HomeMy WebLinkAboutCOC request SE83-1843L11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Project Information Important: 1 When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. r� 2. Upon completion of the work 3• authorized in an Order of Conditions, the property owner must request a Certificate of Compliance 4. from the issuing authority stating that the work or portion of the work has been satisfactorily completed. This request is being made by: Robert A. Braman, Jr. Name c/o Braman Surveying & Assoc., LLC, 61 Allen Street Mailing Address Marion City/Town 508-748-9669 Phone Number MA State This request is in reference to work regulated by a final Order of Conditions issued to Wayne G. Kurker Applicant 01 /05/08 SE83-1843 Dated DEP File Number The project site is located at: 21 Arlington Street _ _ Yarmouth Street Address City/Town 28 17 Assessors Map/Plat Number Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: DEP File Number: CFRR-1 RdR riuvaucu uy —F roes Wayne G. Kurker Property Owner (if different) Barnstable 23360 242 County Book Page Certificate (if registered land) 5. This request is for certification that (check one): ❑ the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ® the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). See attached letter ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform8a.doo -- rev. 5129/14 Page 1 of 2 L1Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 1 WPA Form 8A — Request for Certificate of Compliance SE83-1843 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office- for-you r-city-or-town. html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 BRAMAN SURVEYING & ASSOC., LLC 61 Allen Street, Marion, MA 508-748-9669 November 30, 2023 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: Wayne G. Kurker, 21 Arlington Street, SE83-1843 Dear Members, On behalf of Wayne G. Kurker, we request a Certificate of Compliance be issued for SE83-1843. The 1200 gallon settling/pump chamber and the improvement dredging have been completed in substantial compliance with the Order of Conditions. All other portions of the project have been incorporated into SE83-2215 Feel free to call if need any additional information or have any questions. Sincerely, Robert A. Bram , Jr., RPLS