Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutEngineer PlanT.O.F. EL.= 45.5'±
IMMICU t"2"DAnC
PROPOSED EXTENSION RISER
WITH COVER OVER INLET &
OUTLET TO WITHIN 6" OF F.G.
@ FND. EL.= 44.6'± F.G. OVER TANK EL. = 44.4'±
PROPOSED 4"
SCH. 40 PVC
SEWER PIPE
611 311 3" DROP MAX 3 "9 71 �73 n E 9,, npr)p MIN II
1411
NTRACTOR TO PROVIDE
ECIFIED DROP BETWEEN
ET AND OUTLET CONTRACTOR CONTRACTOR SHALL OUTLET TEE
SHALL VERIFY SIZE 48" VERIFY CONDITION OF
AND CONDITION OF EXISTING TEES GAS BAFFLE
EXISTING SEPTIC AND REPLACE AS
TANK NECESSARY
EXISTING 1,000 GALLON CONCRETE SEPTIC TANK
r
SEPAITC-,""R-7-
NOT TO SCALE
FINISH GRADE OVER D-BOX= 44. 0'±
REMOVABLE WATER -TIGHT COVER OVER
RISER TO WITHIN 6" OF FINISHED GRADE
i 5" DIA. OUTLET(S)
9" MIN,
36" RISE To �v 5" DIA
T H
I
N OUTLETS)
C
TLE'
9., MIN.
MAX.A ,
L=29'i
�J PROVIDE WATERTIGHT
'nu JOINTS (TYP.)
4" PVC IN FROM ✓
SEPTIC TANK 4" PVC OUT TO
LEACHING FACILITY
0-
4 41.87 1.70
6" CRUSHED STONE
OVER MECHANICALLY
COMPACTED BASE
OUTLET DISTRIBUTION BOX
TO BE INSTALLED ON A LEVEL STABLE
BASE. FIRST TWO FEET OF OUTLET
PIPES TO BE LAID LEVEL,
CROSS SECTION VIEW
T!0j'\! [30"" DDETAIL
J;Z
D11 S' A I it-
3 U
NOT TO SCALE
GAS CAS ,:"-, -% (40,
w� AND 4,q cZ
S6(90
NZ
0
4y
Q
M)V:) 135 0
-5. LOT 203
// p4u
22,961:t S.F. 12"
C11 44-
PROPOSED
DISTRIBUTION BOX
PROPOSED THREE (3) 500
TP1
-10 LEACHING
GALLON H
I cb
TOF=45.5'± YX 0i CHAMFERS vi/STONE
�p 44x6'
r'. MAP 135
CID
V
0 vl
co
LOT 202.1
I;, X44.8
0
"A
0
V
0
Q�
2
co
L0
00 x44.5
S1 17%
43.1
CL
u-
0 X42.1
Lu
u Benchmark
ST Corner of Conc. Patio X46,2
L=6.12 Elev. = 45.04'
R=260.00 N.A,V.D. 88 x 42.6
MAP 135
LOT 182.1
)TES:
MAGNETIC MARKING TAPE SHALL BE PLACED ALONG THE TOP EDGE OF EACH
SEPTIC SYSTEM COMPONENT.
CONTRACTOR SHALL VERIFY SOIL CONDITIONS IN THE LOCATION OF THE
PROPOSED LEACHING FACILITY TO ENSURE CONSISTENCY WITH TEST PIT
DATA SHOWN ON THIS PLAN, REPORT TO ENGINEER AND LOCAL BOARD OF
HEALTH IF SOILS ARE NOT CONSISTENT WITH TEST PIT DATA.
ENTIRE PROPERTY IS NOT LOCATED WITHIN A MASS DEP ZONE 11.
SWING TIES SHOWN ON THIS PLAN ARE PROVIDED ONLY AS A COURTESY FOR
THE INSTALLER. INSTALLER SHALL VERIFY SWING TIE MEASUREMENTS IN THE
FIELD PRIOR TO INSTALLING THE SYSTEM. CONTRACTOR SHALL NOTIFY
ENGINEER IF MEASUREMENTS APPEAR TO BE INCORRECT IN THE FIELD.
SWING -TIES
DESCRIPTION
HCA
HC-2
CORNER OF STONE (1)
16.7'
21.2'
CORNER OF STONE (2)
43.3'
31.7'
CORNER OF STONE (3)
49.3'
40.8'
CORNER OF STONE (4)
28.8'
33.3'
SITE PLAN.
SCALE: 1" = 20'
21
4" SCHEDULE 40 PVC
MIN SLOPE 1%
9" MIN.
41.50' 365" MAX.
