HomeMy WebLinkAboutEngineer Certification 55 JC ENGINEERING, Inc.
n � --,4--ts: Civil & Environmental Engineering
k , 2854Cranberry Highway
rl East Wareham, Massachusetts 02538
di
Ph. 508-273-0377
November 27, 2023
Mr. Jay Gardiner
Health Director
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
42 Charles Street, South Yarmouth, Massachusetts
Dear Mr. Gardiner:
This letter is to certify that the new septic system located at 42 Charles Street was
constructed in substantial compliance with the approved design plan entitled, Proposed
Septic System Upgrade, dated October 23, 2023, prepared by our office. See attached as-
built plan provided by the installer(Robert B. Our Co., Inc.).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
/Aya,
John L. Chu Ill, Jr., PE,PLS
President
JLC/mcp
cc: RBO
File
/\