Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In_ Out Acreage Street: Village: Floor Plan:Commercial:__ Residential: ---- # Bedrooms:_ Owner: Installer: Address: Phone: Phone: Builder: Engineer: Address: Phone: Phone: 1. Re.uired#of copies received N A NO inimi 2. Date of soils exam and .ercolation test not older than 2 years ' 3.4-5 ft of naturall occurring .ervious material, above water table 4. Foundation 2 ftabove hi•h .oint of road I 5. Water line 10 ft from s-.tic com.onents Var.: H'P' Fnd: Var.: 6. Benchmark indicated and shown-NGVD if near wetlands I 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leachi • minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: -- _ 9.Leachin• minimum 100 ft from wetlands Var.: I 10. Leachinb IIIIIIIIIIIIIIIII minimum 150 ft from drinking well/25 ft irrigation well Var.: IIIIIIIIIIIIIIIIIMIIIIIII 1L Tank/leaching minimum 10 ft from .ro.ert line Var.: L 12. System meets all other setback requirements Var.:1IIIIIIMIIIIIIIMIIIIIIII 3. Uses ad'ustment for maximum hio groundwater Var.: ...11.1111111111111 14. Leaching set 4-5 ft above ad'. water or bottom of test hole Var.: 15. S stem not in to. or subsoil (A,B horizons)or 5' removal _ 16. Pro.osed contours are suitable IIIIIIII 17. System meets slope requirements-min. 1/8", '/ preferred == 18. S stem meets breakout re.uirements 19. S.ecified tee sizes are .ro.er, as baffle on outlet tee PVC liner: Wall: 20. Sewage is under 10,000 :,.d for .arcel - __ 21. No garbage dis.osal _._- 22. System ade uately sized for its intended use _- 23.Minimum 6"stone or coma acted below tank and dbox 24. Manhole covers within 6"of a ade, .um. chamber cover to grade - 25. Inspection part on plastic chambers/leach field1111111111111111 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve, tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for-tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: • 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic,groundwater 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map • Plan reviewed by: