y/ Z� No i ign My Commission Expires toi wn i !(U"M/ R CHATTR Notary Seal: • ••• TARGET INSPECTIONS SUM ARY OF TOTAL DUCT LEAKAGE TESTING RESULTS FOR: Nunzio Napolitano Site Located at: 197 Pine Grove Road South Yarmouth, MA Project Number: 108E Duct Test Report Version: 1.0 Target Inspections Steven Grevelis P.O. Box 444 West Dennis, MA 02670 Phone: (888) 280-2108 Email: steve@targetinspections.com www.targetinspections.com Certified HERS Rater(RIN—4958795), BBRS Approved Third Party Tester(Documents Available on Request), & Microbial Professional Enclosures: - Summary of Results - Calibration Data PASS Based on testing of the total duct systems,the observed total duct leakage at the time of testing of the system was at or below the allowable limit(4 dm per 100 sq ft)as set forth in IECC 2018 with tested results of 1.39 cfm per 100 sq ft. Target inspections Summary o Testing Results Copyright 2010/2011 Disclaimer Although we seek tc provide the w most accurate rpof possible we cannot guarantee any findings may or may net changed din'onwronmental conditions or contractor doctsionslactions thatia7:*el beyond our control Target Inspections is not responsible for nom,ements as a resell< of our inspection Page 1 of 5 TARGET INSPECTIONS Testing Conditions May 4th, 2022 Wind — Calm 0 MPH Weather—Cloudy Outdoor Temperature—56° F Outdoor Relative Humidity—90% Barometric Pressure—29.83`r Target Inspections Summary of Testing Results Copyright 2010/2011 Disclaimer.Although we seek to provide the most accurate Information possible we cannot guarantee any findings may or may not be changed due to environmental conditions or contractor decisions/actions that are beyond our control. Target Inspections is not responsible for improvements as a resell of our inspection. Page 2 of 5 Total Duct Leakage Test TAR T!N5PINSPECT ws Test Date: 05/04/2022 Technician:Steven Grevelis Test File: 108E Heat Cool_197 Pine Grove Rd_S. Yarmouth Duct Building Address: 197 Pine Grove Road South Yarmouth, MA Equipment Used Retrotec—DU-200 Duct Blaster w/ DM32 Manometer Serial Numbers: FT9010674/404468 DM32 Factory Calibration Date: 10-23-2020 DM32 Next Factory Calibration Date by: 10-23-2025 Field Calibration of DU-200 Performed; 03-23-2022 Tubing Integrity Testing Performed on Site The home has 1 system outside of conditioned space that was tested: Test Results In accordance with IECC 2018 the maximum allowable total duct leakage is 4 cfm per 100 sq ft at+/- 25 pa in the rough or final stage. Currently MA Stretch Code Towns must meet the same requirements. Whole House square footage of conditioned space is 2090 square feet: - Maximum allowable leakage of 4 cfm per 100 sq ft=83.60 cfm: (4 cfm x 2090 sq ft/100 sq ft=83.60 cfm) System#1—Servicing the entire conditioned space- - Tested total duct leakage was 29.06 cfm @-25 pa Total duct leakage was 29.06 cfm = 1.39 cfm per 100 sq ft cfm=cubic feet per minute pa=pascals sq ft=square feet Target Inspections Summary of Testing Results Copyright 20 1 0120 1 1 Disciaimer-Although we seek to provide the most accurate information possible we cannot guarantee any findings may or may not be changed due to environmental conditions or contractor demons/actions that are beyond our control Target Inspections is not responsible for improvements as a result of our inspection. Page 3 of 5 � CoM~.usion TARGET INSPECTIONS Based on testing of the total duct systems, t�stin of the 8tDrbelow th2qbse/«gdtVta|duct/eakage at the ti of |E[CZO18vvith't '-'� '~su1� VftheaUowab|e |imhs /4cfn� perIO0sq #je� nme'�hin 1���c�nl ��r / --'~ results 1'3gcfn�per1OUm�ft Th` tmta|�uct|e - secno �~�sq `c - � eak��evvgo�B����fn�= The system aS installed meets the recommended guidelines and no further sealing is »equired Note l: Square footage provided by Nunzio Napo/itano. ' - 29.06 PHOTO SUMMARY � PHOTO SUMMARY Setup nf the tested system. Manometer reading nf the tested system. ' ouny�htumumn 1 Disclaimer: guaranteeany findings may or may not»°changed due* environmental conditions or----r-------n-that are beyond our Control. Target~~~~~~^ ~not responsible for improvements°"a="uit of our inspection Page 4ofS '-- TARGET INSPECTIONS � This inspection report is solely based on the conditions within the defined area at the time of inspection only and makes no express or implied warrant or guarantee as to future changes in condition or conditions outside of the described job scope. Sincerely, ! Steven G[eVe|' ' Certified HERS Rater mIN—uysx7ysL | m Certified Microbial Professional Target Inspections | uou°me,Afthough we seek to provide Summary of Tasting Results Copyright umm2n 1 the Most accurate e"=�"m"ww"m�" m�n*m*m»�u�"�^�������—'—~~~~~"�"�' w°�"� "mu°wam=dme� �m"��� -- ---~~~ Target'nsPectoonsw not respon�.for�rnprovemenm°"nrosuil