FINISH GRADE OVER CHAMBERS= 437 - 44.9'
SLOPE @ 2% MIN. OVER SYSTEM
TOP OF SAS = 42.33'
BREAKOUT EL = 42.001
39.501
L�MANNOkME�MM�� ��OOLWJ��
3/4" TO 1-1/2"
DOUBLE WASHED
STONE TO CROWN OF PIPE
1. UNLESS OTHERWISE NOTED, ALL SYSTEM COMPONENTS AND CONSTRUCTION
METHODS SHALL BE IN ACCORDANCE WITH TITLE 5 OF THE STATE ENVIRONMENTAL
2" OF 1/8" TO 1/2" DOUBLE WASHED
CODE AND ANY APPLICABLE LOCAL RULES.
STONE OR GEOTEXTILE FILTER FABRIC
2. ANY CHANGES TO THIS PLAN MUST BE APPROVED BY THE BOARD OF HEALTH AND THE
PLACE RISER ON ALL
DESIGN ENGINEER,
CHAMBERS wit PIPED
3. 4" SCHEDULE 40 PVC PIPE WITH WATER TIGHT JOINTS SHALL BE USED IN DISPOSAL
INLETS TO WITHIN 6"
SYSTEM UNLESS OTHERWISE NOTED.
OF FINISHED GRADE--*"'
4. TO PREVENT BREAKOUT, THE PROPOSED FINISHED GRADE SHALL NOT BE LESS THAN i
ELEVATION =42.00'FOR A DISTANCE OF IVAROUND THE PERIMETER OF THE SAS. UNLESS Agoo i
40 MIL GEOMEMBRANE LINER IS PLACE AT LEAST FIVE FEET FROM S.A.S. AND THE TOP OF !j
THE LINER IS NOT LESS THAN THE BREAKOUT ELEVATION.
5. SLOPE ALL SOLID PIPE AT 1.0% MINIMUM.
6, THIS SYSTEM IS NOT DESIGNED FOR A GARBAGE DISPOSAL.
00
C>
7. LOCAL BOARD OF HEALTH AND DESIGN ENGINEER TO BE NOTIFIED PRIOR TO BACK
oQo
i
FILLING WHEN SYSTEM IS NEARLY COMPLETE AND READY FOR INSPECTION. SYSTEM IS i
I
C) I
NOT TO RP BACK FII LED WITHOUT FIRST OBTAINING APPROVAL FROM BOARD OF HEALTH
GROUND WATER ELEV.= < 34.271
3 - 500 GALLON CHAMBERS 5' MIN.
TYPICAL CHAMBER PROFILE '-N
ca
c6
z
NOT TO SCALE
.1 //177l
.�
Ce ni
I o
Fatility
Ayr
LOCUS
- ZONE
04
V,
2
J., V
=4,0'
AND DESIGN ENGINEER.
4.83'- 8.
ELEVATIONS BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). SEE
(TYP')
BENCHMARK LOCATION AND ELEVATION SHOWN ON PLAN.
9.
CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION
12.83'
THROUGH DIG -SAFE AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE AT
CHAMBER® VIEW
1-888-DIG-SAFE AND ANY OTHER APPLICABLE AGENCIES. REPORT ANY DISCREPANCIES
TO THE DESIGN ENGINEER.
i 10.
ALL JOINTS WHERE PIPE ENTERS AND EXITS CONIC. STRUCTURES SHALL BE MADE WATERTIGHT.
11.
NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING
T I ,A'TA
REGULATIONS. OWNER/APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM
APPROPRIATE AUTHORITY.
PERC NO. N/A
12,
ALL SEPTIC SYSTEM COMPONENTS SHALL WITHSTAND H-10 LOADING UNLESS LOCATED
N INSPECTOR: Barry Lewis (BOH)
UNDER MORE THAN 3 FEET OF COVER OR LOCATED UNDER PAVEMENT, DRIVES, OR
EVALUATOR: Michael Pimentel, EIT, CSE
TRAVELED WAYS IN WHICH CASE THEY SHALL WITHSTAND H-20 LOADING.
C.S.E. APPROVAL DATE: Oct. 27,1999 13.
�
DOUBLE WASHED CRUSHED STONE SHALL BE FREE OF ALL DIRT, DUST AND FINES.
November 2, 2023
IZ DATE: -
V
1 14.
WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL LOAM, SUBSOIL AND UNSUITABLE
TEST PIT #: 1
MATERIAL IN AREA BENEATH AND FOR 5 FT. ON ALL SIDES OF LEACHING FACILITY,
ELEV TOP = 44.6U s
REPLACE ALL UNSUITABLE MATERIAL WITH CLEAN COARSE SAND FREE FROM CLAY,
FINES OR OTHER UNSUITABLE MATERIAL IN ACCORDANCE WITH 310 CMR 15.255(3).
ELEV WATER = < 34.271
15.
