Loading...
HomeMy WebLinkAboutEngineer Certification 55 JC ENGINEERING, Inc. n � --,4--ts: Civil & Environmental Engineering k , 2854Cranberry Highway rl East Wareham, Massachusetts 02538 di Ph. 508-273-0377 November 27, 2023 Mr. Jay Gardiner Health Director Town of Yarmouth Health Division 1146 Route 28 South Yarmouth, MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 42 Charles Street, South Yarmouth, Massachusetts Dear Mr. Gardiner: This letter is to certify that the new septic system located at 42 Charles Street was constructed in substantial compliance with the approved design plan entitled, Proposed Septic System Upgrade, dated October 23, 2023, prepared by our office. See attached as- built plan provided by the installer(Robert B. Our Co., Inc.). Should you have any questions or comments, please do not hesitate to contact our office. Sincerely, /Aya, John L. Chu Ill, Jr., PE,PLS President JLC/mcp cc: RBO File /\