HomeMy WebLinkAboutEngineer PlansTOP OF FOUNDATION BROUGHT TO WITHIN 6" OF EL. 21.0' EL. 19.0' 4" CAST IRON or EQUIVALENT •"TR. nT IA + /Alt n=n Cf%e%-r - :� 'a��,ncv�l_� w� rv�. rarer IL 1�•y1 it 1 FLAW LINE :.'.. L.17.5. i0 - fF EL. 16.75'MI (DATUM: ASSUMED) 1500 GALLON SEPTIC TANK NB: ALL INTERIOR PLUMBING TO BE RE-ROUTED (PROPOSED) TOTO THE SEWER LINE AT THE PROPOSED LOCATION AND ELEVATION. Pf- Yarmout _ alth Department _ VEIL aA Name ate LEGEND GAS LINE _ W_ W W W. WATER LINE —E E E E--G- EXIST. ELECTRIC 99 EXIST. CONTOURS ---------- ® PROP. CONTOURS �/€ U.M. 1-1.4rUNDERGROUND UTIL. 16— VV / O PORCH O / DO 19 32.8' SEPTIC SYSTEM PROFILE ,DE not to scab 2" of I.' to.1" DOUBLE WASHED PEASTONE OR GEOTEXTILE 4" SCHEDULE 40 PVC PIPE FILTER FABRIC 10' 3.0% �C \ 5' 1% H-20 DBOX Flaherty Environmental Services P O. Box 331 SP. PORT W/I 3 OF GRADE Harwich, MA 02645 CLEAN SAND .� 774.994.9 166 EL. 19.0' 4" to 11" DOUBLE WASHED STONE \ \ A'9 EXISTING 4 BR DWELLING DECK nnoru� DECK Ic _ �9<� \ \ . CP 's> "0 PROP. VL' r; ' s ` ; . , • 1500 GS \ TH' 1 \28.2 .. \ DRIVEWAY 16,000 SF* \ / MAP 20 LOT 35 \ 16 18 BENCHMARK TOP OF RET. WA EL. 18.0'. 5 , Ii •bILKHNif/ L s SOIL ABSORPTION SYSTEM (3) 500 GALLON H-20 CHAMBERS WITH 4' STONE AROUND IN A 12.83' X 33.5' X 2' CONFIGURATION BOTTOM OF TEST HOLE EL. 9.0' USGS ADJUSTMENT: NIA GROUNDWATER ELEV: N/A N TH m (NO`1,4Z o A. STONE N No. 28980 •P p ST X SCALE: 1" = 30' REF. PB 26 PG 103 VENT IF REQUIRED 2_0' 5.0' EL. 9.0' LOCATION MAP NTS DATE 1112912023 REVISED: SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC/ DANIEL R. ROSENTHAL i 1 GROVE STREET (WEST) YARMOUTH, MA PAGE 1 OF2 GENERAL NOTES I DESIGN CALCULATIONS I Flaherty Environmental Services 1. ALL PRECAST COMPONENTS TO BE H-10 RATED. ALL COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2. THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER, 3. MUNICIPAL WATER IS AVAILABLE, 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS. 5. INSTALLER/CONTRACTOR TO REVIEW & VERIFY ALL ELEVATIONS AND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL RESPONSIBILITY. 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL UTILITIES AND NOTIFYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION. 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8. FINISH COVER OVER COMPONENTS IS NOT TO EXCEED 3' PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9. ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND, 10.ALL COMPONENTS TO BE PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. 11.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT. 12.NO KNOWN WETLANDS OR WELLS WITHIN 150 FEET OF PROPOSED LEACHING. 13, THIS IS NOT A CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES IS THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14.LOT IS SHOWN AS ASSESSOR'S MAP 20 PARCEL 35. 15. LOCUS PROPERTY'S PROPOSED SYSTEM APPEARS NOT TO BE WITHIN AN AQUIFER PROTECTION DISTRICT (ZONE II). NUMBER OFACTUAL BEDROOMS 4 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW (110 GAUBR/DAYX 4 BR) 440 GAL./DAY REQUIRED SEPTIC TANK CAPACITY 880 GAL. SIZE OF SEPTIC TANK 1500 GAL. (PROPOSED) SOIL CLASSIFICATION DESIGN PERCOLATION RATE EFFL DENT LOADING RATE LEACHING AREA (2) x (33.5'+ 12.83)(2) 33.5' x 12.83' 615 SF 0.74 1 <2 MINANCH (ASSUMED) 0.74 GAL./DAY/FT2 = 185 SF = 430 SF = 455 GPD USE (3) 500 GALLON H-20 CHAMBERS WITH 4' STONE INA 12.83'X 33.5' CONFIGURATIONAS DIAGRAMMED RESERVE LEACHING CAPACITY SOIL EVALUATION TESTHOLE#1 Evaluator: David D. RahertyJr., RS SE# 2755 BOHWitness: BarryLewis, BOH Date: November29, 2023 TH-i ELEV. 19.0' 0-- 12" 12'- 22" 22"- M' 33"- 120" G.W. ELEV N/A BOTTOM TH-1 ELEV. 9.0' FILL A LS f0YR312 B LS 101R 516 C MS 2.5Y 6/5 N/A P. 0. Box 331 SYSTEM DETAIL Harwich, MA 02645 774.994.1166 (NTS) O 12,83' 33.5' "l certify that on November 12, 2002, I have passed the examination approved by the Department of Environmental Protection and that the above analysis has been performed by me consistant with the required training, expertise, and experience described in 310 CMR 15.018(2)." SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC/ DANIEL R. ROSENTHAL 11 GROVE STREET (WEST) YARMOUTH, MA PAGE 2 OF 2 DATE: 1112912023