CONTRACTOR SHALL NOTIFY DESIGN ENGINEER OF ANY DISCREPANCIES FOUND IN
PERC RATE < 2 min./inch
SITE CONDITIONS FROM THOSE SHOWN PRIOR TO CONTINUATION OF WORK.
1 DEPTH OF PERC 30" - 48' 16.
PROPOSED PROJECT IS LOCATED WITHIN:
ASSESSOR'S MAP 135 LOT 203
TEXTURAL CLASS: I
OWNER OF RECORD: FLAVIA PASQUARELLO, EBED L. POPE, &
JONATHAN M. E. LORD
49 WIANNO ROAD
0
1 611
re I z
FA
i f` Q 4 t
30"
Perc
48"
9 jjj
C
O'� Y
-�B
0
A
LOCUS PLAN
SCALE: 1 1000'
YARMOUTH, MA
44,10'
FEMA FLOOD ZONE X
COMMUNITY PANEL # 25001CO579J-
17. DEED REFERENCE: L.C.C. 174400
4:2.10'
1 18. PLAN REFERENCE: L.C. PLAN 36848-B
40.60' 1
19. ALL DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITION.
20. PROPERTY LINE INFORMATION IS ONLY APPROXIMATE. THIS PLAN IS TO BE USED ONLY
FOR SEPTIC SYSTEM UPGRADE. JC ENGINEERING WILL NOT ASSUME ANY LIABILITY
FOR USES OF THIS PLAN OTHER THAN ITS INTENDED PURPOSE.
21. OWNER / APPLICANT / CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN ANY AND ALL
REQUIRED PERMITS AND APPROVALS FOR THIS PROJECT.
22, IN ACCORDANCE WITH 310 CMR 15.401 - 15.405, THE FOLLOWING LOCAL UPGRADE
APPROVAL IS REQUESTED FROM CMR 310 CMR 15.211:
1.) A 3.5"WAIVER (20.0'- 165) FOR THE SETBACK FROM SAS TO THE HOUSE FOUNDATION,
34 27'
No Mottling, Standing or Weeping Observed
G -)A I i
NUMBER OF BEDROOMS (EXISTING) 4
NUMBER OF BEDROOMS (DESIGN) 4
DESIGN FLOW 110 -GAL/DAY/BEDROOM
TOTAL DESIGN FLOW 440 GAL/DAY
DESIGN FLOW x 200 = 880 GAL/DAY
USE EXISTING 1,000 GALLON SEPTIC TANK
INSTALL 3 - 500 GAL. CHAMBERS w/ STONE
SIDEWALL CAPACITY
(LENGTH + WIDTH) (2 SIDES) (2' HIGH) (0.74 GPD/S.F.). = GAL/DAY
(33.5- + 12.83') (2) (2) (0.74 GPD/ S.F.) = 137.1 GAUDAY
BOTTOM CAPACITY
(LENGTH x WIDTH) (0.74 GPD/S.F.) = GAUDAY
(33.5'x 12.831) (0.74 GPD/S.F.) = 318.1 GAUDAY
TOTALS:
TOTAL NUMBER OF CHAMBERS 3
TOTAL LEACHING AREA 615.1
TOTAL LEACHING CAPACITY 455.2,
RESERVED FOR BOARD OF H
Loamy bana
I OYr 3/1
Loamy Sand
I OYr 516
Yam alth Department
ED
Name 'Dhte'
REV. __ 1 DATE__
1)
50X0, EXISTING SPOT GRADE
50 - - - EXISTING CONTOUR
50 PROPOSED CONTOUR
r-570 PROPOSED SPOT GRADE RECEIVED
i
GAS EXISTING GAS LINE DFC 1 12023
EXISTING UNDERGROUND ELECTRIC LINE
HEALTH DEPT.
C EXISTING UNDERGROUND CABLE LINE
EXISTING WATER LINE
EXISTING LANDSCAPED AREA
L TEST PIT LOCATION
EXISTING 1,000 GALLON SEPTIC TANK
PROPOSED 4" SOLID SCHEDULE 40 PVC PIPE
13 PROPOSED DISTRIBUTION BOX
O PROPOSED 500 GALLON LEACHING CHAMBER
j DESCRIPTION
PROPOSED SEPTIC SYSTEM UPGRADE
PREPARED FOR
ROBERT B. OUR CO., INC.
LOCATED AT
42 WIANNO ROAD
YARMOUTH, MA
SCALE: 1 INCH = 20 FT. DATE: DECEMBER 1, 2023
0 10 20 4 # 0 80 FEET
I I mmw
--- -- -- PREPARED BY
ic ENGINEERING, INC.
2854 CRANBERRY HIGHWAY
EAST WAREHAM, MA 02538
508.273.0377---------- ----
JOB No. 7392
Drawn By: MKV Designed By: MCP 1 Checked By: JLC